O. Kester, 8 th MAC meeting, Darmstadt, 26.-27.11.2012 - 1 - Towards a resource loaded schedule Status of project planning and procurement O. Kester 8.

Slides:



Advertisements
Similar presentations
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Advertisements

Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
Peter Spiller, IHEP, Protvino GSI, Peter Spiller IHEP FAIR in kind Contributions.
Managing the Information Technology Resource Jerry N. Luftman
FAIR GmbH and FAIR Project History, Status and Outlook
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
Development plan and quality plan for your Project
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Role of Management and Technical Coordination
IT Project Management Cheng Li, Ph.D. August 2003.
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Effective Management and Compliance 1 ANA GRANTEE MEETING  FEBRUARY 5, 2015.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
From Research Prototype to Production
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
Introduction Riko Wichmann, XFEL Project Office (XPO) XFEL Technical Reviews.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Pre-Project Components
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Technology Department WP2 Progress Report Th. Otto
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Implementing Program Management Standards at Duke Energy.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
O. Kester, 11 th MAC meeting, Darmstadt, Status project planning and procurement O. Kester 11 th FAIR - Machine Advisory.
O. Kester, NuSTAR annual meeting, 27/02/2013
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Delivery of FAIR In-kind items (feedback from India) Subhasis Chattopadhyay VECC-Kolkata & BI-Kolkata.
PFM reform – change management Module 3.2 Preparing and managing a PFM reform programme 1.
O. Kester, 10 th MAC meeting, Darmstadt, Status O. Kester 10 th FAIR - Machine Advisory Committee Meeting.
Peter Spiller MAC meeting Time Schedule SIS100 1.
W. Barth, 8th FAIR Machine Advisory Committee, REPORTS BY NEW PROJECT DIVISION HEADS: “LINAC& Operations” organisation issues tasks and.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 GSI Helmholtzzentrum für Schwerionenforschung GmbH.
Peter Spiller, November 2012, Structure and Tasks of the Project Division Primary Beams Peter Spiller Machine Advisory Committee Meeting.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
O. Kester, 6 th MAC meeting, Darmstadt, 10/10/2011 FAIR ACC planning and schedule O. Kester 6th FAIR - Machine Advisory Committee Meeting
WP High Beta Cavities Delivery
Status of the FAIR Project
Status of HESR 18th March Gießen Dieter Prasuhn.
Testing of SC Magnets Status - November 2010
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
EDR HLRF Work Packages Draft Summary
(Procurement, testing of magnets)
REPORTS BY NEW PROJECT DIVISION HEADS: “Rare Isotope Beams”
Enterprise Content Management Owners Representative Contract Approval
Presentation transcript:

O. Kester, 8 th MAC meeting, Darmstadt, Towards a resource loaded schedule Status of project planning and procurement O. Kester 8 th FAIR - Machine Advisory Committee Meeting November 26 th, 2012 to November 27 th, 2012

O. Kester, 8 th MAC meeting, Darmstadt, Outline 1.Charge from the GSI supervisory board 2.New structures at GSI – GSI 3.FAIR Project planning - Master schedule - Budget requirements - Personnel 4.Resource and procurement planning 5.QM/QA 6.Integrated tool for planning 7.Outlook

O. Kester, 8 th MAC meeting, Darmstadt, Tasks given by the Supervisory Board (04/12)  Create a project structure according to the requirements of the FAIR project at GSI  Focus GSI man power to the FAIR project work  1. Priority  Project Management Structures (recruiting) (For the project and administration)  2. Priority  Accelerator and Common systems  3. Priority  Contributions to experiments  Consolidation of a master schedule  Requirements and resource planning (FTEs)  resource loaded schedule

O. Kester, 8 th MAC meeting, Darmstadt, Adjustment of GSI as host lab Constitution of a multi-project related organisational structure Establish the new department “Project Portfolio Controlling” Standardize coordination and steering processes Implementation of an integrated project-planning-tool Optimizing the administrative area and the according management systems to strengthen the support to the FAIR project

O. Kester, 8 th MAC meeting, Darmstadt, GSI Administration kaufmännische Geschäftsführung P. Hassenbach Bauplanung M. Stenersen Technische Infrastruktur G. Walter Gebäude und Anlagentechnik R. Becker Mechanische Werkstatt und Schlosserei M. Romig Zentrale Dienste B. Hachmeister Sicherheit N.N. Recht N.N. Personal W. Dahlem Patente und Technologie- transfer D. Rück Personal/Recht/ Patente A. Lambert Strat. Personal- entwicklung A. Lambert Administrative IT K. Miers Finanzen C. Berz (ab ) Finanzen/ Einkauf/Admin. IT F. Forster Einkauf und Material- wirtschaft M. Spatar Zentrale Mittelkoordination D. Müller (ab ) Controlling/ Organisation J. Henschel (ab ) Unternehmens- controlling H. Kühlen Projekt- Portfolio- Controlling M. Gemmer Organisation J. Henschel (ab ) Qualitäts- management N.N.

O. Kester, 8 th MAC meeting, Darmstadt, Objectives of To realize the sub project FAIR ACC successfully as the most important project of GSI Focusing of GSI to the needs of the project Clear structure, planning, processes, documentation, communication, resources and schedule To adhere to the commitments given to the BMBF  cost, scope and schedule delivers the GSI contribution to FAIR up to the start of beam commissioning!

O. Kester, 8 th MAC meeting, Darmstadt, Structure of GSI – project organisation Status 2012/11/09

O. Kester, 8 th MAC meeting, Darmstadt, Rare Isotope Beams Primary Beams Linac& Operations Stored Beams Accelerator Divisions

O. Kester, 8 th MAC meeting, Darmstadt, Project organization development  7 divisions, 35 departments and groups  re-directing of 113 employees from research divisions and 30 employees from TI to  alignment of inter divisional work – matrix management Harmonized master schedule Detailed resource planning Detailed structure and assignment of the work packages  Co-ordination/prioritization of procurements  in progress  Load planning data in the new planning tool  in progress Status

O. Kester, 8 th MAC meeting, Darmstadt, Technical Supervision – HOAI Contract  Technical support of FAIR accelerator in all project phases  Technical documents and specifications  System planning – interface support  Integration to complete system (Digital Mock Up – DMU ) ► Comprises basically the full configuration-management ► Technical realization for GSI in-kind contributions (for the Super-FRS e.g. Target area, Multiplets, …)

O. Kester, 8 th MAC meeting, Darmstadt, Information of FAIR S&B is required Master schedule (without experiments and HESR)

O. Kester, 8 th MAC meeting, Darmstadt, Framework time scheduling (without experiments and HESR) The master schedule is...  aligned for all FAIR accelerators  coupling of machine projects, consistent with the construction planning  the framework for the schedule details  the basis for the procurement planning and steering  the basis for the resource planning

O. Kester, 8 th MAC meeting, Darmstadt, Long-term analysis of the cash flow and the feed from the different funds Planning of investment budget Overview and analysis of variance Investment General overview of the cash flow Accelerator Systems Expected cash flow GSI funds (PoF) Accelerator (HGF) PMA Land (State) PMA Bund (Federal gov.)

O. Kester, 8 th MAC meeting, Darmstadt, Manpower requirements General profile (2012 status quo, as of 2013 assessment of personnel Personnel [FTE]

O. Kester, 8 th MAC meeting, Darmstadt, Zusätzlicher Personalbedarf 15 General profile (2012 status quo, as of 2013 assessment of personnel

O. Kester, 8 th MAC meeting, Darmstadt, Manpower requirements planning Example: Common Systems

O. Kester, 8 th MAC meeting, Darmstadt,  Personnel increase in  Common Systems, Engineering, Project Coordination  Primary Beams, due to SC magnets  Planning based on the framework time scheduling  Commissioning SIS100 in the year 2018  Priorities of all divisions have been included  Plans for recruitment and redirecting is work in progress Manpower requirements planning

O. Kester, 8 th MAC meeting, Darmstadt, Procurement items Specification documents Status of documents Assignment matrix Procurements – specification tracking matrix

O. Kester, 8 th MAC meeting, Darmstadt, Control of the work on technical document according to the procurement schedule Prioritisation of the procurement of the FAIR projectIdentification of the required specifications of each procurement itemTracking of the status of each document Steering of the work on the technical documents Tendering processes Priorities given by the project leader (done for procurement until July 2013) Next evaluation will extend the list of procurement until end of All specs for the procurement until July 2013 have been identified. Release process and status of specs is checked by the project coordination every week. The authors of the specs get a priority list according to the procurement schedule. Short term goal are defined and personnel is released from other duties, if the work on the documents is critical. Progress in establishing the documents is consistent with the contract milestones in the master schedule

O. Kester, 8 th MAC meeting, Darmstadt, In-Kind-contribution by GSI example SIS100 dipole modules GSI contribution:  system design (fixation of parameters)  technical specifications  tendering and contracting  technical follow up, quality assurance  FAT, SAT  documentation 109 units  contract given to BNG  FDR accepted

O. Kester, 8 th MAC meeting, Darmstadt, RF-resonators Specifications ready, tendering process in preparation Procurement via FAIR GmbH example SIS100 acceleration RF units GSI contribution:  system design (fixation of parameters)  technical specifications  technical follow up, quality assurance  FAT, SAT  follow up of documentation

O. Kester, 8 th MAC meeting, Darmstadt, Running tendering processesPSP-CodePublishedest. price SC strands SIS100 magnets k€ Current Leads SIS100 dipole testbench k€ Cryoplant SIS100 dipole testbench k€ Upgrade SIS18 dipole power supplies k€ Design SIS100 quadrupole module k€ Cryogenic plant HeSu + Compressor k€ Summe16880 k€ System or componentPSP-CodeSignedBudget [k€] CR Debuncher Cavity and amplifier SIS100 dipole modules Vacuum chambers SIS100 dipoles Nov GSI In-kind procurement – long lead items

O. Kester, 8 th MAC meeting, Darmstadt, Item or systemPSP-Code SIS100 Bunch Compressor System Building for SIS100 dipole cryo plant Superferric multiplets Super-FRS2.4.2.x Ionisation Profile Monitor SIS x Quench Detection System / x Adsorption pumps SIS x Cryo collimators SIS x Super-FRS magnet testing (CERN coll.)  Work load on planning of tendering processes and start of procurements for the GSI In-Kind contributions is increasing.  Good support from the GSI procurement department GSI in-kind procurement in preparation

O. Kester, 8 th MAC meeting, Darmstadt, ItemPartnerComment SIS100 ferrite cavitiesFAIR-procurementSpecifications released HEBT magnets and vacuum chambers (Batch 1) Efremov, Budker Specifications released, contract prepared, but QA and logistic are not clarified. SIS100 quadrupol modules + magnet testing JINR, Dubna Design of module, clarification of financial issues concerning the Dubna part. HEBT power suppliesBOSE/ECIL India Contract between BOSE/ECIL has been signed, no priority concerning the master schedule, but specs for prototypes required! Systems for beam diagnostics and controls Slowenia Planned release of specs: , signing contract: 12/2012 Contract preparation in progress Beam diagnostics SIS100FAIR-procurement Tests of SIS100 diagnostic systems  then completion of technical documents Proton-Linac klystrons and CH-cavities France In-kind contribution is not clear, bilateral agreement between GSI and CNRS+CEA pending.  High risk concerning schedule and QA  Intense in-kind coordination required GSI contribution to FAIR procurement and internatonal in-kind contributions

O. Kester, 8 th MAC meeting, Darmstadt,  Connection of the FAIR accelerator and their buildings to the SIS18  Upgrade of shielding for radiation protection in the building SIS18  Modification of the HKR (Main control room) Feasibility study - schedule - construction measures - construction costs (14,3 M€) - reconstruction HKR (1,6 M€) The reconstruction of the existing HKR is a risk for the project. Alternative solution: New control room in the FAIR building 17_1 Machbarkeitsstudie (Drees & Sommer, 06/2012) Link to existing facility

O. Kester, 8 th MAC meeting, Darmstadt, Implementation of QA: Functions and job description are discussed with the PL (November 15 th, 2012) Alignment of required QA processes Define the scope of reviews, audits and inspections (measures, functions, identification marks, etc.) Plan for each component  WPLs are included in the process (Q1/ 2013). First operative actions: CR- Debuncher: contracts are available  matching of the quality-related reviews Check and update the project cockpit  which specifications have to established and approved? Align the inspection scope of all components with the technical departments Align the QA with the vendor Status quality assurance –

O. Kester, 8 th MAC meeting, Darmstadt, Name of the work package Specification - dates Status quality assurance – Project cockpit Details of the WP

O. Kester, 8 th MAC meeting, Darmstadt,  First draft concept has been discussed and approved  Implementation of first phase ongoing  Release process has been defined Integrated tool for the planning process Budget according to the plan Milestone: payment

O. Kester, 8 th MAC meeting, Darmstadt, Planning tool - overview  Schedule, costs and resources combined in one tool (MS-Project-Server)  Objective: up-to-date and consistent data base for project coordination and control  Planning is done by the WPLs  permanent update and control of the WP  Coupling to SAP  automatic transfer of financial data to MS-Project (Obligo and Ist)  Release of new plans via project leaders (multistage release process)

O. Kester, 8 th MAC meeting, Darmstadt, Outlook – key points for the next half a year 1. Project structure established  detailed definition of task and detailed planning in retreats 2. Recruitment and build-up of the project coordination 3. Redirecting and recruitment  position description, web announcements 4. Establishing the communication processes (reporting) 5. Matching of the master schedule with civil construction planning 6. Implementation of the planning tool 7. Follow up of the specification process and procurement 8. Establishing of the configuration management and QM/QA 9. Planning on office and preparation and storage space

O. Kester, 8 th MAC meeting, Darmstadt, Additional slides

O. Kester, 8 th MAC meeting, Darmstadt, Personnel status of the Project Coordination Position descriptions in preparation Running recruitment

O. Kester, 8 th MAC meeting, Darmstadt, Tasks of division “Project Coordination” The division is responsible for -completeness, consistence, sufficient detailing, actuality, documentation and communication of the planning including follow up -definition, agreement, establishment and follow up of corresponding standards, processes and tools Project ControlConfiguration Management Processes & Communication Quality Assurance Milestones Cost control ressources Risk management procurement System design Technical design documentation data storage drawings contracts Internal interfaces Meeting structure reporting Interfaces to external partners Public relations Technical follow up Qualifications Acceptance tests Test procedures approvals => The division plans and steers all task of on a superior level