Bill Christie For the STAR Collaboration June 15, 2015 1.

Slides:



Advertisements
Similar presentations
1 Jim Thomas - LBL A Brief Introduction to the STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory June 4 th, 2009.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
STAR MRPC TOF: Project Overview BNL January 26, 2006 Geary Eppley Rice University.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
HFT Safety --PXL detector September 26, Dana Beavis.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
 To identify key words from last lesson on Cash flow  To construct a Cash flow forecast using given data (P3)  To analyse performance of Bright Sparks.
Disassemble, Assemble and Perform a Function Check on the M9
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
“Fix Tube Sheet” Heat Exchanger
1/30/ PHENIX WEEKLY PLANNING Jan. 30, 2014 Don Lynch.
U N C L A S S I F I E D Progress Report on the Dual-Use Cryostat John C. Ramsey Los Alamos National Laboratory.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
RPC production at GT (status and plans). Status After the IFR meeting in Rome a new version of the Production Plan have been proposed to GT Main requirements.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
Maintenance and Accelerator Support RHIC StartUp10.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Update on STAR AGS/RHIC Time Mtg February 18, 2014 Bill Christie Summary: We started looking for collisions Thursday morning (2/13/14). Determined the.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
4/17/ PHENIX WEEKLY PLANNING April 17, 2014 Don Lynch.
Commissioning Schedule and Shifts – First Call E906 Collaboration Meeting 23 February 2010.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
Electrics. Solar Energy Solar water heater Efficient way to heat water at no cost all year long. Work by running copper pipes through a solar panel on.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
Collaboration Mtg April 14, 2000 DO Timeline J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2.
G2P Installation Readiness. Fast raster & Calorimeter.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
Performed at Brookhaven National Lab for Fermilab Main Injector Electron Cloud Studies June 2009 Linda Valerio September 11, 2009.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Сегодня мы с вами на уроке: Познакомимся с названиями месяцев; Познакомимся с названиями месяцев; Вспомним слова, которые нам помогут при обсуждении темы.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
Operations meeting on FY07 Shutdown Date: June 27, W.B. Christie Outline Brief Overview of Shutdown Plan Details/discussion of next few weeks Comments.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
2007 Physics Run Status STAR Collaboration mtg June 12, 2007, Berkeley California Bill Christie Outline Overview of BUR/Goals for Fy07 Run Collider Performance.
CBETA Technical Review
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
MANUFACTURING PROCESS OF TRANSFORMERS
The Sky and the Earth Class 1 EVS.
Run16 Y. Akiba.
Floating Head Heat Exchanger
Cooler e-source Magnetized Beam LDRD Progress Report
One Coil Gun Magnet February 2, 2016.
Cooler e-source Magnetized Beam LDRD Progress Report
Presentation transcript:

Bill Christie For the STAR Collaboration June 15,

2 Beam Ops. Cease ~ 8 am TPC/HFT Cosmics Remove W. BBC Drain and Blow out Magnet Coils Magnet Off Gas Purge Remove West Poletip & install Scaffolding Remove E. BBC

3 Set up for PXL removal Remove N & S PXL assemblies & PXL platform Remove East Poletip and Install scaffolding Miscellaneous maintenance efforts expected to occur throughout July Remove failed BSMD Fee cards

4 Miscellaneous maintenance efforts expected to occur throughout August RHIC Summer Sunday Open House

5 Miscellaneous maintenance efforts expected to occur throughout September BEMC Maintenance work Both ends of STAR

6 Miscellaneous maintenance efforts expected to occur throughout August BEMC Maintenance work Both ends of STAR

7 Dress W. TPC face & Remove W. scaffolding SGIS recertification and Fire alarm recertification Dress E. TPC face & Remove E. scaffolding Insert, attach, & hookup E. Poletip Install PXL platform Install & hook up N & S PXL assemblies

8 Fill and start Magnet H 2 O system Insert, attach, & Hookup West Poletip EEMC maintenance

Magnet checkout & Heat run, TPC HV check Install & light check BBCs STAR ready for Cosmic Ray testing