Device Interface Board for Wireless LAN Testing Team May 06-15 Client ECpE Department Faculty Advisor Dr. Weber Team Members Matthew Dahms – EE Justine.

Slides:



Advertisements
Similar presentations
Chapter 2Test Specification Process. n Device Specification Sheet – Purpose n Design Specification – Determine functionality of design n Test List Generation.
Advertisements

Fundamentals of Data & Signals (Part II) School of Business Eastern Illinois University © Abdou Illia, Spring 2015 (February18, 2015)
Abstract A pacemaker helps to control one of the most critical organs of the human body, the heart. Due to the level of importance of the pacemaker’s correct.
Embedded DSP Spectrum Analyzer May 0104 April 25, 2001 Teradyne Corp Julie Dickerson Bill Black Prihamdhani AmranEE Ryan ButlerCprE Aaron DelaneyEE Nicky.
Team 7 / May 24, 2006 Web Based Automation & Security Client Capstone Design Advisor Prof. David Bourner Team Members Lloyd Emokpae (team Lead) Vikash.
Prof. John Nestor ECE Department Lafayette College Easton, Pennsylvania ECE Senior Design I Lecture 11 - Data Communications.
Chapter 2: Fundamentals of Data and Signals. 2 Objectives After reading this chapter, you should be able to: Distinguish between data and signals, and.
MULTIPURPOSE DIGITAL CDMA FM REMOTE CONTROLLER FIRDOUS KAMAL MIZAN MIAH EE – 513 4/19/2005 COMMUNICATION ELECTRONICS.
4/28/2004Optical Tape Measure Optical Tape Measure May Team Members: Faculty Advisors: Nick Freese (EE) Dr. Aleksander Dogandzic Bruce Fu (EE) Dr.
IT-101 Section 001 Lecture #15 Introduction to Information Technology.
Precision Variable Frequency Drive Group May07-13 Jason Kilzer Nick Nation Dave Reinhardt Matt Shriver Client: Jim Walker Faculty Advisor: Professor Ajjarapu.
Precision Variable Frequency Drive May Client: Jim Walker Advisor: Dr. Ajjarapu Team Members: Matt Shriver Jason Kilzer Nick Nation Dave Reinhardt.
Inventory Control in Stores Dec05-09 Team: Jeff Benson Frederick Brown Christopher Reed Brian Wagner Date: December 6, 2005 Client: ISU Senior Design Program.
WCBI Team Information Team number: Client: Faculty Advisors: Technical Advisors: Team Members: May02-11 Square D Company (Greg Wiese) Glenn Hillesland.
PIC Evaluation/ Development Board Dec02-12 December 10, 2002 Client: ECpE Department Faculty Advisors: Dr. Rover, Dr. Weber Chad Berg, Luke Bishop, Tyson.
Figure 1 Personal Efforts Estimated Resources Financial Budget and Other Resources Table 1 Project Requirements Design Objective Concise, non-intimidating,
Communication Device for Handicapped Kids Dec Client Heartland Area Agency Sue Young Advisor Yao Ma Advisor Yao Ma Alex Leith Brian Grove Steve Peters.
Anthony Gaught Advisors: Dr. In Soo Ahn and Dr. Yufeng Lu Department of Electrical and Computer Engineering Bradley University, Peoria, Illinois May 7,
Bi-Directional RF Data Communication A Robot Control Device Team BDRFC.
Computer-Based Trading Room Dec04-05 Client: ISU College of Business Advisor: Dr. Gerald B. Sheblé Team Members Steve Saillard Vipul Tiwari Dan Fitch Fahim.
Team May Client ECpE Department
Project: May Project Team Members: Edward McDowell, EE Richard Mott, EE / Econ Faculty Advisors: Dr. John.
Phase-Locked Loop Design S emiconducto r S imulation L aboratory Phase-locked loops: Building blocks in receivers and other communication electronics Main.
Expanded “Cookbook” Instructions for the Teradyne Integra J750 Test System Team May Client ECpE Department Faculty Advisor Dr. Weber Team Members.
CS 640: Introduction to Computer Networks Aditya Akella Lecture 5 - Encoding and Data Link Basics.
Device Interface Board for Wireless LAN Testing Team May Client ECpE Department Faculty Advisor Dr. Weber Team Members Matthew Dahms – EE Justine.
Slide: 1International Conference on Electronics, Circuits, and Systems 2010 Department of Electrical and Computer Engineering University of New Mexico.
Abstract Other Resources Financial Resources Project Schedule Personnel Efforts Item DescriptionCost STK300 Microcontrollerdonated (Kanda) GM28 Cellular.
Optical Encoder for a Game Steering Wheel May Team members Sam DahlkeCpr E Peter FecteauCpr E Dan PatesEE Lorenzo SubidoEE Advisors Dr. James Davis.
Pump Controller Team Number: May06-12 Team Members Dwayne Stammer CprE Francois Munyakazi EE Dan Paulsen CprE/EE Faculity Advisor Nicola Elia Client Viking.
Project OSCAR Octagonal Speech-Controlled Autonomous Robot ONGO-01.
Radio-Controlled Duck Decoy May April 30 th, 2003 Team Members: Faculty Advisors: Jason Freerksen Prof. Robert Weber Kooi-Tjek Lau Prof. Clive Woods.
Alternative Lower Cost Hearing Aid Dec03-10 Client: Herb Harmison Advisor: Edwin Jones Jr. Team Members: Hassan Qureshi Hamdan Al-Mehrezi Trong Do Nathan.
Abstract Evidence can be the key to convicting someone of a crime, or acquitting a person of charges brought against them. To make sure the evidence is.
Abstract Previous senior design teams developed an amplifier board for Teradyne Corporation. This board will boost the input signal to a computer-based.
May05-36: Boone Cemetery Management Software Boone Cemetery Management Software May05-36 Greg Thede, Director, Boone Parks Department Dr. Kothari Joseph.
Educational Laboratory Virtual Instrumentation Suite (ELVIS) May Client: National Instruments Advisors: Dr. Mani Mina, Dr. Diane Rover Group Members:
Senior Design Laboratory Design Dec 05-01
Defining Procedures for Decision Analysis May & Engr A April 30, 2002 Client & Faculty Advisors –Dr. Keith Adams –Dr. John Lamont –Dr. Ralph.
Mixed-Signal Option for the Teradyne Integra J750 Test System May08-12 Emily Evers Vincent Tai.
Design Objectives The design should fulfill the functional requirements listed below Functional Requirements Hardware design – able to calculate transforms.
Network Enabled Wearable Sensors The Combined Research Curriculum Development (CRCD) project works with the Virtual Reality Applications Center (VRAC)
Device Interface Board for Wireless LAN Testing Team May Client ECpE Department Faculty Advisor Dr. Weber Team Members Matthew Dahms – EE Justine.
ABSTRACT The purpose of this project is to develop an amplifier for Teradyne Corporation. The amplifier will take the input signal and amplify it without.
Abstract Evidence can be the key to convicting someone of a crime, or acquitting a person of charges brought against them. To make sure evidence is carefully.
High-Performance FPGA-Controlled Amplifier Phase IV May April 27 th, 2005.
Floyd, Digital Fundamentals, 10 th ed Digital Fundamentals Tenth Edition Floyd © 2008 Pearson Education Chapter 1.
Soil Moisture Radar – Ongo-02d ABSTRACT During times of increased flood problems, soil moisture becomes a paramount concern among geologists due to the.
Optical Encoder for a Game Steering Wheel May05-26 Client: Thomas Enterprises Advisors: Dr. James Davis Dr. Douglas Jacobson Team Members: Sam Dahlke,
Introduction ProjectRequirements Project Requirements In a previous senior design project, a wireless front-end was added to Iowa State University’s Teradyne.
Mixed-Signal Option for the Teradyne Integra J750 Test System
Device Interface Board for Wireless LAN Testing
Abstract Due to a change in demand, high voltage transmission circuits can become overloaded. Overloads are resolved by the dispatch of power based on.
HardSSH Cryptographic Hardware Key Team May07-20: Steven Schulteis (Cpr E) Joseph Sloan (EE, Cpr E, Com S) Michael Ekstrand (Cpr E) Taylor Schreck (Cpr.
May FPGA Controlled Amplifier Module (FCAM) December 8, 2005.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
PC Based Spectrum Analyzer April 29, 2003 May03-10 Faculty Advisor: Dr. DJ Chen Michael Cain Paul Heil Eric Rasmussen Aung Thuya Client: Teradyne Inc.
OSCAR Octagonal Speech Controlled Autonomous Robot Team Ongo01 Motion Control & End Effector Frerichs, Matt – EE Moudin, Alex – ME Shedek, Tom – ME Wajid,
Abstract The purpose of this project is to design a high-performance FPGA-controlled amplifier for Teradyne Corporation. This will constitute Phase IV.
ELVIS Educational Laboratory Virtual Instrumentation Suite: Phase II Abstract Problem Statement The goal of this project is to convert the EE 201 labs.
Project May07-14: Restaurant Automation April 24, 2007.
Device Interface Board for Wireless LAN Testing Team May Client ECpE Department Faculty Advisor Dr. Weber Team Members Nathan Gibbs – EE Adnan Kapadia.
Fall 2006P7305: Freshman Practicum AM Receiver P7305: Learning Module for EE Freshman Practicum Chris Urban: Lead Engineer Hans-Christian Rotmann: Project.
Garage Parking Indicator
Fundamentals of Data & Signals (Part II)
Digital Fundamentals Floyd Chapter 1 Tenth Edition
BASE BAND DECODER Project Team Gurrampati Venkatakrishna Reddy
Lecture 2: Line Encoding 1nd semester By: Adal ALashban.
FPGA Controlled Amplifier Module May 06-14
Data Transmission And Digital Communication
Presentation transcript:

Device Interface Board for Wireless LAN Testing Team May Client ECpE Department Faculty Advisor Dr. Weber Team Members Matthew Dahms – EE Justine Skibbe – EE Joseph Chongo – EE February 9, 2006

Presentation Outline Project Overview  Introduction  Problem Statement  Operating Environment  Intended Users & Uses  Assumptions and Limitations  End-Product Description Project Activities  Previous Accomplishments  Technology Considerations  Present Accomplishments  Planned Activities Resources & Schedule  Estimated Resources  Schedules Closure Materials  Additional Work  Lessons Learned  Risk & Management  Closing Summary Figure 1: Teradyne Lab Entrance

Definitions ASK modulation – Amplitude shift keying. In this modulation scheme the amplitude is varied to indicate logic 0’s and 1’s DUT – Device under test (positive edge D flip-flop) FPGA – Field programmable gate array. Used to test the DUT after receiving signals from the Teradyne tester Header – Preamble bits sent prior to the sending of information in a data packet time D3 D2 D1 D0 Data Packet Header voltage Figure 2: Data Packet and Header

Definitions (cont.) NRZ – Non-return to zero. Using NRZ, a logic 1 bit is sent as a high value and a logic 0 bit is sent as a low value. PLL – Phase-locked loop RZ – Return to zero. This is the opposite of NRZ data. The signal state is determined by the voltage during the first half of each data binary digit. The signal returns to a resting state (called zero) during the second half of each bit. Teradyne Integra J750 – Tester donated to Iowa State University by Teradyne. It is used in the testing of printed circuit boards and integrated circuits.

Project Overview

Acknowledgement Dr. Weber Nathaniel Gibbs Jason Boyd

Project Overview Problem Statement  In Fall 2004, ISU’s ECE Department introduced a senior design project with the goal of developing a wireless interface capable of receiving test signals and transmitting results to the department’s Teradyne Integra J750 tester.  For this project, the goal is to modify the current setup so that the wireless interface shall be capable of recovering a clock signal transmitted by the Teradyne system. Figure 3: Teradyne Integra J750

Project Overview Assumptions  A sufficient clock-training signal can be sent by the Teradyne J750 over the S/R network to initialize the clock recovering circuitry.  The clock recovering circuitry will be able to interact with the existing FPGA.  The current wireless communication network can transmit up to five feet. This assumption is based on the May05 team’s documentation.  The phase difference between the system clock of the Teradyne J750 and the recovered clock at the wireless interface will not be greater than the overall system clock frequency.

Project Overview Limitations  The Teradyne J750 is sensitive to temperature fluctuations and must operate within the calibrated temperature.  To avoid the loss of data, the maximum rate at which user can send data is at Kbps.  The existing transmitter and receiver communicate at MHz. Therefore, nearby wireless signals at similar frequencies may disrupt the setup.  The communication link shall be limited to one frequency.  Limited to using only one FPGA. Using two additional FPGA’s, it would be possible to encode/decode the clock and test data into a single data stream. Figure 4: Temperature Requirements

Project Overview Intended Users  The user has knowledge in electrical and/or computer engineering.  The user has previous experience testing circuits with the Teradyne J750. Intended Uses  Functional test of a digital device  (Future) Wireless chipset test

Project Overview End-Product and Other Deliverables  Wireless interface with clock recovery circuit  Demonstration of wireless test  Update the manual for wireless test operation Figure 5: Cover page of wireless manual

Project Activities

Previous Accomplishments May Accomplishments  Parallel-Serial Conversion  Transmitters and Receivers  Processing Device

Previous Accomplishments Parallel-Serial Conversion  Needed to convert parallel test data into serial test data  Chose to use a shift register Figure 6: Shift Register attached to daughterboard

Previous Accomplishments Transmitters and Receivers TRM1 TRM2 RCV1 RCV2 Figure 7: Tx/Rx PCBs

Previous Accomplishments FPGA  Used to recognize header signal  Identifies test data  Presents test data to DUT  Presents reply to S/R network Figure 8: FPGA

Figure 9: Final System Setup

Project Activities Project Definition  Part of the May 05 team’s project definition was to include a clock recovery circuit, but due to timing constraints was unable to do so.  May 06 goal is to integrate a PLL for clock recovery with the existing network.

Project Activities System Block Diagram Figure 10: Proposed final setup block diagram

Project Activities Technology Considerations  Manchester vs. PLL  NRZ to RZ Conversion

Technology Considerations Original SignalValue Sent Logic 00 to 1 (upward transition at bit centre) Logic 11 to 0 (downward transition at bit centre) The waveform for a Manchester encoded bit stream carrying the sequence of bits Manchester Encoding Figure 11: Graphical representation of Manchester encoding

Manchester Encoding  Very easy to implement  Clock phase and frequency are both present  Too fast for current transmitters and receivers! Technology Considerations

Phase Locked Loop  Must be “trained”  Test data must follow a training signal  More difficult to implement  Don’t have to build new transmitters and receivers

Project Activities Figure 12: Internal Components of a PLL

Project Activities Phase Detector  Type I – XOR  *Type II – Generates lead or lag pulses Voltage Controlled Oscillator (VCO)  Centered at KHz  Frequencies too far off of center frequency will not lock

Project Activities Figure 13: Internal PLL Schematic

Project Activities Monostable Multivibrators  Chosen to convert NRZ data to RZ data  Must use an external RC combination to specify pulse widths

Project Activities Figure 14: NRZ to RZ converter circuit with I/O waveforms

Project Activities Software  FPGA serves as “brains” of system  Verilog chosen by previous team to program FPGA  New prototype code complete

Project Activities Present Accomplishments Hardware Selected Previous team’s project setup and tested PLL Monostable Multivibrators Software Prototype control software for FPGA written IG-XL test template written

Project Activities Planned Design/Test Activities  Build and test NRZ to RZ converter  Build and test PLL circuitry  Put new circuitry on printed circuit board  Modify FPGA code as necessary  Test functional range of wireless interface

Resources & Schedule

Schedule  Expected  Original  Actual

Schedule (cont.)  Expected  Original  Actual

Personal Effort Personal Time Committment Personnel Problem Definition Tech Selection End- Product Design End- Product Prototype End- Product Testing End- Product Document End- Product Demo Project reporting Est. Total Matt Dahms 9*15* Joe Chongo 10*26* Srisarath Patneedi 13*10*55*** 78** Justine Skibbe 10*11* Total42*62* *Completed hours ** Left on Co-op

Previous Team Resources

Financial Resources (w/o labor) ItemTeam hoursOther HoursCost Printing of project poster12hrs0hrsDonated Teradyne Integra J750 Test System 0hrs Donated PLL Chip0hrs $1.93 Dual Monostable Multivibrator 0hrs $0.53 Supplementary (Res, Cap, etc.) 0hrs $10.00 Total0hrs $12.46

Financial Resources (w/ labor) ItemW/O LaborWith Labor Parts and Materials: a. Printing of project posterDonated b. Teradyne Integra J750 Test SystemDonated c. Clock Recovery Chip$1.93 d. Dual Monostable Multivib$0.53 e. Supplementary (Res, Cap, etc.)$10.00 Labor at $12.00 per hour: a. Matthew Dahms$2,880 b. Joseph Chongo$3,024 c. Srisarath Patneedi$2,868 d. Justine Skibbe$2,928 Subtotal$11,700 Total$12.46$11,712.46

Closure Materials

Risk Management Risk: Losing Team Member  Management: All members keep detailed & organized notes Risk: Loss of Data  Management: All data will be backed up using team gmail account Risk: Parts Malfunction  Management: Meticulous care in ESD procedures (using ESD bands)

Closing Materials Lessons Learned  What technical knowledge was gained? FPGA implementation Teradyne Integra J750 usage Clock recovery methods System integration

Closing Materials Lessons Learned  What went well? May05 System still works! Teamwork Learned to work in arctic environments (19 degrees C inside Teradyne lab)  What did not go well? Locating May05 equipment Initial Teradyne J750 setup and test Uploading program to FPGA FPGA input pins

Closing Materials Closing Summary  Problem – Integrate clock recovery circuitry into current system  Solution Use PLL for clock recovery Modify FPGA program to incorporate new components

Questions? Questions???

Thank You