BET2413 Project Scheduling Lecture 6: Relationships in Project Network.

Slides:



Advertisements
Similar presentations
Projmgmt-1/12 Depaul University Scheduling Tasks In MicroSoft Project Instructor: David A. Lash.
Advertisements

Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 6: Developing a Project Plan
Project Management 6e..
Developing the Project Plan
TIME MANAGEMENT 641 Topic 03 Activity Sequencing.
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
Project Management Project Management
Scheduling CTC-470.
Having Fun with Gantt PERT &.
Chapter 10: Project Schedule Planning
إدارة المشروعات Projects Management
Management & Development of Complex Projects Course Code - 706
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.
Dr. Neal CIS 480 MS Project Concepts Dr. Greg Neal CIS 480 Systems Analysis and Design.
Dr. Hany Abd Elshakour 5/4/2015 3:55 PM 1. Dr. Hany Abd Elshakour 5/4/2015 3:55 PM 2 Time Planning and Control Activity on Node Network and Precedence.
BSBPMG503A Manage Project Time 6.2 Sequence Activities Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of.
AMERICAN SPORTS BUILDERS ASSOCIATION CRITICAL PATH METHOD SCHEDULING FOR SUCCESS December 6-8, 2008 New Orleans, Louisiana Presented By: Bill Pronevitch.
Information Technology Project Management
Project Time Management
Cost Data (Cont) Session 13. Agenda  Continuation from sessions on cost data.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Fine-Tuning Tasks Lesson 11. Skills Matrix SkillsMatrix Skill Manage task constraints and dependencies Explore the effects of constraints and dependencies.
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
7-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 7 Project Time Management.
Time Planning and Con trol Precedence Diagram.  Precedence Diagramming  An important extension to the original activity-on-node concept appeared around.
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Abeer Bin Humaid. Project management is “the application of knowledge, skills, tools, and techniques to project activities in order to meet project requirements”
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
Information Technology Project Management By Denny Ganjar Purnama, MTI Universitas Pembangunan Jaya April 2014.
Mark Kelly McKinnon Secondary College Gantt PERT Having Fun with &
1-1 Information Technology Project Management by Jack T. Marchewka Power Point Slides by Richard Erickson, Northern Illinois University Copyright 2003.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
EGNR 300 Project Management Planning & Scheduling ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport,
MS project Abeer Bin Humaid. What is project management? Project management is “the application of knowledge, skills, tools, and techniques to project.
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Developing a Project Plan Chapter 6.
PMP, CAPM, PgMP, PMI-SP, PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services.
Advanced Project Management Project Time Management Ghazala Amin.
Scheduling CTC-415. Short Interval Scheduling Plan & manage day to day activities Focus on individual activities Goal Oriented to get activity done Two.
Microsoft ® Office Project 2007 Training Linking Project tasks [Your company name] presents:
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 1 C ertificate IV in Project Management
Project Management Part 5 Project Scheduling. Topic Outline: Project Scheduling Identifying relationships among activities Project network diagrams Identifying.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Project Management Project Planning. PLANNING IN PROJECT ENVIRONMENT Establishing a predetermined course of action within a forecasted environment WHY.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Chapter 12 Network Scheduling Techniques. Scheduling Techniques Gantt or bar charts Gantt or bar charts Milestone charts Milestone charts Line Balancing.
Mark Kelly Vceit.com Gantt Having Fun with. 2 Well, “fun” might be optimistic At least they’re more fun than this…
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
CON 2001 Construction Methods Tool #1 - Construction Scheduling Presented by Elia Twigg, P.E. (Prof. Ralph V. Locurcio, P.E.)
NETWORK BASED PLANNING METHODS. Planning, What is it? A common mistake: Not involving in the planning process the people who must do the work.
Parallon Business Solutions Microsoft Project Server 2010 Project Server 2010 Concepts of Working with Tasks.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
Unit 2 Time Management Prepared by: Prof. Seemaah Keddar.
BV41840 Schedule Risk Analysis of Software Development By: Dr. Joe H. Dean Engineering Chief Risk & System Analysis LFWC And: Mr. David W. Benson, Jr.
Project Management Fundamentals - Planning Tools 1.
PROJECT MANAGEMENT week 7
6.3 Sequence Activities The process of identifying and documenting relationships between the project activities. Every activity, except the first and last,
Project Management module
Project Management -- Developing the Project Plan
Developing a Project Plan
Time Planning and Control Precedence Diagram
Project Scheduling Basics Activity on Node Precedence Diagrams
Basic Project Scheduling Line of Balance
LECTURE 2.
Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
Time Planning and Control Precedence Diagram
Presentation transcript:

BET2413 Project Scheduling Lecture 6: Relationships in Project Network

Learning Outcomes LO1: Identify relationships in project network LO2: Differentiate different types of relationships in project network

Recap Leads and Lags are types of float In project management, there are four types of dependencies: –Finish to Start (FS) - Later task does not start until the previous task is finished –Finish to Finish (FF) - Later task does not finish until the previous task is finished –Start to Start (SS) - Later task does not start until the previous task starts –Start to Finish (SF) - Later task does not finish before previous task starts

Introduction The concept of Lead Time and Lag Time is very important in project scheduling network diagram. As a Project Manager, you must know about the Lead Time and Lag time in order to better understand your project plan and execute it accordingly.

Leads and Lags Usually, when the first activity finishes, a second activity starts. This type of activity sequence is called Finish to Start and it happens the majority of the time. However, there are many instances when other situations arise; e.g. a second activity starts while first activity is about to finish, or a second activity will start a few days after finishing the first activity. These two situations are termed as Lead and Lag.

Lead Time When the first activity is still running and second activity starts, this is called Lead, and the balance of time for the first activity is known as Lead Time. Lead Time is the overlap between the first and second activity.

Lead Time Example For example, let say that time duration for the first activity is 20 days, and for the second activity it is 15 days. As the first activity completes its first 15 days, you start working on the second activity. (Please note that the first activity still has 5 days to finish itself completely.)

Lead Time Example (Cont’d) In this case we’d say that Lead Time is 5 days, or Finish to Start activity has 5 days Lead Time

Lead Time – Real World Example You’re constructing a two-floor building, and now you have two activities in sequence; i.e. electrical work and painting. However, as you complete the electrical work of ground floor, you start painting it, and electrical work for first floor continues.

Lag Time When first activity completes, if there is then a delay or wait period before the second activity starts, this is called lag and the delay is known as the Lag Time Lag Time is the delay between the first and second activity.

Lag Time Example For example, the time duration for the first activity is 3 days, and for the second activity it is 2 days. After completing the first activity you wait for one day, and then you start second activity. (Please note that, here you start second activity after one day of completing the first activity.)

Lag Time Example (Cont’d) In this case we say that Lag Time is one day, or Finish to Start activity with one day delay or lag.

Lag Time – Real World Example Suppose you have to paint a newly constructed room. So the first activity would be applying the primer coating and then you will go for the final painting. However, after applying the primer coating, you must give it some time to dry properly. Once the primer coating dries, you can start final painting. The time given for coating to dry itself is called the lag time.

More Example Take the scenario of building two identical walls of the same house using the same material. Let's say, building the first wall is task A and building the second one is task B. The engineer wants to delay task B for two days. This is due to the fact that the material used for both A and B are a new type, so the engineer wants to learn from A and then apply if there is anything to B. Therefore, the two tasks A and B have a SS relationship.

Example (cont’d) The time between the start dates of the two tasks can be defined as a lag (2 days in this case).

Extended Network Techniques Lags –The minimum amount of time a dependent activity must be delayed to begin or end. Lengthy activities are broken down to reduce the delay in the start of successor activities. Lags can be used to constrain finish-to-start, start- to-start, finish-to-finish, start-to-finish, or combination relationships.

Finish-to-Start Relationship Start-to-Start Relationship Use of Lags

Use of Lags to Reduce Detail

Finish-to-Finish Relationship Start-to-Finish Relationship Combination Relationship

Extended Network Techniques Laddering –Activities are broken into segments so the following activity can begin sooner and not delay the work.

Example of Laddering Using Finish-to-Start Relationship