Pavement Management in Developing Countries Christopher R. Bennett Senior Transport Specialist East Asia Transport Unit
2 Presentation Outline The World Bank’s interest in PMS Case Studies and Examples of PMS Projects –Data collection –System features –Applying the system
Why is the World Bank interested in PMS?
4 Transport and Development Transport sector is vital for economic & social development Roads constitute largest component of transport Roads require a balance of: –Maintenance (or preservation) –Development (or improvement)
5 World Bank’s Activities Since 1970’s the Bank has been working towards sufficient financing for road maintenance –Institutional strengthening –Financing of maintenance Produced the ‘Highway Development and Management Model’ (HDM) Conducted many projects to implement PMS in different countries Operate on wide range of roads
6 Expressway - China
7 Local Road - China
8 Provincial Road - Cambodia
9 Bridges Laos - Rural Road Cambodia: Main Highway Thailand-Siem Reap
10 Traffic Loading - Pakistan
11 Traffic Loading - Laos
Case Studies Data Collection
13 Data Collection Data are the foundation of any PMS First step of any PMS project is to define the network ‘structure’ and location referencing method Need to define data items and attributes: –Network structure –Inventory (pavement and structures) –Condition (pavement and structures) –Traffic volumes
14 Data Collection Most expensive component of any implementation (+70% of total costs) Data collection must be appropriate and sustainable Only collect: –The essential data –At the minimum level of detail –With the most appropriate technology given the agency’s constraints and capabilities Agency must have explicit data collection policies and procedures There must be strict data QA procedures
15 Network Level Data Calibration Data Performance StructureCondition RideDistressFriction IQL-5 IQL-4 IQL-3 IQL-2 IQL-1 System Performance Monitoring Planning and Performance Evaluation Programme Analysis or Detailed Planning Project Level or Detailed Programme Project Detail or Research HIGH LEVEL DATA LOW LEVEL DATA Data Detail Very Important
16 Roads Links (10-60km) Segments (1-5km) Attribute Data (varies) Node – Link Method Typically Used Location Referencing
17 No pre-defined network No previous data on inventory or condition Missing links / broken bridges Mines and unexploded ordinance (UXOs) within the right way Equipment breakdowns and difficulties getting spares Wildlife Banditry Weather Network Survey Challenges
18 All roads where 4-WD vehicle can pass some way or other Passable Roads - Cambodia
19 Impassible Roads - Cambodia
20 Cambodia Survey
21 Laos - Pilot Vehicle and Guards
22 Laos Survey
23 Cambodia Survey Equipment
24 Data Collected Location Referencing Roughness GPS Traffic & Speed Inventory Condition Cambodia ROMDAS System
25 Cambodia Survey – Impassible Roads
26 GPS Equipment in Backpack Video Camera on the Handle Motorcycle Survey Equipment
27 Cambodia: $600,000 for 11,000 km ($55/km) –Included procurement of equipment, vehicles, surveys Laos: $225,000 for 8,000 km ($28/km) –Surveys and map preparation New Zealand: $10-$15/km –Surveys only Comparative Costs
28 Data Processing Surveys result in a large amount of data Unless processing is done during survey significant delays –Contracts require data submission within 30 days of survey Quality assurance is challenging but essential –Philippines: some data returned 4 times to contractor for correction ALL projects have underestimated difficulties in data processing
29 Examples of GPS Data Processing Topological Corrections Correcting for incomplete survey Harmonizing different survey data
30 GPS Data Projection - NZ Aerial/Satellite photos and ground survey data can have different projections Wrong Projections Correct Projections
31 GPS Data Projection - Samoa
32 Final Network - Samoa
Case Studies Setting Up the System
34 Two Approaches Business Process Analysis –Determine the function and role of the PMS in the agency, required features System Design –Design the system around the institution’s capabilities Select and Adapt/Customize Existing Software Simple analyses Implement and provide ongoing support Select software before project starts or write new software Fit the agency’s activities into the software Adopt too intensive data collection Complex system and analyses Wrong (but typical) ApproachCorrect Approach
35 The Key to Success
36 Key RMS Components Basic RMS Asset inventory Asset accounting Maintenance management Contract management Resource management Inventory control Condition monitoring Advanced RMS Predictive modeling Risk assessment Treatment options and costs Lifecycle costing Works planning Optimized decision-making Interface data import/export What most countries needWhat most countries get
37 Tonga (1999)
38 Tonga - System Features Public Works Department had limited capacity Tonga IT industry very limited Adopted simple system –Access database –Generates output file of condition by road link –File imported to HDM-4 –Results mapped using MapInfo
39 Laos (2001)
40 Laos - System Features Ministry of Public Works had some capacity Some local IT industry Adopted simple system –Access database –Generates output file of condition by road link –File imported to HDM-4 –Results mapped using MapInfo Consultant required to annually return to run system
41 Samoa (2001)
42 Samoa - System Features Public Works Department had limited capacity Consultant set up initial system and conducted data collection Adopted moderately advanced system –HIMS for data storage and processing Roads, bridges and seawalls –Bridges and seawall prioritization done using HIMS –Road prioritization done using dTIMS –Results mapped using MapInfo and HIMS embedded GIS
43 Cambodia (2003)
44 Cambodia - System Features Public Works Department had some capacity Consultant set up initial system and conducted data collection Adopted moderately advanced system –HIMS for data storage and processing –Road prioritization done using HDM-4 –Results mapped using ArcView and HIMS embedded GIS Demo
45 Gujarat (2005)
46 Gujarat – System Features Roads and Bridges Department has some IT capacity Good local IT capacity Advanced system –SQL Server –Modules for all aspects of road management including environment
47 New Zealand (NOT a developing country!)
48 New Zealand – System Features Basic database and maintenance prioritization system established from early 1990s Implemented advance predictive modelling 1998 onwards Same systems used throughout the country by all authorities
49 New Zealand - Web-Mapping Demo
Case Studies Applying the System
51 Features Most PMS have common features –Reporting –Analysis modules Advanced features allow for prediction of forward works programmes and optimization under budget constraints –Useful for ‘what if’ scenario testing
52 Deterioration Prediction
53 Comparison of Options
54 Impact of Budget Constraint
55 Comparing Options for Road Section
56 Construction Programme
57 Works Program Cost
58 Predicted Future Condition
59 Treatment Costs
60 Condition Distribution by Budget
61 Backlog Length by Budget
The end