Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.

Slides:



Advertisements
Similar presentations
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Advertisements

Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Objectives Terminal Objective
TM/WSP 5-9 Nov Group D1- Nuclear fuel cycle, nuclear waste QUESTIONS / DIFFICULTIES  Why is the NPP decommissioning required / necessarily?  How.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Training for Participants Date, Location, Venue 1 Welcome! Welcome to PEM 2 Module!
Writing a Preliminary Assessment (The example of the Environmental Review Report) [DATE][SPEAKERS NAMES]
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
1 EFCA - 21th March 2002 Raul Mateus Paula. 2 This presentation underlines: The key objectives of the Relex Reform The division of the responsibilities.
Pravin Amar Development Planners 14 July 2005, Assagay Hotel, 5pm Applicant: EnviroServ Waste Management (Pty) Ltd. Environmental Consultants Pravin Amar.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
ENVIRONMENTAL MANAGEMENT PLAN
Justification of Incukalns Rehabilitation Project Modification
Audit of Public Procurement
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points in Asia May 2008, Manila.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
Environmental auditing
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Presentation For the Moldova Safeguards Training Workshop October 28-31, 2008 By Victor B. Loksha Consultant Europe and Central Asia Region The World Bank.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
Public participation of EIA in R.O.C. Hsiao-Tien Wu, Wei-Chein Sun & Tung-Wang Chang Environmental Protection Administration Executive Yuan R.O.C.
Implementing the Regulatory Flexibility Act. 2 Background The Regulatory Flexibility Act (5 U.S.C. 601–612) requires Federal agencies to— –Consider the.
Environmental Management System Definitions
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Session 3 CPDP Formulation Process Project for Capacity Development for Implementing the Organic Law at the Capital and Provincial Level (PILAC 2)
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Applicant: eThekwini Transport Authority Environmental Consultants Engineers Pravin Amar Development Planners Iliso Consulting.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
1 | 2010 Lecture 3: Project processes. Covered in this lecture Project processes Project Planning (PP) Project Assessment & Control (PAC) Risk Management.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
SEA in the Czech Republic Prague, 24 September 2008.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Expert Group Meeting on the Revision of the Handbook on the Management of Population and Housing Censuses New York, 14 – 17 December 2015 Overview of the.
Managing the Environmental & Project Development Process Presented by the Ohio Department of Transportation NEPA&CEQ.
Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
National Environmental Assessment Requirements and Relation to World Bank Policies Relevance to Central Asia Gulana Hajiyeva WB Safeguards Training Workshop.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
1 Federal Acquisition Regulation Environmental Coverage Richard Langston Energy Representative Civilian Agency Acquisition Council.
ISO Session 3 Environmental Management and Ethics in Management.
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
Strategic Environmental Assessment for the Operative Programmes Anita Gulam Ana Kovačević Ministry of Environmental and Nature Protection, Republic of.
Principal Investigator ESTCP Selection Meeting
Municipal Class Environmental Assessment
GEOECOLOGICAL PROJECT
“The people’s forests” Public Participation in National Forest Planning Susan Jane Brown, Staff Attorney Western Environmental Law Center The National.
EIA approval process, Management plan and Monitoring
THE SUPERFUND PROCESS Assessment and Listing
Principal Investigator ESTCP Selection Meeting
Lecture 15 Environmental auditing
Communication and Consultation with Interested Parties by the RB
National Environmental Policy Act (NEPA)
Relationship between World Bank and Romanian EA requirements
Unit 4 Fisheries Planning
Principal Investigator ESTCP Selection Meeting
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

lecturer: Lina Vladimirovna Zhornyak, Associate Professor

National policy in EIA is defined in the following laws: Federal Law № 7 Environmental Protection (2002); Federal Law № 174 Ecological Expertise (1995); Terms and Conditions of Environmental Impact Assessment of Planned Economic Activities in RF (2000); Instructions in Ecological Feasibility of Economic Activities (1994).

There are several stages in the EIA procedure (Table 1): 1) development of technical specifications (TS) for EIA; 2) environmental impact investigation of economic activities to determine ecological, social and economic consequences and further forecasting, which, in its turn, is defined in the following document “ Preliminary information results of impact assessment”; 3) designing over-all project version of “Information results of impact assessment”.

Pre-investment stage Feasibility study Analysis of economic feasibility Land allocation certificate. Coordination with local administration. Investment intentions. Specification requirements Declaration of Intent (DOI) – request Investment stage Preliminary engineering Preliminary project design Feasibility study – pre-project development Basic engineering Basic project designDevelopment project Detailed Engineering Detailed project designEngineering documentation Feasibility report Engineering-economic reportBusiness plan. Economic feasibility

The following participants are involved in the EIA procedure, each of which has one or another specific function: 1)client - investor; 2)executive in impact assessment; 3)public representatives. Client-investor – a person or entity responsible for document preparation of one or another economic activity with corresponding stated regulations and presenting all documents of stated economic activity for ecological expertise.

The client compiles and submits all information results of impact assessment to General Designer, involving the following documents: 1)decision of head of local administration in land acquisition, including siting act; 2)public consultation protocol; 3)work contract with enclosures: technical specifications; project finance plan; time-line of activities; input (data) list.

Input (data) list issued by Client includes: 1)data of burrow pit; 2)enterprise mechanisms and transport means; 3)field studies data of basin water and air quality for the last 2- 3 years; 4)results of water chemical analyses; 5)background concentration of contaminated substances in water and air according to Hydrometrology and Environmental Monitoring Agency data; 6)data about fauna and flora, including some protected species (Red Data Book); 7)verification letter of hunting administration about animal and bird existence; 8)verification letter of fishery about fish per unit area in a water; 9)verification letter of waste limit in disposal sites, etc.

Executive in impact assessment – a person or entity responsible for procedures of environmental impact assessment in compliance to client’s requirements. Executive is responsible for a full and accurate assessment, in accordance to the ecological regulations and standards. This person plans research, produces TS for EIA and develops ecological monitoring and control programs.

Start-up period (stage) – environmental impact assessment of projected activities are: notice of intention, drafting TS for EIA. The first stage (start-up period) involving project pre-investment phase “ life cycle” embraces the solution of the principle question – possibility \ no possibility of future activity.

During TS for EIA procedure the impact assessment is investigated including alternative project, activity tasks and their performance, etc. resulting in preliminary information results of impact assessment which, in its turn, is presented to the public. After the analysis of public comments and results of public consultations the final version of the IEA document is published. This document is furthered to the state ecological expertise as preliminary design and project documentation. Besides this, a public ecological expertise is executed.

Public representatives can be involved within the framework of this procedure during preliminary design and during the EIA procedure itself, as well as, during public comments and public consultations. Participation of public representatives in EIA procedure is organized by the local government administration and maintained by the client.

6)comparison of expected ecological and associated social-economic consequences and their alternatives, including refusal of this \ that activity, its feasibility and further implementation; 7)development of proposals in ecological monitoring programs and further control throughout all implementation stages of planned economic activity; 8)introduction of recommendations in post- project implementation analysis of this \ that economic activity.

1)information involving the characteristic features and dimension of environmental impact on planned economic activity, implementation alternatives, evaluation of ecological risks and their social-economic consequences and possible minimization; 2)identification and registration of public preference relevant to the client’s decision concerning planned activity; 3)client’s decision in determining alternatives of planned activity (including location of facility, selection of technology, etc.) or refusal in accordance to the results of EIA.