Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003.

Slides:



Advertisements
Similar presentations
IBL G. Darbo – INFN / Genova Roma, 5 September 2012 o IBL Stato e Richieste 2013 Riunione ATLAS / INFN Referee, 5 September 2012 G. Darbo – INFN.
Advertisements

ITSF STORE BUSINESS SOLUTION PRESENTATION. STORE MODULE INCLUDES: Material Management Purchasing Components Handling Shipments Receiving of parts Store.
Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001.
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
The ATLAS Pixel Detector
0ATLAS Pixel Mechanics meeting at LBNL 13 April 2000 P.Netchaeva, INFN/Genoa Study of bump stresses The aim of this study is to check the effect of stresses.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Status Update on Mechanical Prototype in Rome November 6,
31 août 2011 Didier Laporte – LPNHE Paris 1 IBL Integration Stave Review Université de Genève.
Barrel Module Database Presented at the SCT Barrel PAR 15 th May 2003 Dave Robinson, Cambridge Introduction - Database access - Barrel module data User.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
Sensor overview Ulrich Heintz Brown University, Providence, RI 6/18/2015U. Heintz - Sensor Overview 1.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Fall CIS 764 Database Systems Design L18.1 Miscellaneous Notes.
Magnetic Material Specification and Procurement Strategy Dawn Munson 1.
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: Calibration of Johansson measuring machine Cooling components Half-stave.
Database Status and Progress Dave Robinson, SCT Week, September 2003 Overview New Developments - Metrology & Datasheet uploads/reporting - Module Quality.
Frank Lehner U Zurich Proposal to use the Atlas SCT database for Run IIb  Why to switch now? u existing database (db) at UIC incomplete and unlikely to.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
M. Gilchriese -February 1999 X-Ray Inspection of Flip Chip Assemblies K. Einsweiler, M. Gilchriese and J. Richardson LBNL.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Back up stave test program status Eric VIGEOLAS Pixel week December 2000 Pre production status Assembling phase comments Geometrical control Stave Qualification.
1 FTK Rear Transition Module Mircea Bogdan The University of Chicago March 9, 2015 Production Readiness Review.
P i x e l C a r m e l Sept. 9, 2002M. Garcia-Sciveres - The ATLAS Pixel Detector1 The ATLAS Pixel Detector Pixel 2002 Workshop M. Garcia-Sciveres.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
8. February 2012 Thomas Bergauer (HEPHY Vienna) SVD Construction Database SVD-PXD meeting.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Bully Blue Lock Midterm Presentation 2014 Senior Design II.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
Marina Artuso1 Pixel notes Topics covered –Sensor –Front end electronics –Integration: Bump bonding (including roundtable featuring AMS,IZM, VTT)
FPCCD VTX Overview Yasuhiro Sugimoto KEK Tokubetsu-Suisin annual meeting 11.
M. Gilchriese - November 14, Module Decision - To Do List By pixel meetings associated with February 22-26, 1999 ATLAS week Beyond making and testing.
M. Gilchriese Pixel Update October 3, M. Gilchriese 2 Outline Barrel status and repair strategy Revised ATLAS installation schedule Finishing pixel.
1 MPW Design Introduction Course - Module 4 Process Description Part II Tyre pressure sensor (SensoNor)
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
3D sensors for tracking detectors: present and future applications C. Gemme (INFN Genova) Vertex 2013, Lake Starnberg, Germany, September 2013 Outline:
Electrical characterization results for wafers from different vendors Maria Rita Coluccia December 10, 2001.
Leonardo Rossi – EB 68 – Oct 5, Pixel status and schedule Rad-hard electronics (has always been) on the critical path for the construction of the.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Cathode Production Status Muon Week April10th 2003 A. Benvenuti INFN Bologna.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
Module mounting possibilities (FDR and module task force proposals) & Module mounting status at Dortmund Daniel Dobos, University of Dortmund
Silicon Strip Detector Section of LOI Editors: David Lynn (primary), Nigel Hessey (secondary) Subsections: 1.Silicon Strip Sensors 2.Strip System Front-End.
ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March 2011 o IBL ATLAS Italia / Referee CERN, March 2 nd 2010 G. Darbo – C. Meroni INFN / GE – MI Agenda:
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Straw man layout for ATLAS ID for SLHC
Study of Indium bumps for the ATLAS pixel detector
Thinning and Plans for SuperBelle
CALICE Silicon ECal Sensors Status and prospects
Hybrid Pixel R&D and Interconnect Technologies
Mechanics: (Tim).
Database requirements from ITk-Strips for DAQ loads
WG4 – Progress report R. Santoro and A. Tauro.
The Stave Thermo-Conductivity QC Procedure Idea
Mean positions should be shifted by ~50m
A Beam telescope for the EMC testbeam
Presentation transcript:

Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003

Pixel Week - Production update - 13 February P.Netchaeva INFN Genova 1 Sensors PDB readiness: Item tables + java application for Wafer upload (with sub-structures) + Report with links to Items exist. Test tables (-last update) + java applications for upload data and download data file + Reports exist. Missing: Last update of test tables. Data: 236 wafers: 201 CiS and 35 Tesla are registered. 121 wafers are with Visual inspection test results. 44 wafers are with Planarity test results. 24 wafers are with SCR test results. 0 wafers are with Thickness test results. Tiles: 478 IV tested (of 708) 36 ITS tested

Pixel Week - Production update - 13 February P.Netchaeva INFN Genova 2 Electronics PDB readiness: Item tables + java application for Wafer upload (with sub-structures) + Report with links to Items exist. FE and MCC “colours” + java applications for their upload + Reports for colour representation of these Items exist. Missing: New reticle layout will not change Item table, but will change java application for Wafer upload. Test definitions, as a consequence: Tables + java applications + Reports for tests. Data: 34 wafers with FEs and MCCs.

Pixel Week - Production update - 13 February P.Netchaeva INFN Genova 3 Bare Modules PDB readiness: Item tables + java application for Tile + 16 FE assembling + Report with links: to Items, to Bare Module Assembly sub-Items with link to future tests, to X-ray test data exist. Missing: Test definitions, as a consequence: Tables + java applications + Reports for tests. Data: 33 Bare Modules.

Pixel Week - Production update - 13 February P.Netchaeva INFN Genova 4 Flex Objects PDB readiness: Item tables + java applications for Flex+components, Flex+MCC assembling + Report with links to Items exist. Test tables + java application for upload + Reports exist. Missing: Our Flex Items all are called “Prototypes”. The PDB Item structure for production Items does not exist. Data: 166 FlexLoadedPrototype Items 46 FlexMCCPrototype Items. Missing: Test data.

Pixel Week - Production update - 13 February P.Netchaeva INFN Genova 5 Flex Objects: Modules PDB readiness: The Modules are Flex Object Items, so as for Flex Objects: Item tables + java applications for Flex with MCC + Bare Module assembling + Report with links to Items to Module Assembly sub-Items with link to future tests exist. Test IV + Report exist. Missing: Our Module Item is called “ModuleFEIPrototype”. The PDB structure for production Item “Module” does not exist. Test definitions, as a consequence: Tables + java applications + Reports for tests. Data: 23 ModuleFEIPrototype Items with substructures.

Pixel Week - Production update - 13 February P.Netchaeva INFN Genova 6 23 ModuleFEIPrototype Items:

Pixel Week - Production update - 13 February P.Netchaeva INFN Genova 7 Mechanics + Assemblies with Modules PDB readiness: Structures are defined. => the Items and Assemblies can be registered at least manually. Local Support test tables + java applications + Reports exist. Missing: java application to register Assemblies in the easy way. To start to think about: Tests for Staves (Bi-staves) and Sectors with Modules on them. Data: 200 Omegas are registered. 11 TMT-left are registered with CC test results. Missing (of existing Items): Al tubes, TMT-right, Sector parts. First Module is mounted on Sector: We need to accelerate… not registered…

Pixel Week - Production update - 13 February P.Netchaeva INFN Genova 8 Shipments PDB readiness: java applications for: send and receive Wafer (sensor or electronics) send just received Items without change receive an Assembly with the following update of all components location + Report with links to Shipments exist. Shipment statistics Report (Items shipped/time) exist. The activity of the manufacturers seems to be well covered by persons in charge. Missing: Send Electronics Wafer with new reticle layout. Data