Second Street Closure for Construction of B21 1/16/16 – 1/31/16.

Slides:



Advertisements
Similar presentations
Doewood Drive Gate Closure: Right-of-way Vacation & Proposed Improvements El Paso County Public Services Department Tuesday, February 14, 2012 André P.
Advertisements

Operated by Los Alamos National Security, LLC for DOE/NNSA U N C L A S S I F I E D Winter is Approaching! Prevent Slips, Trips, Falls and Understand Lab.
Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
Capital Beltway HOT Lanes Project Project Update March 2009.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Maintaining Business Continuity After Internal and External Incidents Greg Schaffer, CISSP Director of Network Services Middle Tennessee State University.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
LANE CLOSURE CHARTS CHART DEVELOPMENT AND DELAY DAMAGES (District 3) OBJECTIVE To become familiar with the lane closure chart development process.
Administration & Finance November 18, 2014 Utility Corridor and Roadway Relocation Project Update (UCRR)
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 1 Traveler Information on 2010 Construction Route 7 over I-87 (Exit 6) Bridge Replacement Town of Colonie.
MODULE 6 Objectives: Students will learn about using risk reducing strategies to manage multiple-lane roads at speeds up to 65 mph in complex risk environments.
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
SB 490 Amendments to the Kansas Underground Utility Damage Prevention Act Effective January 1, 2003.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Journey Management Toolbox Talk 2015
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Route 109 Bridge Reconstruction at Wood Road The Missouri Department of Transportation.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
Northwest ISD Samuel Beck Elementary School Addition and Renovations, 2012.
Pasadena Water and Power Department INCREASE CONTRACT 20,013 WITH VCI TELCOM FOR CONSTRUCTION OF UNDERGROUND SYSTEM IN LOS ROBLES BY $300,000 August 9,
Welcome to. 2 Information Rich Event On around 1330 hours, facility workers smelled smoke Stopped work and called the Emergency Service Dispatch.
Presented by: Kristi Shinall, Parsons; Jennifer Hall, P.E., Parsons;
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.
Westmeath County Water Conservation Project Stage 3 Watermains Rehabilitation Works Athlone Town February 2013.
Florida Gas Transmission Mainline Hydrostatic Test From the Golden Glades Interchange to the interchange of NW 122 nd Street with the Palmetto Expressway.
HOUSTON, TEXAS1 Pipeline Repair ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Residential Fire #AB $AB W Horizon Drive 04:48:43 (FS Initial Dispatch)
1 BROOKHAVEN SCIENCE ASSOCIATES CHILLED WATER & COMPR. AIR PIPING Thomas F. Joos, P.E. Lead Civil/Structural Engineer CFAC Review November 9-10, 2009.
Former DuPont Barksdale Works Project Update October 5, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Decide and Execute Jones College Prep Driver Education.
How would a truck get through? Any suggestions?. No parking allows access.
Solutions for site Acquisition. As the number of sites grows, site acquisition becomes a greater issue. What can we do to face the following issues: 1-
Construction Notes Amer Bata, Area Construction Manager.
Plan for the Best, Prepare for the Worst Thank you for attending.
Working with your Police Department and other Municipal Services Chief Scott Heher The Itasca Police Department February 7, 2014.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
Building Access/egress Weather Emergency Planning 1.
2007 Incident Management Summit Sri Balasubramanian Chief, Office of Emergency Management Division of Maintenance California Department Of Transportation.
KEY LEARNING from an Electrical Discharge [Dangerous Occurrence] that occurred on Thurs 03 October 2013.
Upper Middle Road Grade Separation Construction Project Status Update February 2009.
Central Houston, Inc. Houston Downtown Management District 909 Fanin, Suite 1650 Houston, Texas / Operations
Central Houston, Inc. Houston Downtown Management District 909 Fannin, Suite 1650 Houston, Texas / Operations
Contractor Utility Coordination WisDOT Projects February 18 th, 2016.
Planning the Project Unit 1 – Lesson 12.
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
IA 122 RECONSTRUCTION PRE-BID MEETING
LSST PROJECT PHASE #2 BASE FACILITY AND DATA CENTER CONSTRUCTION
Malibu Canyon Pole Replacement Project Information
Construction Safety Council Breaking New Ground February 7, 2001
Engineered Scoring System for Bicycle Lane Mapping Development Pedro Zavagna, Mena Souliman  The University of Texas at Tyler, Departments of Civil Engineering.
PROJ. 566(17) LOR PID MAJOR WIDENING
Lincoln Common Redevelopment Construction Update.
ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019
Construction Considerations
Harbour Island Force Main Replacement
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
What Can Underground Utility Contractors in Ooltewah TN Do for You?
10 DAY PUBLIC NOTICE: Water Main
Presentation transcript:

Second Street Closure for Construction of B21 1/16/16 – 1/31/16

Excavate two trenches across Second Street to route multiple utilities to future Building 21 Electrical feeders IT and fire alarm communications fiber Chilled water piping Fire water piping Purpose for Road Closure

Site Plan with Building Overlay 3

Why is an open trench required? The majority of the utilities can be bored underneath Second Street with the exception of the chilled water piping. The chilled water piping is pre-insulated from the factory for direct bury and pulling through a bore would damage the pre- installed PVC sleeve and insulation which could result in corrosion of the pipe and pre-mature failure of the piping underneath Second Street. Since a road closure could not be avoided it was decided to provide a separate trench for the other utilities and work concurrently. This also allows the contractor to hydro- excavate to reduce risk of hitting existing utilities

Why wasn’t this done during the Holidays? The original plan was to perform the road closure over the holidays but despite our best efforts the pre-insulated piping was unable to be procured to arrive in time for a holiday road closure In addition, the section of chilled water pipe spanning Second Street will need to be fully welded and tested prior to the road closure to minimize the time period

Timeline for Closure The current timeline is as follows: 1/16/16 (Sat night) – Install traffic control barricades 1/17/16 through 1/31/16 – Perform work NLT 1/31/16 (night) – Remove traffic control barricades and reopen Second street (schedule contains some contingency for bad weather)

Timeline for Closure (cont.)

Detour Around Road Closure

Communications Planning meetings with EOC, Security and PAO This meeting with FM’s in surrounding buildings Numerous JSC Today article’s LED signs at gate entrances with closure notification Information posted on JSCSOS.com with updates as the work progresses Coordination with Space Center Houston for tram tours LED marquees will be posted North and South of the closure to inform driver’s of closure ahead to encourage drivers to take an alternate path (see traffic plan)

Suggestions to Improve Traffic Flow Folks should avoid the road closure area if possible to reduce traffic flow through the detour Utilize Gates 3 and 4 if you are trying to go North of the road closure to buildings such as Building 20 Expect delays so plan accordingly