LIGO-G070139-00-Z March 21, 2007 March 2007 LIGO/Virgo Meeting - DetChar 1 S5 Spectral Line Cataloguing Keith Thorne for the Spectral Line Working Group.

Slides:



Advertisements
Similar presentations
1 S5 Environmental Disturbances: August ‘06 Robert Schofield, U of O Erik Katsavounidis (MIT), Laura Cadonati (MIT), Michele Zanolin (MIT), Dennis Ugolini.
Advertisements

September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
E2 Correlations Nelson Christensen Carleton College LSC Detector Characterization LIGO-G Z.
E3/E4 Line Noise Investigation LIGO-G Z Sergey Klimenko Soma Mukherjee Bernard Whiting Bob Coldwell August 15, 2001 Outline  LLO line noise (E4.
LIGO - Fermi Sub-Threshold Search for the 1 st Advanced LIGO Science Run Jordan Camp NASA Goddard Space Flight Center Moriond Gravitation Meeting March.
LIGO- G Z March 22, 2006March 2006 LSC Meeting - DetChar 1 S5 Spectral Line Catalogue Status Keith Thorne (PSU) for the Spectral Line Catalogue.
LIGO-G Z 1 Listening to glitches Peter Saulson Syracuse University.
LIGO Reduced Data Sets E7 standard reduced data set RDS generation for future runs decimation examples LIGO-G Z Isabel Leonor (w/ Robert Schofield)
1 Status of Unbiased Search for Continuous-Wave Sources Dave Chin, Vladimir Dergachev, Keith Riles (University of Michigan) LIGO Scientific Collaboration.
1 Environmental Disturbances: S4 and Pre-S5 Robert Schofield, U of O Doug Cook, Fred Raab, Richard McCarthy, LHO I.Seismic up-conversion II.Some peak identification.
LIGO-G Z Camp orientation / overview K. Riles - University of Michigan 1 Orientation and Overview Keith Riles (University of Michigan)
1 Environmental Disturbances: Early S5 and S4 Robert Schofield, U of O Rana Adhikari, CIT, Richard McCarthy, John Worden, LHO I.HVAC flow rate reduction.
1 S4 Environmental Disturbances Robert Schofield, U of O John Worden, Richard McCarthy, Doug Cook, Hugh Radkins, LHO Josh Dalrymple, SU I.Pre-S4 “fixes”
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of Detector Characterization Activities Keith.
D Q 19 March. 2008LSC-Virgo meeting1 Status of Data Quality in Virgo D. Verkindt, LAPP-CNRS on behalf of the Virgo DQ team (M. Bizouard, L. Bosi, S. Chatterji,
1 Update on PEM - related activities: March 2012 Robert Schofield (Oregon), Anamaria Effler (LSU), Richard McCarthy (LHO), Rich Abbott (CIT), Thomas Abbott.
LIGO-G W Gregory Mendell, LIGO Hanford Observatory on behalf of the LIGO Scientific Collaboration Stackslide search for continuous gravitational.
LIGO-G Z NSF Review LIGO Scientific Collaboration - University of Michigan 1 LSC Participation in Initial LIGO Detector Characterization.
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
Waveburst DSO: current state, testing on S2 hardware burst injections Sergei Klimenko Igor Yakushin LSC meeting, March 2003 LIGO-G Z.
LIGO-G Z Detector Characterization SummaryK. Riles - University of Michigan 1 Summary of Detector Characterization Sessions Keith Riles (University.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
3 May 2011 VESF DA schoolD. Verkindt 1 Didier Verkindt Virgo-LAPP CNRS - Université de Savoie VESF Data Analysis School Data Quality and vetos.
LIGO-G Z Detector Characterization SummaryK. Riles - University of Michigan 1 Summary of Detector Characterization Sessions Keith Riles (University.
1 Environmental Coupling During S5 Robert Schofield (University of Oregon) I. PEM injection overview II.Acoustic/seismic coupling III.Seismic upconversion.
LIGO-G Z E7 Correlations Nelson Christensen, Russ Bainer - Carleton College Adrian Ottewill - University College Dublin Steve Penn - Syracuse.
GWDAW12, Dec , Cambridge MA1 Detection Confidence Tests for Burst and Inspiral Candidate Events Romain Gouaty *, for the LSC and the Virgo Collaboration.
S2 and S3 Correlation Studies Nelson Christensen Sarah Vigeland Physics and Astronomy Carleton College Detector Characterization Session LSC Meeting August.
1 GEO outlook Benno Willke (presented by Bernard Schutz) LSC meeting, MIT Nov 2006.
Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G Z.
LIGO-G Z Detchar Introduction (8/16/06)K. Riles - University of Michigan 1 StrainBandsMon and SixtyHertzMon Keith Riles (University of Michigan)
G D Commissioning Progress and Plans Hanford Observatory LSC Meeting, March 21, 2005 Stefan Ballmer.
G R LSC UL 13 Aug 011 Detector Characterization; Triggers, code infrastructure; Followup Analysis for the UL groups Nelson Christensen, Szabi.
C. Palomba - DA Meeting Update on the analysis of VSR1 data, focusing attention on the presence of spectral disturbances. More data  more.
LSC glitch group report Shourov K. Chatterji for the LSC glitch group LSC/Virgo meeting 2007 October 24 Hannover, Germany LIGO-G Z.
LIGO- G Z August 16, 2006August 2006 LSC Meeting - DetChar 1 Spectral Line Working Group Report Keith Thorne, Chair.
Detector Noise Characterization with the Hilbert-Huang Transform
LIGO-G Z Detector Characterization Software Tools K. Riles - University of Michigan 1 Status Report on CW Discriminator Work Keith.
LSC Meeting: 3/14/01Inspiral Upper Limit - Detector Characterization 1 Inspiral Upper Limit: Detector Characterization Needs Nelson Christensen Carleton.
LIGO-G Z Instrum. Lines and Blind CW Search K. Riles - University of Michigan 1 Status Report on Instrumental Line Catalog and Blind.
LIGO- G D E7: An Instrument-builder’s Perspective Stan Whitcomb LIGO Caltech LSC Meeting Upper Limits Plenary Session 22 May 2002 LIGO Livingston.
LIGO-G Z The Q Pipeline search for gravitational-wave bursts with LIGO Shourov K. Chatterji for the LIGO Scientific Collaboration APS Meeting.
LIGO-G Z Detchar Introduction (8/16/06)K. Riles - University of Michigan 1 SixtyHertzMon Update Junyi Zhang & Keith Riles (University of Michigan)
LIGO-G Z DMT Status for UL Analysis K. Riles - University of Michigan 1 DMT Monitors -- Status Update for Upper Limits Analysis.
LIGO-G Z Detector Characterization Issues K. Riles - University of Michigan 1 Detector Characterization Issues -- S2 Analysis & S3 Planning.
Proposing a DMT monitor for studying micro- seismic noise and up-conversions S. Mukherjee & R. Grosso UTB & U. Erlangen, Germany LSC Det Char Telecon,
LIGO-G Z Detector Characterization SummaryK. Riles - University of Michigan 1 Summary of Detector Characterization Sessions Keith Riles (University.
LIGO-G Z Detector Characterization Issues K. Riles - University of Michigan 1 Introduction to Detector Characterization Sessions Keith.
LIGO-G Z Detector Characterization SummaryK. Riles - University of Michigan 1 Summary of Detector Characterization Sessions Keith Riles (University.
LIGO-G Z Inspiral Upper Limits Detector Characterization Nelson Christensen Carleton College August 15, 2001.
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of the Detector Characterization Sessions Keith.
S.Klimenko, LSC March, 2001 Line Noise Investigation l Outline Ø Line Noise Investigation task Ø E2 data, line monitoring Ø Documentation Ø Lines observed.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
Igor Yakushin, December 2004, GWDAW-9 LIGO-G Z Status of the untriggered burst search in S3 LIGO data Igor Yakushin (LIGO Livingston Observatory)
LIGO-G Z Report on E3/E4 Lock Losses K. Riles - University of Michigan 1 Report on E3/E4 Lock Losses David Chin, Dick Gustafson Keith.
LIGO-G Z Report on the S2 RunK. Riles / S. Whitcomb 1 Report on the S2 Run Keith Riles (University of Michigan) Stan Whitcomb (LIGO–Caltech)
S.Klimenko, LSC meeting, March 2002 LineMonitor Sergey Klimenko University of Florida Other contributors: E.Daw (LSU), A.Sazonov(UF), J.Zweizig (Caltech)
3/21/2007 LIGO-G Z S5 Data Quality Investigation Status John Zweizig LIGO/Caltech LSC/Virgo DetChar Session MIT, July 25, 2007.
LIGO-G D Glitch Investigation Update Laura Cadonati for the Glitch Investigation Group LSC meeting, Hanford November 12, 2003.
Gravitational Wave Data Analysis  GW detectors  Signal processing: preparation  Noise spectral density  Matched filtering  Probability and statistics.
LIGO-G Z E4 Correlations: Detector Characterization Nelson Christensen Carleton College August 15, 2001.
LIGO-G Z The Q Pipeline search for gravitational-wave bursts with LIGO Shourov K. Chatterji for the LIGO Scientific Collaboration APS Meeting.
Regression of environmental noise in gravitational-wave detectors.
Virgo Status Detector Status Computing Data Analysis status and Plans
Detector Characterization
LIGO S6 Detector Characterization Studies
S2/S3 Glitch Investigation Update
Line tracking methods used in LineMon
First look at Injection of Burst Waveforms prior to S1
LIGO Scientific Collaboration - University of Michigan
Presentation transcript:

LIGO-G Z March 21, 2007 March 2007 LIGO/Virgo Meeting - DetChar 1 S5 Spectral Line Cataloguing Keith Thorne for the Spectral Line Working Group

LIGO-G Z March 21, 2007 March 2007 LIGO/Virgo Meeting - DetChar 2 Why Look at Spectral Lines? Direct impact on GW searches »Broad peaks cut into bandwidth (Pulsar) »Narrow L1/H1 coherences (Pulsar) »Broad H1/H2 coherences (Stochastic) »Non-stationarity in line sources causes transients (Burst) »They complicate data-conditioning filters (Burst) Indicate unwanted couplings into GW channel »Specific sources typically are at particular frequencies Can be used to monitor interferometer elements »Drumhead, body modes used to track test mass temperature

LIGO-G Z March 21, 2007 March 2007 LIGO/Virgo Meeting - DetChar 3 Spectral Line Measurement Control Room Investigations »Fourier, Spectral Coherence Tools (Schofield) »DMT Monitors - LineMon (Klimenko), SixtyHertzMon (Riles) Offline Studies »Daily Spectral Line-Finding Summary (KT) –Can also do special runs on any other channels »SFT-based Spectrograms (Dupuis) »Environmental Coherence Catalogue (Carleton College) Results from Search Groups »Narrow Lines seen in Pulsar Group analyses (Mendel, Riles) »Broader Coherences seen in Stochastic Group analyses –PEM - DARM_ERR coherences (Mandic, Fotopoulos)

LIGO-G Z March 21, 2007 March 2007 LIGO/Virgo Meeting - DetChar 4 Daily Line-Finding Pipeline Running since November 2005 Makes daily summaries of DARM_ERR spectral lines Reports on changes in lines prepared about every ~3 weeks

LIGO-G Z March 21, 2007 March 2007 LIGO/Virgo Meeting - DetChar 5 High-Frequency Line Search Extended to 8192Hz for Butterfly, Drumhead modes Supplanted by monitor of high-rate GW channel to track internal modes (to measure test mass temperature)

LIGO-G Z March 21, 2007 March 2007 LIGO/Virgo Meeting - DetChar 6 S5 H1/L1 Spectral Lines Pulsar searches are particularly concerned with lines that are coherent between the 4K detectors (H1, L1) Short Fourier Transforms (SFTs) were searched with Fscan and spectrograms prepared (Mendell, Dupuis) »Required  f of 2.2 x10 -4 (generous Doppler window), SNR > 4 »Found 3-Hz sidebands on 60Hz, 16Hz harmonics »Also coherences from violin modes, Duotone(?) near 1920Hz Quasi-stationary lines coincident within 10 mHz between H1 and L1 reported from PowerFlux (Riles) »Strongest were harmonics of 16 Hz These were used to focus later studies (to address issues most of need by pulsar group)

LIGO-G Z March 21, 2007 March 2007 LIGO/Virgo Meeting - DetChar 7 S5 Coherence Spectrograms

LIGO-G Z March 21, 2007 March 2007 LIGO/Virgo Meeting - DetChar 8 S5 H1-H2 Coherences Prepared by Stochastic Group Robert Schofield attempted feature identification (Sept 06)

LIGO-G Z March 21, 2007 March 2007 LIGO/Virgo Meeting - DetChar 9 January 2007 Commissioning Power supply ripple monitor installed to search for line sources (Schofield) »Fscan spectrograms prepared for ripple data (Mendel) »Long-mysterious 546, 564, 566, 646, 648Hz lines seen in +-15V center supply ripple! Mitigation attempt on 10Hz comb from IRIG-B 3-Hz sidebands of 60Hz tracked down to the Neslab PSL chiller (SCR pulsed heaters) 280Hz lines from power supply fans in 4K PSL Broad, wandering lines in spectrograms mitigated by improved cooling of H1 LSC racks

LIGO-G Z March 21, 2007 March 2007 LIGO/Virgo Meeting - DetChar 10 Environmental Coherence Catalogue Work done by Carleton College (Nelson Christensen, et.al.) Monthly analysis of coherence between GW channel and selected environmental channels 1024 s periods, mHz resolution Peaks identified as exceeding cutoff level at 3 sigma Also “mining” the same results for specific lines from the S5 pulsar searches Results for August, September 2006 ready »Web page:

LIGO-G Z March 21, 2007 March 2007 LIGO/Virgo Meeting - DetChar 11 Sample pulsar line coherences H Hz - Coherence with LVEA, BSC1 EM channels L Hz - Coherence with BSC1 accelerometers L Hz - Coherence with coil magnetometers

LIGO-G Z March 21, 2007 March 2007 LIGO/Virgo Meeting - DetChar 12 “Eternal” Spectral Line Mysteries 329 Hz Lines (all IFOs) »Strong enough that 2nd, 3rd harmonics seen »Speculation that they are Beam Splitter (BS) Violin Modes 335 Hz Lines (H1, etc.) »Rung up very strongly when beam power raised prior to science mode »Speculation that they are Recycling Mirror (RM) violin modes Hz Lines (all IFOs) »2nd, 3rd Harmonics often seen »Coherences in other interferometer channels (+/-15V power supply ripple?) 546,566 Hz Lines (H1 only) »Again, 2nd, 3rd harmonics often seen »Coherent with some WFS channels (+/-15V power supply ripple?) 2.60, 2.64 Hz combs (H2 only) »Extend from Hz »Seen in ETMX, ETMY shadow sensors

LIGO-G Z March 21, 2007 March 2007 LIGO/Virgo Meeting - DetChar 13 Possible Future Work Improve follow-up on commissioning investigations Continue Environmental Coherence Catalog Help Pulsar, Stochastic Groups prepare final lists Perhaps plan commissioning work to mitigate 546, 646Hz lines apparently due to +-15V power supplies Perhaps more commissioning investigations at Livingston Do we need more planning of our activities (or not?) Work on joint investigations with Virgo Suggestions from the floor…