MG 11 - Berlin Virgo status Marie-Anne Bizouard (LAL-Orsay) on behalf of the Virgo Collaboration.

Slides:



Advertisements
Similar presentations
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Advertisements

For the Collaboration GWDAW 2005 Status of inspiral search in C6 and C7 Virgo data Frédérique MARION.
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Laser Interferometer Gravitational-wave Detectors: Advancing toward a Global Network Stan Whitcomb LIGO/Caltech ICGC, Goa, 18 December 2011 LIGO-G v1.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
1 Science Opportunities for Australia Advanced LIGO Barry Barish Director, LIGO Canberra, Australia 16-Sept-03 LIGO-G M.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
Virgo Control Noise Reduction
Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.
Interferometric detector for GW: status and perspectives Giovanni Losurdo INFN Firenze-Urbino
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
1/25 Current results and future scenarios for gravitational wave’s stochastic background G. Cella – INFN sez. Pisa.
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
Interferometer Control Matt Evans …talk mostly taken from…
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
Status of LIGO Data Analysis Gabriela González Department of Physics and Astronomy Louisiana State University for the LIGO Scientific Collaboration Dec.
LIGO-G D Enhanced LIGO Kate Dooley University of Florida On behalf of the LIGO Scientific Collaboration SESAPS Nov. 1, 2008.
07. July 2004 Andreas Freise Status of VIRGO A. Freise For the Virgo Collaboration European Gravitational Observatory.
LIGO- G D Status of LIGO Stan Whitcomb ACIGA Workshop 21 April 2004.
Status of VIRGO Francesco Fidecaro (after Lisa Barsotti) - University and INFN Pisa – on behalf of the VIRGO collaboration Aspen - January 19 th, 2005.
Koji Arai – LIGO Laboratory / Caltech LIGO-G v1.
Novemebr 5, 2006LSC meeting1 Virgo Update Prospects on detector performance and running schedules B. Mours.
Status of Virgo A. Viceré INFN-Firenze – Università di Urbino.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
GWDAW11, Postdam 18th-21th December 2006 E. Cuoco, on behalf of Virgo collaboration 1 “Data quality studies for burst analysis of Virgo data acquired during.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Status of coalescing binaries search activities in Virgo GWDAW 11 Status of coalescing binaries search activities in Virgo GWDAW Dec 2006 Leone.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
VIRGO LAPP – Annecy NIKHEF – Amsterdam INFN – Firenze-Urbino INFN – Frascati IPN – Lyon INFN – Napoli OCA – Nice LAL – Orsay ESPCI – Paris INFN – Perugia.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
International Gravitational Wave Network 11/9/2008 Building an Stefan Ballmer, for the LIGO / VIRGO Scientific Collaboration LIGO G
Initial and Advanced LIGO Status Gregory Harry LIGO/MIT March 24, 2006 March 24, th Eastern Gravity Meeting G R.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
Stochastic Background Data Analysis Giancarlo Cella I.N.F.N. Pisa first ENTApP - GWA joint meeting Paris, January 23rd and 24th, 2006 Institute d'Astrophysique.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Advanced Towards Advanced Virgo Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator on behalf of the Virgo Collaboration.
LIGO-G M Press Conference Scientific Operation of LIGO Gary H Sanders Caltech (on behalf of a large team) APS April Meeting Philadelphia 6-April-03.
The VIRGO detection system
The quest for gravitational waves. 2 The Universe has been studied essentially through EM radiation. GWs have a different origin. The Scientific Motivation.
1 The status of VIRGO E. Tournefier LAPP(Annecy)-IN2P3-CNRS Journées SF2A, Strasbourg 27 juin – 1er juillet 2005 The VIRGO experiment The commissioning.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
THE NEXT GENERATIONS OF GRAVITATIONAL WAVE DETECTORS (*) Giovanni Losurdo INFN Firenze – Virgo collaboration (*) GROUND BASED, INTERFEROMETRIC.
Interferometer configurations for Gravitational Wave Detectors
Virgo Status Detector Status Computing Data Analysis status and Plans
Evolution of the Virgo detector: The Virgo+ plans
Status of Virgo GWDAW Dec 13-16
Virgo Update B. Mours LIGO-G Z August 15, 2006 LSC meeting.
Commissioning the LIGO detectors
Stochastic background search using LIGO Livingston and ALLEGRO
Status of the LIGO Detectors
LIGO Interferometry CLEO/QELS Joint Symposium on Gravitational Wave Detection, Baltimore, May 24, 2005 Daniel Sigg.
Improving LIGO’s stability and sensitivity: commissioning examples
Squeezed Light Techniques for Gravitational Wave Detection
The views of Virgo collaboration groups on upgraded/advanced Virgo
Status at the Prague meeting
Presentation transcript:

MG 11 - Berlin Virgo status Marie-Anne Bizouard (LAL-Orsay) on behalf of the Virgo Collaboration

MG 11 - Berlin Ground based gravitational wave detectors Virgo detector commissioning – 2006 ( M. Barsuglia’s talk) Virgo data taking – 2005 Virgo data analysis – searches and detector characterization (E. Cuoco’s and C. Palomba’s talk) Virgo future preparation –Virgo++ (N. Man talk) –Advanced Virgo Short term planning Ground based gravitational wave detectors Virgo detector commissioning – 2006 ( M. Barsuglia’s talk) Virgo data taking – 2005 Virgo data analysis – searches and detector characterization (E. Cuoco’s and C. Palomba’s talk) Virgo future preparation –Virgo++ (N. Man talk) –Advanced Virgo Short term planning Outline

MG 11 - Berlin The Virgo Collaboration as in 2006 CNRS - LAPP - Annecy INFN - Firenze/Urbino CNRS - LMA/ESPCI – Lyon/Paris INFN – Napoli CNRS - OCA – Nice CNRS - LAL - Orsay INFN - Perugia INFN - Pisa INFN – Roma 2006: NIKHEF – Amsterdam (joining) + EGO (European Gravitational Observatory)  175 physicists / engineers

MG 11 - Berlin Growing ground based interferometers network 600 m 4 & 2 km 4 km 3 km AIGO ? km proposed + LCGT 3 km planned TAMA 300 m

MG 11 - Berlin Interferometers at a glance How to detect the path of a GW?  measure the displacement of the mirrors induced by the GW  light phase shift measurement But: GW amplitude is small h~ L=3km   L= m The laser has fluctuations in phase and amplitude External forces push the mirrors Seismic noise Thermal noise: vibration of bulk due to non null temperature Shot noise: quantum fluctuation in the number of detected photons

MG 11 - Berlin Virgo optical layout Laser Nd:YAG P=20 W Input Mode Cleaner Length = 144 m Recycling Output Mode Cleaner Length = 4 cm L=3km Finesse=50 L=3km Finesse=50 P=1kW A Michelson with 3 semi-transparent mirrors to form optical cavities to increase the power inside the arms

MG 11 - Berlin 1: longitudinal control Interferometer controls Keep the FP cavities in resonance (maximization of the phase response) Keep the PR cavity in resonance (minimization of the shot noise) Keep the output on the “dark fringe” (reduction of the dependence on power fluctuations) Keep the arms’ length constant within m

MG 11 - Berlin 2: angular control Interferometer controls Avoid high order mode generation (reduction of coupling dark fringe with frequency noise, power noise, input beam jitter, beam miscentering,..)  Reduction of the power fluctuation! Needs to control 12 degrees of freedom ITF power (a.u.) Auto-alignment ON

MG 11 - Berlin Interferometer controls Complicated scheme! Controls introduce noise in the dark fringe at low frequency (<100Hz)

MG 11 - Berlin

Free falling test masses … Thermal noise Multi stage pendulum ­ pre-isolator: inverted pendulum ­ cantilever springs for vertical isolation ­ cascade of six stages ­ height ~ 10 m

MG 11 - Berlin Foreseen sensitivity Seismic wall Thermal noise Shot noise

MG 11 - Berlin Ground based gravitational wave detectors Virgo detector commissioning – 2006 Virgo data taking – 2005 Virgo data analysis – searches and detector characterization Virgo future preparation –Virgo++ –Advanced Virgo Short term planning Outline

MG 11 - Berlin Virgo sensitivity curve progresses (as end of 2005) C7 run (sep. 2005): Best strain h ~ / Hz 1/2 NS/NS maximum range ~ 1.5 Mpc (optimal orientation)

MG 11 - Berlin Noise budget

MG 11 - Berlin Shutdown at end of 2005 – Why? Fringes due to backscattering in the Mode Cleaner  Increase a lot the frequency noise  Need to operate with reduced power 0.7 W instead of 7W !  Solution: Faraday isolator on the injection bench to attenuate the backscattering light a new injection bench Backscattering

MG 11 - Berlin Shutdown at end of 2005 – Why? Non-monolithic and curved Power Recycling mirror –Curved: because part of the output telescope to match the beam –Non-monolithic: lots of resonances  control problems and alignment drifts Solution: –Monolithic mirror –Flat mirror  No more lens effect: larger beam coming from the injection bench need of a telescope on the injection bench a new injection bench 120 mm R=4100 mm 350 mm Incident Beam Translations induce misalignment and jitter noise  flat mirror

MG 11 - Berlin New injection bench Faraday isolator New parabolic telescope

MG 11 - Berlin Virgo commissioning – new input bench Sep 2005 – April 2006 New scheme of the alignment wrt to the ITF Parabolic telescope alignment done Locking of the Mode Cleaner cavity Beam matching: 95% reached Faraday isolator tuned 7 W entering in the ITF 280 W on the BS (sep. 2005: 25W! ) Mode Cleaner transmitted power July 2004: before beam attenuation (.7W) March 2006: Concern: the Faraday isolator attenuation factor is only 100 instead of Under investigation while not yet a problem in the sensitivity curve!

MG 11 - Berlin Virgo commissioning – full power recycled interferometer Feb 2006 – until now We had few problems/difficulties: Beam matching Beam astigmatism Beam clipping on detection bench Oscillations in signals used for control  lock losses! Thermal effect in substrate (25W  280W on Beam Splitter mirror) ? Improvement of the beam matching and centering  increase the power inside the ITF by a factor 2  no more wire heating 10 hours Work done on: - demodulation phase tuning - more angular degrees of freedom controlled Lock stability improved a lot !

MG 11 - Berlin Virgo sensitivity – July 2006! High frequency: better than one year ago Low frequency: a lot of work to be done! The noise hunting period just restarted More details in M. Barsuglia’s talk Power Recycling mirror control noise

MG 11 - Berlin Ground based gravitational wave detectors Virgo detector commissioning – 2006 Virgo data taking – 2005 Virgo data analysis – searches and detector characterization Virgo future preparation –Virgo++ –Advanced Virgo Short term planning Outline

MG 11 - Berlin The last data taking periods Andromeda Horizon for SNR=8, optimally oriented 1.4/1.4 M NS-NS binary 14 days duty cycle: 86% in Science Mode 5 days duty cycle: 65% in Science Mode C6 July 2005 C7 Sep best NS-NS distance range: 1.5 Mpc

MG 11 - Berlin Ground based gravitational wave detectors Virgo detector commissioning – 2006 Virgo data taking – 2005 Virgo data analysis – searches and detector characterization Virgo future preparation –Virgo++ –Advanced Virgo Short term planning Outline

MG 11 - Berlin Data analysis in Virgo at a glance Group activities –Noise –Burst (SN, unmodelled short signal) –Binary inspiral –Pulsar –Stochastic background Collaborations –Auriga-RoG-Virgo –LIGO-Virgo Data taking: C6 & C7 More dealing with pipeline development detector characterization than with “physics” search or competitive upper limits More details in E. Cuoco and C. Palomba’s talks

MG 11 - Berlin Burst events search Burst studies on a single detector: hard! –Event distribution dramatically different from Gaussian –Vetoes based on auxiliary channels Understand the machine! Hardware injections to test veto safety Identification of the main source of excess noise for the burst search Excess noise above 100 Hz due to dark fringe coupling with the frequency noise when the North End is tilted  problem of mirror angular control (too loose during C6 &C7) Vetos definition: excess frequency noise environmental glitches (air conditioning for instance) air plane Nice reduction of the burst fake events … but huge dead time: >20% without veto with veto

MG 11 - Berlin Inspiral search Up to now focus only on NS-NS search (2 pipelines developed in Virgo) C6 & C7 analysis main concern: veto strategies set up use of “  2” methods to reject fake events The  2 checks the compatibility between the signal waveform and the recorded strain  2 2 bands < 40 Samples above threshold < 30  2 2 bands < 40 “hardware” injected events (equivalent force applied on mirror)

MG 11 - Berlin Continuous sources search All-sky search pipeline C6 & C7 work goal: –1kHz band considered –Production of bank of candidates for C6 and C7 and performance coincidence –Detection of detector related noise that could bias the analysis For more details: C. Palomba’s talk Example: 10 Hz disturbance : pulses caused by a video camera Number of candidates : excess for some frequencies! Sensitivity obtained : h~ Hz C6 Frequency (Hz)

MG 11 - Berlin Stochastic background search Search done by cross- correlated the output of 2 detectors The closer the detectors, the lower the frequencies that can be searched Virgo Ligo Hanford Virgo Ligo Livingston Virgo GEO Ligo Hanford Ligo Livingston Ligo Hanford GEO Ligo Livingston GEO Virgo does not have yet the sensitivity to constrain the SB but got prepared. Two collaborations: Auriga/Nautilus/Explorer/Virgo Limited by the bars sensitivity curve  GW < 2 x (Virgo design sensitivity) LSC-Virgo – Just starting project – Standard cosmological background (isotropic) search – Targeted search (sky map of gw)

MG 11 - Berlin International collaborations Auriga-RoG-Virgo –Burst search –Stochastic background search LSC-Virgo: joint GEO, LIGO and Virgo data analysis effort –Burst, inspiral : start working for 2 years! “Physics gain” to add a non aligned ITF to LIGO network: - reconstruction of the source location - detection efficiency enhanced by 50% (burst) or 30% (inspiral) –SB just joins –We are in the process of defining the data exchange agreement and how to work as a joint data analysis group. –Sketching a possible joint run planning (VERY PRELIMINARY) S5

MG 11 - Berlin Ground based gravitational wave detectors Virgo detector commissioning – 2006 Virgo data taking – 2005 Virgo data analysis – searches and detector characterization Virgo future preparation –Virgo++ –Advanced Virgo Short term planning Outline

MG 11 - Berlin Short –Acoustic isolation –Pre-Mode Cleaner –Upgrade of the quadrant diode front-end electronics –New coil drivers (R&D) Intermediate –Eddy current dissipation mitigation –New MC mirror payload –New DSP electronics (R&D) –Thermal compensation Virgo+ upgrades –High power laser amplifier –Monolithic payload –New DAQ electronics (R&D) Virgo upgrades planning 2008 Now “Standard” upgrades dedicated to reach the Virgo nominal sensitivity Short –Acoustic isolation –Pre-Mode Cleaner –Upgrade of the quadrant diode front-end electronics –New coil drivers (R&D) Intermediate –Eddy current dissipation mitigation –New MC mirror payload –New DSP electronics (R&D) –Thermal compensation Virgo+ upgrades –High power laser amplifier –Monolithic payload –New DAQ electronics (R&D) high freq. shot noise reduction! low and inter. freq. thermal noise reduction!

MG 11 - Berlin Virgo+ scientific outreach NS-NS signal detection benefits Of the sensitivity improvement at intermediate frequency Shot noise decrease Thermal noise decrease

MG 11 - Berlin Ground based gravitational wave detectors Virgo detector commissioning – 2006 Virgo data taking – 2005 Virgo data analysis – searches and detector characterization Virgo future preparation –Virgo++ –Advanced Virgo Short term planning Outline

MG 11 - Berlin Short term planning - Conclusions

MG 11 - Berlin