LIU-SPS Beam Dynamics WG E. Shaposhnikova LIU-SPS coordination meeting 9.12.2015.

Slides:



Advertisements
Similar presentations
LHC Injection in 07 “Summer MD-Planning” Milorad Popovic.
Advertisements

Helmholtz International Center for Oliver Boine-Frankenheim GSI mbH and TU Darmstadt/TEMF FAIR accelerator theory (FAIR-AT) division Helmholtz International.
Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Outcome from 2011 Chamonix workshop New structure of the SPSU Study Group E. Shaposhnikova /02/20111SPSU meeting.
Impedance of SPS travelling wave cavities (200 MHz) A. Grudiev, E. Métral, B. Salvant, E. Shaposhnikova, B. Spataro Acknowledgments: Erk Jensen, Eric Montesinos,
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
SciDAC Accelerator Simulation project: FNAL Booster modeling, status and plans Robert D. Ryne, P. Spentzouris.
Oliver Boine-FrankenheimSIS100-4: High current beam dynamics studies SIS 100 ‘high current’ design challenges o Beam loss in SIS 100 needs to be carefully.
Impedance aspects of Crab cavities R. Calaga, N. Mounet, B. Salvant, E. Shaposhnikova Many thanks to F. Galleazzi, E. Metral, A. Mc Pherson, C. Zannini.
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
Theoretical studies of IBS in the SPS F. Antoniou, H. Bartosik, T. Bohl, Y.Papaphilippou MSWG – LIU meeting, 1/10/2013.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
T. Argyropoulos, LIU /04/2013 Progress in the SPS: RF studies and beam quality T. Argyropoulos, T. Bohl, J. E. Muller,, H. Timko, E. Shaposhnikova.
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
Simulation of Beam Instabilities in SPring-8 T. Nakamura JASRI / SPring-8
Update of the SPS transverse impedance model Benoit for the impedance team.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
Shielding of the SPS Vacuum Flanges - Design Studies – Update Jose E. Varela and Jaime Perez 21 May 2015.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
Lessons from SPS studies in 2010 E. Shaposhnikova Chamonix’11 session 09: LHC injectors upgrade.
Improved electron cloud build-up simulations with PyECLOUD G. Iadarola (1),(2), G. Rumolo (1) (1) CERN, Geneva, Switzerland, (2) Università di Napoli “Federico.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Elias Métral, SPSU Study Group and Task Force on SPS Upgrade meeting, 25/03/2010 /311 TMCI Intensity Threshold for LHC Bunch(es) in the SPS u Executive.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
LIU-SPS upgrade, schedule, target parameters and observed limits 1 B. Goddard, E. Shaposhnikova for LIU-SPS coordination team SPS scrubbing review
RF/BR section 2014 highlights. RF/BR section in 2014 ARGYROPOULOS Theodoros BOHL Thomas BORGMANN Silke CALAGA Buchi Rama Rao CASPERS Friedhelm CHAPOCHNIKOVA.
Design of a one-stage bunch compressor for ILC PAL June Eun-San Kim.
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
Momentum slip-stacking of the nominal I-LHC beam in the SPS Particle simulations (preliminary) T. Argyropoulos, E. Shaposhnikova LIU-SPS BD WG 30/01/2014.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
Crab Cavities Failure Mode: Machine Protection Matrix Goals: Identify the most critical failure cases Design mitigation methods Make machine protection.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
Synchrotron frequency shift as a probe of the CERN SPS reactive impedance s HB2014 – 11/13/14 A. Lasheen, T. Argyropoulos, J. Esteban Müller, D. Quartullo,
LIU-PS Beam Dynamics Working Group Introduction and objectives
Loss of Landau damping for reactive impedance and a double RF system
Harmonic system for LHC
Harmonic system for LHC
Longitudinal impedance of the SPS
Session 5: Instability Modeling, Observations and Cures
Longitudinal beam parameters and stability
HOM power in FCC-ee cavities
A. Al-khateeb, O. Chorniy, R. Hasse, V. Kornilov, O. Boine-F
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Benchmarking the SPS transverse impedance model: headtail growth rates
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Upcoming longitudinal MDs
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
Beam dynamics requirements after LS2
Passive harmonic cavities for bunch shortening
Collective effects in the SPS and LHC (longitudinal plane)
CERN-SPS horizontal instability
CEPC SRF Parameters (100 km Main Ring)
Parameters Changed in New MEIC Design
Beam Beam effects for JLEIC
RF Parameters for New 2.2 km MEIC Design
Update on Crab Cavity Simulations for JLEIC
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

LIU-SPS Beam Dynamics WG E. Shaposhnikova LIU-SPS coordination meeting

General remarks During year - 9 meetings of the LIU-SPS BD WG + extra ones (isolated flanges, HOMs, …) Main topics: – SPS impedance and instabilities – MDs, space charge, e-cloud Main speakers: H. Bartosik, A. Lasheen, J. Varela Minutes taken by H. Bartosik Contributions to the LIU/HL-LHC Day Help from 2 summer students (~4 months) and 3 stagers (~7 months). Looking for schoolchildren for 2016

Achievements of 2015 Further improvement of the SPS impedance model (TW RF): – simulations and measurements in lab – HOMs in the 200 MHz and 800 MHz RF cavities – isolating flanges Impedance reduction of vacuum flanges: new LIU-SPS baseline Particle simulations and measurements of instabilities during ramp for single and multi-bunch beams. Benchmarking of the impedance model Simulation code BLonD: development & optimization Successful scrubbing – new baseline? Space charge and WP choice understanding Nonlinear optics studies First intensive studies of ion beam Ions: bunch length

Main challenges for 2016 MDs: – High intensity beams (limitations, losses, lifetime…) – 800 MHz RF system (phase and voltage control) – Monitoring of scrubbing, space charge and optics – Synchrotron frequency shift at various energies Simulations: – multi-bunch beam (72 bunches?) + phase-loop SPS impedance – Refinement of the model (1 Ohm inductance?) => search for new contributors – Follow-up of the impedance reduction (prototyping) – HOMs damping: design of the improved HOM couplers (factor 3-4) – end 2016 Studies for ions (2015 data analysis and new p-Pb LHC run): – Space charge, IBS and WP optimization – Slip stacking: simulations with realistic machine parameters, 800 MHz, bunch rotation A. Lasheen

Main challenges for 2016 MDs: – High intensity beams (limitations, losses, lifetime…) – 800 MHz RF system (phase and voltage control) – Monitoring of scrubbing, space charge and optics – Synchrotron frequency shift at various energies Simulations: – multi-bunch beam (72 bunches?) + phase-loop SPS impedance – Refinement of the model (1 Ohm inductance?) => search for new contributors – Follow-up of the impedance reduction (prototyping) – HOMs damping: design of the improved HOM couplers (factor 3-4) – end 2016 Studies for ions (2015 data analysis and new p-Pb LHC run): – Space charge, IBS and WP optimization – Slip stacking: simulations with realistic machine parameters, 800 MHz, bunch rotation A. Lasheen

Merry Christmas! Happy New Year!