TRD Gas System Layouts Production Readiness Review 03 – Nov - 2003 F. Hahn.

Slides:



Advertisements
Similar presentations
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
Advertisements

Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
Scenario for the gas system 1.High cost gas (5 €/l of Xe) 2.High hydrostatic pressure over 7 m height 3.Light and large detectors, no big under- or.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
A. Wasem / TA1-GSTRT Meeting 20/02/20021 Results from Prototype CO 2 Cooling Gas System.
02/07/2014R. Guida CERN/PH-DT-DI1 RPC R&D Collaboration PH-DT Topics of Interest Studies of gas systems performance and development of dedicated gas modules.
1 isr Institute for Sustainable Resources CRICOS No J Automated Greenhouse Gas Measurement System.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
Analysis Modules F. Hahn. Goal of todays Meeting Inform about current status and layouts of the analysis modules. (the focus will be on common modules)
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
04/02/ FH Plans for 2005 PH-DT1-GS. 04/02/ FH Physicists: Stefan Haider, Serguei Morozov (PJAS), Ferdi Hahn, Mar Capeans Technicians: Andrea.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
CLEX TBM T0 Cooling system Progress Report 1 V. Soldatov, A. Vamvakas, BE-RF
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
19/02/2014A. D'Auria CERN/PH-DT-DI Maintenance ID flushing system:  Maintenance 2 dryers  Installation 2 flow meters  Maintenance of several hygrometers.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Cooling System Solutions
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Detector Gas Systems Status Update Ferdi Hahn PH-TA1-GS Detector Steering Meeting November 2004.
60kW Thermosiphon control system
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
NA62 RICH Gas System V2.0 S. Haider PH/DT/DI LHC-Gas-Project.
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Active gas system status & plans. S.Konovalov, K.Zhukov, K.Vorobev.
Installation of the T600 at Fermilab CSN2, September 22,
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
Alice TOF Production Readiness Review Gas Control Systems.
Detector Gas Systems Status Update Ferdi Hahn PH-DT1-GS 3 rd Detector Steering Meeting on Gas Systems June 2005.
Demineralised water cooling system
BSB Biomanufacturing CHAPTER 2 Process Plant Design – Part III
Installation of the T600 at Fermilab
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
IT-4189 Supply and installation of a cryogenic distribution system
Gas system Commissioning procedures and status
Proximity Cryogenics P&IDs meeting
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Gas System Commissioning
Tracker cooling loop “check out” draft for discussion
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
352MHz Klystron Control for the 3MeV Linac test stand
Piping and Instrumentation for Process Industries
Presentation transcript:

TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn

Content TRD Gas System: parameters and module layouts. TRD Distribution and Pressure Regulation Special Technology: channel flow meter Materials List Components: selection, cleaning, procurement. Deliverables from TA1 Cost and Schedule

Overview (Layout not TRD specific)

TRD Gas System Main Parameters (very expensive gas mixture) Gas mixture: Xe / CO 2 85% / 15% Total volume: 28 m 3 No. of Detector Modules 5 x 6 x 18 = 540 No. of Gas Channels Input: 3 x 18 = 54 Output: 14 No. of height Zones: 14 Hydrostatic Diff. (per height zone) 0.4 mbar Total Hydrostatic Diff. 2.6 mbar Total nom. circulation flow: 2.5 m 3 /h Max. circulation flow: 5 m 3 /h Nominal Gas Channel Flow: Input: 47 l/h Output: l/h Nominal replenishing flow: l/h Chamber pressure mbar Max. overpressure on the Module: 3 mbar (Impurity Limits: O2, N2 t.b.s.)

TRD Gas Circulation Loop (ALEPH cryogenic separator)

Mixer Module 2 Primary gases Mixture : Xe / CO 2 85% / 15% Fill and Run MFC for each gas

Purifier Module Twin column Purifier Module with inline regeneration.

Membrane Separator (Overview) (optional) Note: the module may have two or three membranes

Membrane Separator (Sub-Modules

Pump Module

Exhaust Module

On-Detector Equipment: Three modules together

TRD Distribution On the Plug

Distribution Sub-Unit Pressure controller Flow Cells measuring input flows Shut-Off Valves for Sub-unit Flow adjustment pre-defined by capillaries

PT100 Channel Flow Meter Flow Cell incorporated in input and output gas manifolds. Measurement Principle: 1)Measure ambient temperature. 2)Switch on heating current 3)Wait until T has risen by  T=20 o C. 4)Take last 50 points and fit slope. 5)Wait until cool down to ambient T. (~40 sec.) Measurement cycle ~ 30 sec/channel Proposed by M. Bosteels Developed by: S. Haider, C. Zinoni + S. Morozov

Pipe Summary Preliminary: existing partially new Options: a)Capillary input lines start on the Plug -> Ø=4/6mm (requires new tubes) b)Plug -> UX is done with existing tubes. Capillaries start in UX (diameters much smaller). or bigger Pipe sizes and length must be checked and validated by TRD and TC.

Material List To be checked by TRD Group

Cleaning, Component Selection + Procurement Many tests done for component purity. Arrangements with suppliers for grease free components are put in place. Extra cleaning for some components is done at CERN. (depends on requirements, serious congestion in cleaning CERN service) Numerous compatibility tests for radiation and B-field compatibility. All electrical and electronic components are tested. Simplified purchasing procedures arranged by SPL with many suppliers.

Work share for TRD Gas System TA1 will cover the selection and procurement of components, construction and installation of the gas racks. Special items (cryogenic plant, on-detector equipment) and the commissioning will entail several phases, and needs participation from the TRD group. Deliverables from TA1: –Standard gas system modules: Mixer, Purifier, Membrane module, Circ. Rack, Pump, 2 Distribution racks and some (minimal) Analysis. –Control system for all modules, PLC’s, etc. (not the PC’s for the control room). –Documentation: schematics, technical descriptions, user instruction manuals, To be covered by ALICE TC or TRD Group: –Modifications to existing fixed piping network : SG to Plug and Plug to UX. –On-Chamber equipment (pressure measurement, protection + back-up) –Procurement and testing of membranes. –New gas piping for connections from Distribution Racks to Chambers. –Cabling between Zones: SG to Plug, Plug to UX, and any cables to the chambers.

Cost Estimate: Includes 10% contingency

Gas Construction Plan (as known today) TRD