ESS RFQ INTERFACES | Didier CHIRPAZ-CERBAT CEA-ESS INTERFACES.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
G2P Target installation and Beyond. Schedule Pivot before.
ATLAS-NSW CERN MMM workshop assembly of the module (quadruplet)
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
APPLICATION OF EDMS TO XFEL CRYOMODULE ASSSEMBLY AT CEA Christelle CLOUE - Catherine MADEC.
324MHz FETS RFQ RF measurement and components By Aaron Cheng 18 December 2006.
SAISINUC SOFTWARE ENVIRONMENT Data tools: import, check, export, use DDEP , October 8-10 Marie-Martine Bé, Charlène Bisch, Christophe Dulieu, Mark.
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
Alain FRANCE for the ESS RFQ Team at CEA Saclay
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Irfu.cea.fr ATLAS-NSW CERN MMM WORKSHOP MM WEDGES MADE OF 4 MODULES of February 2013 Patrick PONSOT for the CEA-Saclay-Irfu group: F.Bauer, P.Daniel-Thomas,
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
Anders Sunesson RF Group ESS Accelerator Division
Manufacturing contracts for RFQ
Manufacturing process, validation and factory test
PRELIMINARY VERSION ESS RFQ CDR 2 TIME SCHEDULE, PROJECT RISKS, RAMI AND SAFETY Anne-Catherine CHAUVEAU8th and 9th december 2015.
October 1st 2015 Alexis Fouché 1, Florian Noyrit 1, Sébastien Gérard 1, Maged Elaasar 2 SYSTEMATIC GENERATION OF STANDARD COMPLIANT TOOL SUPPORT OF DIAGRAMMATIC.
ESS-Bilbao: MEBT vacuum standarization
RISK REGISTER Management & Engineering
ESS RFQ PROJECT RISKS Anne-Catherine CHAUVEAU 14 January 2016.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES.
ESS CRYOMODULE RISKS REGISTER ESS CRYOMODULE COMPONENTS AND CAVITY EXPERTISE Franck PEAUGER14th January 2016.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
RF PROCESSING OF RFQ COUPLERS CDR2 | Michel Desmons 8-9 DEC 2015.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
1 ESS Warm End Linac Cooling Water 5-6 May 2014 John Jurns.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Accelerator RFQ system Anne-Catherine CHAUVEAU for the ESS RFQ Team at CEA Saclay April, 2016.
ESS RFQ B. POTTIN and RFQ team CEA-IRFU. RFQ design Strategy 3 RF codes to validate calculations Consideration of machining and assembly possibilities.
RFQ Installation Status 10/27/2015 October 27, 2015 Jim Steimel & Curtis Baffes.
DISCUSSION OF THE ARCS AND OVERALL LATTICE INTEGRATION FCC meeting 8th of January 2015 Antoine Chance.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
1 & 2 JUNE 2015 – LLRF – BEAM DYNAMICS WORKSHOP URIOT Didier What is taken into account in simulations LLRF – Beam dynamics Workshop.
Adjustable tuner HENRY PRZYBILSKI / PIERRE-ALAIN LEROY.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
CONTROLS OF ESS EMU Jean-François DENIS / Tom JOANNEM.
DTL F.Grespan – A.Pisent – P.Mereu – M.Poggi-M.Comunian-R.De Prisco LNL– 05/05/2014F. Grespan.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
LCWS11 WG4 Fully featured accelerating structure engineering design
Bruno POTTIN, Anne-Catherine CHAUVEAU
RF cell Anders Sunesson RF group leader
Sub-system integration for the VBOX
Medium beta cryomodule demonstrator M-ECCTD
An X-band system for phase space linearisation on CLARA
Functional interfaces
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
12 GHz High Power RF components requirements for CEA activities
XFEL Tuner system non-conformities Detected At saclay
SNS PPU Cryomodule Instrumentation
RF systems introduction
ISRC and LEBT Vacuum System Design
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL main evolutions between M-ECCTD and serie - Bonjour, Franck Peauger, Je.
LEBT water cooling system
Identification and marking of ESSI deliverables
Cryomodule Product Breakdown Structure and configuration traceability
System tests at CEA O. Piquet 19/03/2019
WP16 Water cooling systems
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND.
RF introduction Anders Sunesson RF group leader
Vacuum System Design for the Target Monolith System
Presentation transcript:

ESS RFQ INTERFACES | Didier CHIRPAZ-CERBAT CEA-ESS INTERFACES

Preliminary Version SOMMAIRE ESS RFQ General Views03 Interfaces with Vacuum Equipment06 Interfaces with LEBT and MEBT10 Interfaces with RF equipment13 Interfaces with Alignment19 Interfaces with Cooling System21 | PAGE 2 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015

ESS RFQ GENERAL VIEWS | PAGE 3 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015

Preliminary Version ESS RFQ GENERAL VIEWS | PAGE 4 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 NOT THE FINAL DESIGN Pumping group Tuner Coupler Hydraulic plate

Preliminary Version ESS RFQ GENERAL VIEWS | PAGE 5 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 Tuner x60 Coupler x2 Pumping system x10 Pick up x22 Fiducials x30 (not represented here) Cooling connector x80

INTERFACES WITH VACUUM EQUIPMENT | PAGE 6 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015

Preliminary Version VACUUM INTERFACES | PAGE 7 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 Vac1 Vac2 Vac3 RF Power Coupler IDCEAESSTypeQuantity Vac1CF100 ValveTurbo PumpCF10010 Vac2TeeGaugeCF402 Vac3T on couplerGaugeCF402 Vac4AdaptatorRGACF401 CEA decided to put valves between RFQ and turbo pump: -security (RFQ protection) -maintenance time (no RFQ reconditioning) -others RFQ feedback Vac4

Preliminary Version | PAGE 8 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 RFQ VACUUM DIAGRAM

Preliminary Version Every vacuum equipment is provided by ESS, only DN100CF valves are provided by CEA VACUUM INTERFACES | PAGE 9 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 Equipment listQuantityProvider Turbo Pump10ESS Dry Pump4ESS CC Gauge4 + 10ESS Pirani Gauge7ESS DN100CF Valve10CEA DN40CF Valve1ESS Primary Valve KF19ESS Manifold2ESS CF 100 SealsESS CF 40 SealsESS Viton SealsESS Mechanical Vacuum equipment integration on the RFQ has been done with the most constraint case: gauge on valve

INTERFACES WITH LEBT AND MEBT | PAGE 10 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015

Preliminary Version LEBT INTERFACES | PAGE 11 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 L1 Entrance Plate LEBT (ACCT+repelling electrodes+cone…) RFQ flange IDCEAESSType L1Entrance PlateLEBT coneTBD Equipment listQuantityProvider ACCT1ESS Repelling Electrodes1ESS Cone1ESS Entrance Plate1CEA Interface with LEBT still in progress No impact on call of tender

Preliminary Version MEBT INTERFACES | PAGE 12 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 Equipment listQuantityProvider Exit Plate1CEA Valve DN40CF1ESS ACCT1ESS M1 Exit Plate MEBT (ACCT, …) RFQ flange DN40 CF Valve: in the CEA scope, provided by ESS and supported by CEA RFQ support M2 IDCEAESSType M1Exit PlateESS ValveCF40 M2ESS ValveMEBTCF40

INTERFACES WITH RF EQUIPMENT | PAGE 13 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015

Preliminary Version RF INTERFACES – RF ON RFQ | PAGE 14 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 IDCEAESSTypeQty RF1 Pick up (female) Cable N (male) N22 CEA provide pick up/female N- connector and before, ESS provide male N-connector/cable and after RF1 Pick up position for field monitoring / Pick up position for LLRF Pick upz (m)Quantity Field Monitoring LLRF (1 is spare)

Preliminary Version RF INTERFACES – RF ON COUPLER AND LOAD | PAGE 15 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 IDCEAESSTypeQty RF2Pick up e- Cable N (male) N2 RF3WindowCable Optic Fiber ? 4 RF6Pick up Cable N (male) N2 RF2 RF3 Coupler Window Cable (Optic Fiber?) PM x2 per coupler Coupler (draft) Windows CEA stops at the windows. In case of optic fiber, CEA can provide an SMA connector for the windows

Preliminary Version RF INTERFACES – RF DISTRIBUTION | PAGE 16 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 IDCEAESSTypeQty RF4Pick upCable N (male)N4 RF5Waveguide WR2300 FH2 RF6Pick upCable N (male)N2 RF4 and RF6 Waveguide path v8 from CEA Transition (with SMS connector) Reflectometer Coupler (RF4) RF5 Flexible waveguide Reflectometer Coupler Load Reflectometer coupler (RF6)

Preliminary Version RF INTERFACES – RF TUNING | PAGE 17 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 RFQ envelope Bead Pull Envelope 1 m CEA needs 1m free before and after RFQ to do RF Tuning, at the final RFQ position, just before the RFQ conditioning BP1 IDCEAESSTypeQty BP1 Bead Pull equipment LEBT- MEBT 1 m free space 2

Preliminary Version RF INTERFACES | PAGE 18 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 Equipment listQuantityProvider RF Power Coupler2CEA Arc Detector on coupler4ESS (Optic Fiber)(4)ESS Electron Pick up2CEA T reducer2CEA SMS Connector4CEA Transition2CEA Reflectometer coupler2CEA Flexible Waveguide2CEA RF Power Divider1CEA Load1CEA Arc Detector on Load1 TBCESS TBC Reflectometer coupler on Load1CEA Waveguide support1CEA Waveguide to RF Power Divider (not inclued) xESS

INTERFACES FOR ALIGNMENT | PAGE 19 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015

Preliminary Version ALIGNMENT INTERFACES | PAGE 20 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 IDCEAESSTypeQty A1Alignment PlateFiducial’s support6 mm aperture20 A2Flange or plateFiducial’s support6 mm aperture10 A1 A2 Equipment listQuantityProvider Alignment Plate10CEA Fiducial’s support6ESS Fiducial3ESS Plate or Flange aperture5-10CEA Alignment Plate (artistic view)

INTERFACES FOR COOLING SYSTEM | PAGE 21 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015

Preliminary Version COOLING SYSTEM INTERFACES | PAGE 22 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 Flow meters and valves provided by CEA, will be documented later ESS Gallery CEA SKID ESS Primary Loop Water Manifold RFQ Couplers Tuners C1 C2 C3 C4 CEAESSCEA ESS Water circulation for cooling, provided by ESS IDCEAESSTypeQty C1 Water manifold Hard Cooling Pipe from SKID Welded8 C2SKID Hard Cooling Pipe from SKID Welded8 C3SKID Primary ESS Loop Welded C4LoadESS

Preliminary Version COOLING SYSTEM INTERFACES | PAGE 23 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 Equipment listQuantityProvider SKID1CEA Cooling connectorsxCEA Water manifoldxCEA Pipe from Water manifold to RFQ xCEA Flow LimiterTBD CEA-ESS TBD ValveTBD Flow MeterTBD Pipe from SKID to Water manifold x

DSM Irfu Commissariat à l’énergie atomique et aux énergies alternatives Centre de Saclay | Gif-sur-Yvette Cedex T. +33 (0) xx xx | F. +33 (0) Etablissement public à caractère industriel et commercial | RCS Paris B | PAGE 24 Didier CHIRPAZ-CERBAT | ESS RFQ Interfaces - CDR 2 | 8-9 December 2015 Thank you for your attention ! Questions ?