Flow Measurements Pitot Versus Tracer - A Utility Perspective Phil Gernenz Exelon – Braidwood Station Based upon Control Room Envelope Tracer Gas testing.

Slides:



Advertisements
Similar presentations
Testing of Ventilation Systems
Advertisements

Factor of Evaporation: lbs/hr steam produced per BHp.
Extrusion-Based Processes
Lesson B3–2 Measuring Trees Next Generation Science / Common Core Standards Addressed! ·HSNQ.A.1 Use units as a way to understand problems and to guide.
Topical Aspects on Monitoring Airborne Radioactive Effluents from NPPs Wan-tae KIM.
The Role of Controls for Indoor Air Quality Kent W. Peterson, PE, Fellow ASHRAE P2S Engineering, Inc. Mid Columbia ASHRAE Chapter.
Operating Characteristics of Nozzles P M V Subbarao Professor Mechanical Engineering Department I I T Delhi From Takeoff to cruising …… Realizing New.
Air Flow Bench Presented By: Saket Karajgikar & Nikhil Lakhkar Advisor: Prof. Dereje Agonafer.
H. Clay Moore & Associates Key Account Manager - Nuclear
Heating and Air Conditioning I
Airflow Properties & Measurement
1 Meeting ASHRAE Fundamentals, Standard 55 & 62.1 with Chilled Beams Displacement Ventilation.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Trevor Thompson Senior Project II Vermont Technical College Spring 2011.
Licensing of Nuclear Power Plants in Pakistan
ARCH-4372/6372 HVAC Distribution & Sizing HVAC Distribution Systems
Dust Division Pittsburgh Safety and Health Technology Center Mark Schultz Senior Mining Engineer.
Model guidance for storage and transport of time and temperature-sensitive pharmaceutical products (WHO Technical Report Series, no.961, 2011, Annex 9)

NFPA 13: Installation of Sprinkler Systems
Gas Transportation through Pipelines
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
NON-TRACER GAS METHODS TO EVALUATE ISOLATION DAMPER LEAKAGE Peter Lagus, Ph.D., CIH Lagus Applied Technology, Inc Joe Bendyk Exelon Limerick Station.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
PUBLIC HEARING FOR THE PROPOSED Notice To Lessee/Operators of Onshore Federal Oil and Gas Leases Within the Jurisdiction of the Wyoming State Office (NTL.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
A SUMMARY OF CDBI FINDINGS IN SERVICE TESTING OWNERS GROUP December 2010 Clearwater, Florida.
What do these changes mean for Agreement State Programs?
 Purpose  Test design  Measurement system and Procedures  Uncertainty Analysis.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Improved Precision Leading to Improved Energy Efficiency Edward Decker AE 790 – Intelligent Buildings June 6, 2006.
Air Ceiling Unidirectional ceiling air distribution system.
Agriculture Ventilation Fans: A National Energy Efficiency Standard R. D. MacDonald, P.Eng, M. E. Armstrong, P.Eng, and K. Gibb, Agviro, Inc., Guelph,
REGULATORY PERSPECTIVE ON USING OPERATIONAL EXPERIENCE Thomas E. Murley Former Director of Nuclear Reactor Regulation USNRC Conference on Improving Nuclear.
Ahmed M. El-Sherbeeny, PhD Industrial Engineering Department
1 Control Room Habitability Program James A. Carlson, Omaha Public Power District, Author Deep Ghosh, Southern Nuclear Operating Greg Holbrooks, PE, Duke.
NAFA Guide To Air Filtration Chapter 2 Principles of Air Flow, Air Pressure And Air Filtration presented by the National Air Filtration Association Fourth.
AIR FLOW IN DUCTS Shaharin Anwar Sulaiman
1 Review of Specifications for Digital Upgrades NHUG Summer Meeting July 17, 2008 Tim Mitchell Component Engineering Palo Verde Nuclear Generating Station.
Testing Fan Filter Units
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
RECOMMENDATIONS ON IMPROVEMENT OF PUBLIC PROCUREMENT SYSTEM Experts: Bazakeeva Jyldyz Jamanchaevna Abdymomunona Saina Ryskeldievna Recommendations were.
GOVERNMENT ENGINEERING COLLEGE, BHARUCH (014) Chemical Engineering department SEM-iii Sub: fluid flow operation topic: orifice meter & rotAmeter Guid by:
Day 3 Part 3 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Plenum Plenum design is based on Equal Static Pressure using Static Regain Most duct systems are designed to maintain Equal Friction or Equal Velocity.
Day 4 Part 2 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Mi9 Some experimental measurements of the Diffuser flow in a Ducted Wind Turbine assisted by two ejectors Kypros F. Milidonis Department of Mechanical.
UNDERSTANDING DIFFERENT
AIR-CONDITIONING DUCT NETWORK Balázs BOTH D008 (Ventilation Laboratory) Budapest University of Technology and Economics.
PUBLIC HEARING FOR THE PROPOSED
Air Flow Measurement K. F. Chan UNIVERSITY OF HONG KONG
Integrating Modeling and Physical Testing for Assessing Filtered Exhaust Stack Sampling Probe Location Xiao-Ying Yu, Kurtis P. Recknagle, John A. Glissmeyer,
Measurement of discharge
Presented by Harry C. Elinsky, Jr. Filtech, Inc.
Technician’s Guide & Workbook for Duct Diagnostics and Repair
National Laboratory Association
Air Volume Flow Rate and Centerline Velocity in a Tube Wind Tunnel
Limit, Fit & Tolerance – Numerical Problems
In-Situ Filter Testing
EPRI Development of Nuclear Power Plant Implementation Guide for NRC Branch Technical Position on Concentration Averaging and Encapsulation Presented.
Controlling Chemical Hazards
MECH 8250 – Building Systems Winter 2015
Risk Reduction Potential of Accident Mitigation Features
ICE 101 APPLICATION GUIDE INTALLATION AND OPERATIONAL CONSIDERATIONS.
M. Vanuzzo, M. Carcassi. Università di Pisa
TRTR Briefing September 2013
QLF.
Nafa Tech Seminar Phoenix Arizona 2004
Presentation transcript:

Flow Measurements Pitot Versus Tracer - A Utility Perspective Phil Gernenz Exelon – Braidwood Station Based upon Control Room Envelope Tracer Gas testing December 2004

Emergency Make Up Air Flow Measurements A-train: Tracer Gas: 5004 SCFM Hot Wire: 5847 ACFM Pitot/Manometer: 6230 ACFM B-train: Tracer Gas: 4914 SCFM Pitot/Manometer: 5901 ACFM Pitot/Manometer 20% higher than Tracer Gas

Converting Flows to ACFM A-train:B-train: Tracer Gas: 5607* 5437* Pitot: Hot Wire: 5847N/A Still not the same…… * The flow used for the final tracer gas test results was taken upstream of the filter unit. The flows referenced on this page were based upon tracer gas test measurements taken at the pitot traverse which is located downstream of the filter unit. The difference between upstream and downstream of the filter unit was about 30 SCFM.

Incorporating tolerances Tracer Gas using ANSI/ASME Standard Uncertainty Model. Pitot / Hotwire using +/-10% per ANSI N (ACFM)A-trainB-train Tracer Gas Pitot Hot Wire

UFSAR/Technical Specification Requirements References Regulatory Guide 1.52 Revision 2 and ANSI N ANSI N establishes airflow acceptance criteria in accordance with ACGIH Industrial Ventilation Section 9. Industrial Ventilation provides guidance for using the pitot traverse methodology involving the equal area method. Therefore, use of the pitot traverse is consistent with Braidwood's licensing basis requirements.

Review of the Pitot Traverse The duct dimension was 18” x 28” +/- 1/8” No interferences (structural members) could be found internal to the duct The pitot traverse meets the requirements of a satisfactory distribution as defined in Industrial Ventilation Section 9 (75% readings greater than 0.10(maximum VP)). HOWEVER:

Review of the Pitot Traverse The required distance downstream of the nearest air disturbance such as an elbow should be 7.5 duct diameters. The pitot traverse should be at 15 feet 4 inches downstream of the nearest upstream elbow. On A- train the distance is 14 feet 1 inch (less than recommended distance). On B-train the distance is 15 feet 8 inches. The minimum recommended number of traverse points is 16. The pitot traverses used has only 15 points (less than recommended number).

New traverses created A-train Traverse A) Original Pitot Traverse: 14’1” downstream of elbow Traverse B) New Traverse using Log –Tchebycheff Method: 23’ downstream of elbow Traverse C) New Traverse using Equal Areas (28 points): 23’ 8” downstream of elbow B-train Traverse A) Original Pitot Traverse: 15’8” downstream of elbow Traverse B) New Traverse using Log –Tchebycheff Method: 22’ 7” downstream of elbow Traverse C) New Traverse using Equal Areas (28 points): 23’ 3” downstream of elbow

Results of Different Traverses Flows (ACFM) were taken using a 0-10iwg inclined manometer and Shortridge (ADM- 80) in conjunction with a pitot tube. Train A: Traverse # of ManometerShortridge % Difference points A % B % C % % Difference2.2%2.3% Train B: Traverse # of ManometerShortridge % Difference points A % B % C % % Difference1.6%2.7%

OPEX Plant Event #34480 (1998) – Plant was using Orifice Plate for flow measurement to meet Technical Specification requirement, however, Technical Specification flow measurement was to be in accordance with ANSI N which requires that the pitot traverse be used. Event Number (1998) - Plant was using Hot Wire for flow measurement to meet Technical Specification requirement, however, Technical Specification flow measurement was to be in accordance with ANSI N which requires that the pitot traverse be used. OE19047 (2004) – Plant Technical Specifications specified “SCFM” as opposed to “CFM”. Design and regulatory Guidance specified flowrate in “CFM”.

Conclusion Ensure you are obtaining data in accordance to your Licensing Basis as required.

Flow Profiles