H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Open Issues Readout cycle: 10 µs or 20 µs ? Advantages of 20 µs: - smaller.

Slides:



Advertisements
Similar presentations
H.-G. Moser Max-Planck-Institut fuer Physik 2 nd open meeting July 4, 2008 Report on PXD Session.
Advertisements

2nd Open Meeting of the SuperKEKB Collaboration, KEK, March 2009 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Sensor R&D and Prototyping - Status -
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
May 14, 2015Pavel Řezníček, IPNP Charles University, Prague1 Tests of ATLAS strip detector modules: beam, source, G4 simulations.
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Monolithic Pixels R&D at LBNL Devis Contarato Lawrence Berkeley National Laboratory International Linear Collider Workshop, LCWS 2007 DESY Hamburg, May.
2. Super KEKB Meeting, DEPFET Electronics DEPFET Readout and Control Electronics Ivan Peric, Peter Fischer, Christian Kreidl Heidelberg University.
ECFA ILC Workshop, November 2005, ViennaLadislav Andricek, MPI für Physik, HLL DEPFET Project Status - in Summary Technology development thinning technology.
SuperKEKB 3nd open meeting, July Hans-Günther Moser MPI für Physik PXD Summary Other talks in software, SVD and DAQ sessions.
ILC VXD Review, Fermilab, October 2007 Ariane Frey, MPI für Physik DEPFET Vertex Detector Simulation and Physics Performance Ariane Frey for the DEPFET.
SuperKEKB 2nd open meeting March 17-19, 2009 Hans-Günther Moser MPI für Physik PXD Session SOI: more information: see TIPP09 -> submission in February,
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
ILC VXD Review, Fermilab, October 23, 2007 Hans-Günther Moser, MPI für Physik DEPFET Devices Hans-Gunther Moser for the DEPFET Collaboration (
FPCCD Vertex detector 22 Dec Y. Sugimoto KEK.
LCWS08, Chicago, November 2008 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Active Pixel Sensors - Status and Plans - Ladislav Andricek for the DEPFET.
R+D for future accelerators at Santiago Pablo Vázquez IGFAE-USC Instituto Galego de Gísica de Altas Enerxías Universidade de Santiago de Compostela.
H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Summary of PXD Session 1 Status of CAPSH. Hoedlmoser (Video)
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
The Belle II DEPFET Pixel Detector
Kevin Nash MaPSA-Light test system 1. The System 2.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,
Eleuterio SpiritiILC Vertex Workshop, April On pixel sparsification architecture in 130nm STM technology ILC Vertex Workshop April 2008 Villa.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
6/19/06 Su DongSiD Advisory: VXD DOD Summary II1 VXD DOD Summary (II) Sensors & Other system Issues.
Run II preparations Test beam plans Moving from 156 to 169 DT-LHCb coordination meeting June 2, 2015.
Spanish Linear Collider Meeting, Valencia, December 2012 Ladislav Andricek, MPI für Physik, HLL 1 DEPFET APS for future collider applications -Status and.
1 Test Beam with Hybrid 6 Florian Lütticke for the Testbeam Crew Bonn University 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
PXD EVO Hans-Günther Moser MPI für Physik Meeting on Services and Power Supplies Aim: define the services chain form module to external racks.
Hybrid Boards for PXD6 5th International Workshop on DEPFET Detectors and Applications Sept Oct Christian Koffmane 1,2 1 Max-Planck-Institut.
PXD ASIC review, October 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
Simulation of a DEPFET Pixel Detector IMPRS Young Scientist Workshop July, 26 – 30, 2010 Christian Koffmane 1,2 1 Max-Planck-Institut für Physik, München.
H. Krüger, , DEPFET Workshop, Heidelberg1 System and DHP Development Module overview Data rates DHP function blocks Module layout Ideas & open questions.
1 Characterization of Pilot Run Modules for the Belle II Pixel Detector Felix Müller Max-Planck-Institut für Physik IMPRS Young Scientist Workshop Ringberg.
H.-G. Moser Max-Planck-Institut für Physik Future Vertex Detectors in HEP Projects: LHC (upgrade 2018+) Belle 2 (upgrade 2018+) ILC/CLIC (2020+)
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
Power Supply for DEPFET in SuperBelle Pablo Vazquez IGFAE-USC Henryk Palka INP-KRA.
H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Barcelona Summary Thanks to our hosts for UB for a great meeting!
H.-G. Moser, 6 th PXD/SVD workshop, Pisa, Oct PXD Summary 1 DEPFET Sensors production yield inter-metal insulation EMCM electronic tests ASICs Schedule.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
TILC08, Sendai, March DEPFET Active Pixel Sensors for the ILC Marcel Vos for the DEPFET Collaboration (
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
H.-G. Moser Max-Planck-Institut for Physics, Munich Vertex07 Lake Placid, NY 9/25/2007 DEPFET Active Pixel Detectors H.-G. Moser on behalf of the DEPFET.
Clear Performance and Demonstration of a novel Clear Concept for DEPFET Active Pixel Sensors Stefan Rummel Max-Planck-Institut für Physik – Halbleiterlabor.
H.-G. Moser Max-Planck-Institut fuer Physik DEPFET Meeting Heidelberg Sept DEPFET Geometry for SuperBelle Sensor Geometry Pixel Pitch Constant/variable.
1 Test of Electrical Multi-Chip Module for Belle II Pixel Detector DPG-Frühjahrstagung der Teilchenphysik, Wuppertal 2015, T43.1 Belle II Experiment DEPFET.
1 First large DEPFET pixel modules for the Belle II Pixel Detector Felix Müller Max-Planck-Institut für Physik DPG-Frühjahrstagung der Teilchenphysik,
ASICs1 Drain Current Digitizer Chip (DCD) Status and Future Plans.
 Silicon Vertex Detector Upgrade for the Belle II Experiment
Results achieved so far to improve the RPC rate capability
Requirements and Specifications for Si Pixels Sensors
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Integration and alignment of ATLAS SCT
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
Development of the Data Handling Processor DHP
Lars Reuen, 7th Conference on Position Sensitive Devices, Liverpool
Status of n-XYTER read-out chain at GSI
SVT detector electronics
Perugia SuperB Workshop June 16-19, 2009
2nd DEPFET workshop 3-6 May 2009
Front-end Digitization for fast Imagers.
Presentation transcript:

H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Open Issues Readout cycle: 10 µs or 20 µs ? Advantages of 20 µs: - smaller pixel -> better resolution - smaller pixel -> fast charge collection, no additional drift rings (proven ILC design) - 100ns lines readout instead of 80ns Disadvantages: - higher occupancy - more readout bandwidth needed -> decision ? - more shared frames (multiple triggers) - more power (switcher, but only idle chips, number of active lines Constant or variable pitch? no improvement (surprise?) complicated design (drift rings) -> CP baseline? Bricked pixels? helps for 1600/2000 CP Trigger rate: 10 kHz or 30 kHz final or initial running? burst or steady? if this is an issue it may have an impact on 10/20 µs choice

H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Open Issues Irradiations: factor 2 lower: 4 Mrad instead of 8 Mrad check dosimetry (SDD, RADFET) repeat up to 10 Mrad DHP single or multiple chips? DHH definition of inputs and outputs Kapton connection DHP-DHH Where should it be located DCD tests Good news: works at 12.5 MHz (80 ns line rate) noise not yet satisfactory: 450 e with 50pF load (x 1.4 for CDS ?) -> better understanding -> need to increase gq? power (5-6 mW/ch) ? further development: new readout options? Module layout power/signal distribution regulators? 3rd metal line bump bonding options

H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Open Issues Physics studies (pixel optimisation), SVD digitization Fix tracking code (correct impact parameter mesurement) Test with single tracks (muons MeV) Use real physics events Get realistic background simulation Power supplies (Testbeam) ready for testbeam? testing of matrices? Power supplies (Bellle II) space requirements and location of docks Voltage list and specs (can the number of voltages be reduced) Sensing, regulators Slow control grounding policy (ground loops half-module but monolithic sensor) Cooling Issues max. airflow? Vibrations? how to get the air in/out? protection of the SVD? ……you name it…

H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 What is the chance of a smaller beam pipe? Most likely radius Impact on ladder dimensions Au layer: can this be reduced Machine Issues Will we have a larger crossing angle (60 mrad) ? Beam pipe tilt beyond 22mrad: nightmare! Will we have a smaller beam energy asymmetry ?

H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Organisational Matters Common Wiki for all the presentations in the WP meetings Experience with present HLL host? Meetings of WP partners should be announced at least 1 week ahead ( , Wiki) Meetings of WP partners should be documented Experience with EVO Meetings schedule needed (external partners calling in) Create a DEPFET EVO room? Conference Contributions