LHCb Muon Station Cooling Studies (done by Ricardo Antunes Rodrigues (ST/CV)) This simulations were made for the Muon Station 1, with the follow assumptions:

Slides:



Advertisements
Similar presentations
New Plate Baffle Water Flow. Quick Simulation Use triangular prism as rough estimate of a vane Uniform heat flux on each surface –600 kWm -2 on end face.
Advertisements

RFQ End Flange Dipole Tuner Finger Cooling. Basis of Study Need multi-purpose end flange –Adjustable dipole mode suppression fingers –Beam current transformer.
The First Law of Thermodynamics
First Law of Thermodynamics - Open Systems
Chapter 4 Mass and Energy Analysis of Control Volumes (Open Systems)
Finite Element Modeling and Simulation of the Effect of Water Injection on Gas Turbine Combustor NO x Emissions and Component Temperature Joseph M. Basile.
Chapter 4.2: Flow Across a Tube Bundle Heat Exchanger (Tube Bank)
Chapter 3.2: Heat Exchanger Analysis Using -NTU method
Computer Aided Thermal Fluid Analysis Lecture 10
Chapter 2: Overall Heat Transfer Coefficient
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
Thermal Analysis of short bake out jacket version 1 12-Nov-2013.
1 Integration issues of FPCCD VTX Yasuhiro Sugimoto May 22,
Simulation of Air-Cooling for the Gear Unit in Pump and Turbine Generator Systems M. Fujino* and T. Sakamoto** *Information Technology Center, Nippon Institute.
Mass and Energy Analysis of Control Volumes. 2 Conservation of Energy for Control volumes The conservation of mass and the conservation of energy principles.
Thermal Analysis of Helium- Cooled T-tube Divertor S. Shin, S. I. Abdel-Khalik, and M. Yoda ARIES Meeting, Madison (June 14-15, 2005) G. W. Woodruff School.
MuCool Absorber Review meeting FermiLab, Chicago 21 – 22 February 2003 Fluid Flow and Convective Heat Transfer Modelling by Wing Lau & Stephanie Yang Oxford.
MICE Collaboration meeting at Columbia University, New York 12 – 14 June 2003 How Liquid Hydrogen behaves thermally in a Convective Absorber by Wing Lau,
Chapter 5 Mass and Energy Analysis of Control Volumes Study Guide in PowerPoint to accompany Thermodynamics: An Engineering Approach, 5th edition.
HEAT EXCHANGERS Day 2.
Cooling Update (May 2011) Tim. Overview From last time – Estimate Power Loads Active components Extraneous heat sources – Develop methodology for exploring.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Development of Synthetic Air Jet Technology for Applications in Electronics Cooling Dr. Tadhg S. O’Donovan School of Engineering and Physical Sciences.
Steam Condenser II Prof. Osama El Masry
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
TS/CV/DC CFD Team Computational Fluid Dynamics at CERN Michele Battistin CERN, Geneva - Switzerland.
Bias Magnet for the Booster’s 2-nd Harmonic Cavity An attempt to evaluate the scope of work based of the existing RF design of the cavity 9/10/2015I. T.
Summary: Mechanics - Overview of the MFT in ALICE. - Description of the MFT. - Description of a MFT detection plane. - Environment of the MFT. - Procedure.
CP502 Advanced Fluid Mechanics Compressible Flow Lectures 5 and 6 Steady, quasi one-dimensional, isentropic compressible flow of an ideal gas in a variable.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
Consideration of Baffle cooling scheme
Global Winds. Atmospheric Pressure  Wind is caused by differences in air pressure around earth’s surface.  Differences in air pressure are due to the.
Convection: Internal Flow ( )
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
Heat Transfer Equations. Fouling Layers of dirt, particles, biological growth, etc. effect resistance to heat transfer We cannot predict fouling factors.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
RICH Installation and integration in CLAS12 October 13 th 2015 D. Orecchini, S. Tomassini 1 CLAS12 RICH- Mid Term Review.
Adaptive Optics in the VLT and ELT era Atmospheric Turbulence
M. Gomez Marzoa1 13th December 2012 PSB-Dump: first CFD simulations Enrico DA RIVA Manuel GOMEZ MARZOA 13 th December 2012.
STUDY OF THE AIR TEMPERATURE AND VELOCITY AROUND THE ATLAS MUON CHAMBERS Emma Vigo Castellvi ST/CV Design.
DCLL ½ port Test Blanket Module thermal-hydraulic analysis Presented by P. Calderoni March 3, 2004 UCLA.
Simple CFD Estimate of End Flange Tuner Finger Cooling.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
TS/CV/DC CFD Team CFD Study of the L3 Thermal Environment Sara C. Eicher
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
The Second Law of Thermodynamics Entropy and Work Chapter 7c.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Muon barrel cooling G. Aielli and J. Godlewski LS1 TC planning.
LHCb Install Meeting - 12 / 05 / 2004 Paolo Guglielmini - TS / CV LHCb Cooling of the sub – detectors INNER TRACKER TRACKER TRIGGER RICH 1 RICH 2 Status.
Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.
Cooling of GEM detector CFD _GEM 2012/03/06 E. Da RivaCFD _GEM1.
1 Antonio Romanazzi 3D CFD study of the ATLAS (UX15) ventilation system.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
Heat Transfer by Convection
Heat Transfer Su Yongkang School of Mechanical Engineering # 1 HEAT TRANSFER CHAPTER 8 Internal flow.
Momentum Equation and its Applications
Date of download: 7/6/2016 Copyright © ASME. All rights reserved. From: Performance Analysis of a Combination System of Concentrating Photovoltaic/Thermal.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
1 Chapter 5 Mass and Energy Analysis of Control Volumes.
6.5 Recommended Velocity Of Flow In Pipe And Tubing.
First Law of Thermodynamics applied to Flow processes
CMS GEM services: Cooling
Perpindahan Panas Minggu 09
Chapter 5 The First Law of Thermodynamics for Opened Systems
MAE 5360: Hypersonic Airbreathing Engines
Chapter 5 Mass and Energy Analysis of Control Volumes Study Guide in PowerPoint to accompany Thermodynamics: An Engineering Approach, 6th edition.
Mass and Energy Analysis of Control Volumes (Open Systems)
Ventilation efficiency for Horn cooling
Thermal behavior of the LHCb PS VFE Board
PANDA Collaboration Meeting
Presentation transcript:

LHCb Muon Station Cooling Studies (done by Ricardo Antunes Rodrigues (ST/CV)) This simulations were made for the Muon Station 1, with the follow assumptions: ● The walls close to the RICH and ECAL systems are considered adiabatic (unless stated otherwise). ● The flux in the muon chambers can only exit by the four smallest areas. ● The flux in the muon chambers is equally distributed through the surfaces. News results since the last meeting: Increased power consumption Introduction of cables

Boundary Location Symmetry CablesInlet/Outlet Global overview of the model

Boundary Location Region 1 Region 2Region 3 Region 4 292Flux [W/m 2 ] 0.494Area [m 2 ] 144Power [W] 193Flux [W/m 2 ] 1.494Area [m 2 ] 288Power [W] 61Flux [W/m 2 ] 4.716Area [m 2 ] 288Power [W] 16Flux [W/m 2 ] Area [m 2 ] 288Power [W]

With Pressure Conditions 0.56Inlet Velocity [m/s] 40Max. Temperature[ºC] 20Inlet Temperature [ºC] 0.76Inlet Velocity [m/s] 41Max. Temperature[ºC] 25Inlet Temperature [ºC] No Cables

1.5 times the Power With Cables Without Cables 0.89Inlet Velocity [m/s] 52/21.4Max./Avg. Temperature[ºC] 20Inlet Temperature [ºC] 0.24Inlet Velocity [m/s] 55/22.2Max./Avg. Temperature[ºC] 20Inlet Temperature [ºC] The boundary with Rich and ECAL systems are considered as 20ºC walls

2.0 times the Power With Cables Without Cables 0.9Inlet Velocity [m/s] 67/21.8Max./Avg. Temperature[ºC] 20Inlet Temperature [ºC] 0.25Inlet Velocity [m/s] 61/22.7Max. Temperature[ºC] 20Inlet Temperature [ºC] The boundary with Rich and ECAL systems are considered as 20ºC walls

Cells Temperature overview Temperature above 30 ºC Temperature above 35 ºC Temperature above 40 ºC This images were taken from the 1.5 times the power case

Summary of Simulation Studies ● In the case of an average power consumption of 1.5W per FE-board, ~0.1% of the cells have a temperature above 35 o C (in M1) ; ~1.2% of the cells have a temperature above 30 o C ; ~11.8% of the cells have a temperature above 25 o C. ● The introduction of cables does not lead to much increased temperatures. ● Since the total power dissipated into the cavern is not really a concern, blowing fresh air into the inner part of the system seems to be sufficient from point of view of cooling. Otherwise some ‘aspiration’ should be foreseen. ● An LHCb note summarizing the results is under preparation.

Cooling for FE-boards: ● The chambers in regions R1 and R2 have up to 24 FE-boards/chamber and hence quite a large power consumption on a small area ->We foresee to have a sort of air cooling, where either the hot air is aspirated directly from the “box” around the chamber, in which the FE-boards are mounted, and cooler air will flow into the “box” (not tight) from the surrounding area. or air of about 17 o C is blown into or around the chambers in R1 and R2 ->Even without this sort of cooling the maximal temperature would be about 65 o C, hence uncritical for the electronics. ● The power consumption of the electronics for the larger chambers in R3 and R4 is less than 10W and no cooling is foreseen. ->We expect that in total about 2/3 (6.5 kW) of the power from the FE will be dissipated and 1/3 (3.5kW) will be cooled Cooling

Example for air-cooling of the FE-boards: Assume that 200W of power have to be cooled per station, and the ΔT we want to cool by air (1kJ/kgK) is 5K. This leads to an airflow Q of 0.04kg/s or (air: 1.2kg/m 3 ): ~33l/s (120m 3 /h) We will have 24 chambers per half-station to be connected to the cooling, so we would have a flow of 5m 3 /h per line. Assuming a tube diameter of 10mm, we get with Q/v=πr 2 (for round tubes) a a velocity for the cooling air of 4.4m/s, which is still ok. ->Careful test would have to be carried out to check that this works. We would count on support from ST/CV... -> A study needs to be done to check that the cooling pipes can be fits into the system space-wise. Air Cooling