Andon Japanese term for a signaling system announcing problems encountered and assistance requested, often implemented as sets of lights over workstations.

Slides:



Advertisements
Similar presentations
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Advertisements

Inventory Management 2.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
14–1. 14–2 Chapter Fourteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Chapter 24 stock handling and inventory control Section 24.1
5.6 Production Planning The last one!!. The cost of STOCKS Stocks are materials and goods required to allow the production and supply of products to the.
Supply Chain Management Managing the between all of the parties directly and indirectly involved in the procurement of a product or raw material.
Operations Management Just-in-Time Systems Supplement 12
Beni Asllani University of Tennessee at Chattanooga
Production Systems Chapter 9.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Lean operations and JIT
Lean Manufacturing and Just-In-Time Philosophy. Basic Idea Try to eliminate the system operational inefficiencies and the resulting waste by trying to.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Just-in-Time (JIT) Manufacturing Slide Set #14.
5.7 Production Planning Chapter 36.
© McGraw-Hill Companies, Inc., McGraw-Hill/Irwin.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Just-in-Time and Lean Systems
27 Lean Principles, Lean Accounting, and Activity Analysis
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 10/19/ Cost Management.
Chapter 29 Waste Elimination. Objectives Select and apply techniques for eliminating or preventing waste. Pull systems, Kanban, 5S, standard work, & poka.
11DSCI4743 Inputs and Outputs to APP Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives Units or dollars subcontracted,
6. The Management of Inventory. Inventory Inventory incurs costs, ties up working capital, consumes space and must be managed. Stocks can deteriorate.
Chapter 9 Inventory Kanbans Automating the Replenishment Cycle.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 Lean Operations.
Lean Production.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
9-1 Production Systems Chapter Chapter 9 Objectives After studying this chapter, you will be able to: Explain the systems perspective and identify.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
Production and Operations Management: Manufacturing and Services
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
Chapter 4 Inventory Management. INVENTORY MANAGEMENT Stockpile of the product, a firm is offering for sale and the components that make up the product.
Poka yoke Japanese term for process improvements striving to make the desired outcome of a process inevitable, largely by preventing mistakes. Click here.
Aggregation To combine the creation of many similar products into one relevant measure of activity for the organization. Click here for Hint heuristic.
Pipeline stock Inventory currently in transit between locations. Click here for Hint pipeline stock or dispatching or maritime shipping?
ABC policy Prioritizing the management of inventory according to the significance of each item’s annual dollar volume to the organization. Click here for.
Functional organizational structure An organization of specialists grouped into distinct departments. Click here for Hint actual authority or centralized.
Algorithm A procedure described by a series of steps. Click here for Hint project or algorithm or load distance?
Work-in-process (WIP) Inventory resulting from transformation of raw materials, but not yet ready for sale to consumers. Click here for Hint finished goods.
Bill of materials Click here for Hint inputs or bill of materials or processes? A description of all raw materials and intermediate assemblies required.
ABC policy Prioritizing the management of inventory according to the significance of each item’s annual dollar volume to the organization. cycle stock.
Nervous In management science, a condition in which a small change to input data can create major revisions to the conclusions suggested by a particular.
Aggregate Combining the creation of many similar products into one relevant measure of activity for the organization. Click here for Hint aggregate or.
bill of materials A description of all raw
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Chapter 27 Cost Management for Just-in-Time Environments
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
economies of scale Decreasing average unit cost by increasing volume.
Inputs and Outputs to Aggregate Production Planning
maritime shipping Transportation by sea or other waterway.
aggregation To combine the creation of many similar products
Lean Manufacturing and Just-In-Time Philosophy
andon Japanese term for a signaling system announcing problems
organizational structure
MODERN TRENDS IN PRODUCTION ENGINEERING
inventory or goods or stockpiling?
Just-In-Time and Lean Production
Operations Management
aggregate Combining the creation of many similar products
Chapter 12 Lean Production. Chapter 12 Lean Production.
green or sustainability or ethics?
Inputs and Outputs to APP
Presentation transcript:

andon Japanese term for a signaling system announcing problems encountered and assistance requested, often implemented as sets of lights over workstations. Click here for Hint kanban or andon or kaizen?

dual card kanban A kanban control arrangement consisting of two kanban loops. The first kanban loop signals and limits production of an item, while the second loop signals and limits withdrawals for consumption of the item. Click here for Hint kanban or dual card kanban or andon?

economies of scale Decreasing average unit cost by increasing volume. Click here for Hint economies of scale or muda or poka yoke?

electronic data interchange (EDI) The linking of two information systems from two different organizations to transfer data and conduct transactions. Click here for Hint VMI or JIT or EDI?

inventory Tangible items awaiting sale or use. Click here for Hint WIP or stockpiling or inventory?

JIT II A phrase first popularized by the Bose Company, emphasizing vendor- managed inventory and colocation of those vendors within a production facility. Click here for Hint JIT or JIT II or sole sourcing?

just-in-time (JIT) An earlier and alternate term for lean operation, in which a system implicitly operates with minimum of inventory and waste. Click here for Hint JIT or JIT II or lean?

kaizen Japanese term for continuous improvement. Click here for Hint kaizen or muda or kanban?

kanban In operations, a Japanese term for a signal, often a card. Kanban systems use these signals to regulate production. Click here for Hint kaizen or muda or kanban?

kanban loop The continuous path of travel of a set of kanbans, governing the production or consumption of some inventory item. Click here for Hint kaizen or kanban loop or kanban?

lead time Any delay between requesting a product and receiving it. Click here for Hint Little’s law or run time or lead time?

lean Operating without waste. Click here for Hint lean or andon or pull system?

level production strategy Aggregate planning approach that relies on fixed capacity despite changing demand. Click here for Hint MRP or level production strategy or push system?

Little’s law The average number of some item in a system equals its average arrival rate multiplied by the average time each unit spends in the system. Click here for Hint reorder point or lead time or Little’s law?

material requirements planning (MRP) A technique for scheduling the production of multiple items related by both independent and dependent demand. Click here for Hint MRP or level production strategy or EDI?

mixed-model assembly Production of a range of products with a single assembly line, primarily by varying features on an otherwise standardized product. Click here for Hint MRP or mixed-model assembly or kaizen?

muda Japanese term for waste, particularly anything a customer is not willing to pay for. Click here for Hint kaizen or muda or kanban?

partnering Long-term strategic alliances that benefit both parties. Click here for Hint partnering or EDI or RFID?

planned order releases A schedule of the ordering of a particular item to meet its requirements over a specific time interval. Click here for Hint planned order releases or MRP or muda?

poka yoke Japanese term for process improvements striving to make the desired outcome of a process inevitable, largely by preventing mistakes. Click here for Hint kaizen or muda or poka yoke?

pull system A production system that reacts to signals of demand, relying on internal coordination instead of the implementation of explicit plans to achieve outcomes. Click here for Hint push system or pull system or mixed-model assembly?

push system A production system that calculates and anticipates demand, relying on the implementation of explicit plans instead of internal coordination to achieve outcomes. Click here for Hint push system or pull system or mixed-model assembly?

quality circle A group of employees that meets regularly to discuss and develop opportunities for continuous improvement of their operation. Click here for Hint Little’s law or andon or quality circle?

radio frequency identification (RFID) The tagging of objects with devices that may be detected and interrogated for information by remote electronic readers, allowing identification and tracking without contact. Click here for Hint VMI or RFID or EDI?

reorder point An inventory level that triggers replenishment of an item. Click here for Hint vendor managed inventory or andon or reorder point?

run size A batch size, or order size, associated with the production of an item. Click here for Hint run size or run time or MRP?

run time The time required to produce a batch of some item. Click here for Hint run size or run time or MRP?

safety stock Inventory held to protect against uncertain supply or demand for the item. Click here for Hint lean or safety stock or pull system?

single card kanban A kanban control arrangement consisting of a single kanban loop, controlling production and limiting inventory levels of some item. Click here for Hint kanban or single card kanban or dual card kanban?

situational awareness An individual or organization’s comprehension of the surrounding environment and its potential near-future states. Click here for Hint situational awareness or andon or quality circle?

sole sourcing Relying on a single supplier. Click here for Hint partnering or sole sourcing or lean?

stockpiling Producing or securing goods in advance of demand, building up substantial inventory. Click here for Hint JIT or reorder point or stockpiling?

value-added The difference between the total value of the outputs and the total value of the inputs associated with an operation. Click here for Hint value-added or run time or Little’s law?

vendor-managed inventory (VMI) Transferal of ownership and management of inventory within a system to its external provider, who will be compensated after its use by the system. Click here for Hint JIT or VMI or partnering?

work in process (WIP) Inventory resulting from transformation of raw materials, but not yet ready for sale to consumers. Click here for Hint safety stock or run size or WIP?