Attempting to Cost Estimate the nEDM Upper Cryostat Larry Bartoszek, PE Bartoszek Engineering 12/2/04.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
EDM Collaboration Meeting, October 5-7, 2006 Valve R&D Steve Williamson UIUC.
Project Summary. Mission Statement To develop a Volumetric Flow Sensor to measure the volume of gas flowing through a quadrant and into the combustion.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
A6: Team Rallye Potable Water Still Presented by: Entire Group September 28, 2006 Eric Sabelhaus Nicole Del Rey Mike McConnellTim Rodts.
Scintillating Fiber, Ribbon Production, Cryo Update Alan Bross MICE Tracker Meeting IC November 8, 2006.
By: Leonardo Medina Period: 5. What career I want to do?  I want to become a mechanical engineering.
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
RF Cavity / Coupling Coil Module
Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
NEDM Collaboration Meeting, May 25-26, He Relaxation Steve Williamson UIUC.
NEDM Construction Project Cost & Schedule Philosophy Vince Cianciolo, ORNL Physics Division Internal Cost & Schedule Review 02/11/2005.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
EDM Magnetic Shielding (WBS 5) and Magnets (WBS 6) B. Filippone and B. Plaster Caltech Internal Cost and Schedule Review February 11, 2004.
G-2 Cryogenic System. Maintenance Items Readily defendable Refurbish expansion engine Cost basis – previous expansion engine refurbishment Spare parts.
Muon Acceleration Program Technology Development A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009 It is not a Project!
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
EDMEDM EDM Fast Start, May 23, 2006He3S, Steven Williamson EDM Fast Start Helium-3 Services (He3S) Steven Williamson May 23, 2006.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
EDMEDM EDM Collaboration Meeting 3-06 Jan Boissevain, P-25 March 2, 2006 NCSU EDM Experiment Design Status.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Plumbing and Gas, for better optical cryostats Warren Johnson LSU.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
The MesoMill™ An Off-The-Shelf Small Milling Machine By Roger Cortesi MIT Precision Engineering Research Group.
EDM Engineering Issues General Mechanical Considerations EDM Cryostat Plan D ANSYS EMAG Calculations ANSYS MECH Calculations 3 June ‘03 J. Boissevain.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Summary of Valve Design Status for nEDM L. Bartoszek BARTOSZEK ENGINEERING 6/20/05.
NEDM Collaboration Meeting 5/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
NEDM Collaboration Meeting, May 19, 2008 Valve Progress Steve Williamson.
NEDM Collaboration Meeting, November 1-3, 2007 Valve Progress Steve Williamson, UIUC.
Status of the HV Test System Purposes of the HV test system Design and assembly progress Vacuum enclosure Projected assembly and test milestones (short-term)
EDMEDM EDM Collaboration Meeting 6-05 Jan Boissevain, P-25 June 20, 2005, Los Alamos National Laboratory EDM Reference Design.
WBS 6: Magnetic Shielding B. Filippone and B. Plaster Caltech December 3, 2004.
CLIC DETECTOR PAC RING SHIELDING CONCEPT Jerome Axensalva BE/OP16/12/2011 MDI meeting1.
Status of Engineering Preparations for CD2/3A nEDM Collaboration Meeting – MIT Bates Jan Boissevain November 2, 2007.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
DOE DP This work was performed under the auspices of the U. S. Department of Energy by the Los Alamos National Laboratory under contract No. W-7405-Eng-36.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
SVD Ribs and SLM M.Friedl, F.Buchsteiner, R.Thalmeier (HEPHY Vienna) 27 May 2014.
MICE Coupling Coil Test Proposal Ruben Carcagno Fermilab July 9, MICE CC Test Proposal7/11/2011.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
NEDM Cost and Schedule Review, February 11, 2005 Upper Cryostat and Valves Cost and Schedule for WBS 3.2, 3.3, 3.4, and 8.2 L. M. Bartoszek D. H. Beck.
Cryovessel Engineering David Haase, Jan Boissevain, Ernie Ihloff WBS long lead time items Cryovessel Dilution Refrigerator Helium Liquefier.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Crab Cavity Technical Coordination meeting:
Teleconf ACS – FREIA 28th March 2017
Design of the Injection Can
Update on He3 Services design since the ORNL meeting
Teleconference ACS – FREIA 18th April 2017
LARP Vertical Test Facility
Isotropic View Conceptual Design for MONALISA setup at CERN Magnet
Experimental equipment Edgar L. Black February 17, 2019
Detailed Design Review Solar Thermal Water Heater
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

Attempting to Cost Estimate the nEDM Upper Cryostat Larry Bartoszek, PE Bartoszek Engineering 12/2/04

What’s the Goal? How accurate does the cost estimate need to be? Factor of 2? Factor of 5??? (Too much, right?) I don’t have good numbers because there are still too many unknowns. (I don’t even have bad numbers yet!) Large changes are being discussed up to this minute.

Ranges of Uncertainty The DOE uses the following contingencies for different types of estimates: Quote in hand for off-the-shelf item: 10% Engineering estimate: 15-25% Engineering estimates are also broken down by technical and schedule risks To call it an “engineering” estimate assumes that the item has been engineered High technical risk items can have contingencies of 50% or higher Is there anything in this apparatus that isn’t technically risky?

Status of current design nEDM is still very conceptual I think it would be a miracle if the latest numbers achieve a cost estimate accurate to 50%. Large uncertainties are in manufacturing processes associated with non-standard components For one small example, UCN-friendly superfluid-tight He valves operating at.3K, non-superconducting and actuated by LHe cylinders

Hidden costs: The large fiberglass structures will require custom tooling that must be included in the cost These will be very labor intensive and may not be fabricate-able by technicians at universities Some may need vacuum fixturing Temporary fixturing for assembly I would budget for a large FEA effort to verify the heat leak budget—similar to efforts we did for G0

Status Cont’d Jan’s model is exactly what we need to decide major features and carve out volumes We must not be fooled by the apparent level of detail of the model It is still a conceptual design, not a preliminary design “Thousands” of parts are still to be designed in (lots of fasteners) Many open issues on assembly, tool clearances, temporary supports, plumbing connections, etc…

What is the Upper Cryostat? Jan and I talked about whether the magnetic shielding of the main cryostat needed to extend all the way around the upper cryostat I got the impression from Doug that it did Jan is hoping it does not The interface vessel right under the Upper Cryostat is a no-man’s land that could reasonably be considered part of the Upper Cryostat Is spin preserved in an unshielded volume?

Upper Cryostat? This picture “stolen” from Jan Boissevain

Valve details The valves could be a major source of heat leak because they look like heat exchangers The actuator may be a custom LHe I piston and cylinder operating at 4K The valve flow path must be at ~.3K Is the plumbing acrylic? Stainless? Does stainless have a Tc? If plastic, is it epoxied for seals?

I know this is a conceptual image but: 1)A hydroform bellows will never last in fatigue 2)The dead volume is the heat exchanger This space fills with.3K He

Some other observations The following pictures and text were borrowed from Jan’s presentation My questions are added

4°K Shield Lead Super Conducting Shield Ferro-magnetic Shield Ferro-magnetic Shield Form Cosθ Coil Form How are these shells fabricated? What is the ferro-magnetic shield made of? (If iron, isn’t it too brittle at <4K?) How are CTE’s matched? How do you make corners like this? This picture “stolen” from Jan Boissevain

Ceramic Ball Contact mechanics calculates the size of the circular areas the ball makes in contact with the groove. The weight will cause the ball to impress dents in the flats that will increase thermal conductivity. Definitely an area to FEA for heat leak.

Conclusion I can’t cost estimate what I can’t see Is there any way we can focus more on the design so that we can get a reasonable cost when we have a more complete design?