P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Advertisements

Fall 2014 EPICS Collaboration Meeting, Oct 2014, CEA Saclay, France © 2014, ITER Organization Page 1 Disclaimer: The views and opinions expressed.
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
ESS Test and Prototyping Activities Daniel Piso Ferńandez December 4, 2014.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
FUNDAÇÃO PARA A CIÊNCIA E TECNOLOGIA FCT Trainee Program Follow Up João Rodrigo Alvelos Ferreira | Started March 2013 October 2014 TE-VSC-ICM.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Berliner Elektronenspeicherringgesellschaft für Synchrotronstrahlung mbH (BESSY) Accelerator and Experiment Control and Monitor Systems Ralph Lange BESSY,
Control System and Software Engineering Process Elder Matias
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
Delta Motion Product – Motion System
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
FAIR Accelerator Controls Strategy
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
1LHC COOP, Uwe EPTING, CERN, ST/MO LHC - Technical Infrastructure Monitoring Uwe EPTING CERN, ST/MO.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Connecting LabVIEW to EPICS network
60kW Thermosiphon control system
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Instrument Control Systems Seminar 2014, 20 th -24 th October 2014 New Standards VLT Control System Mario Kiekebusch (On behalf everyone who took part.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Status report on ICS interfaces (Accelerator, Target, NSS, CF) and related activities Miha Reščič Deputy Project Manager, ICS
ESS Integrated Control System Software Core Components S.Gysin
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Mitigation Devices External Interface ICS Nick Levchenko Lund Date:
In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
Using COTS Hardware with EPICS Through LabVIEW – A Status Report EPICS Collaboration Meeting Fall 2011.
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Controls Software Developer - Summer workers The Machine Directorate at the European Spallation Source (ESS) in Lund, Sweden, invites applications for.
Cryoplant Controls Installation
SESAME Control System Status
Process Control System Requirements
Presented by Li Gang Accelerator Control Group
PLC-based control systems at SOLEIL - ICALEPCS 2017
XFEL Vacuum System Commissioning
Cryogenic C&C Scope of work
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
Process Monitoring and Control Systems
Plan for controls with the digital platform
Status of Control Services ICS WP10 (accelerator integration work package) Tuesday 20th November
PLCs integration into the ICS
ESS Main Control Room & ICS Infrastructure
MPS commissioning at ESS
Safety Readiness Review (SRR) Thomas Hansson, ESH
Readout Systems Update
Vacuum Control System for Monolith Vacuum
Project Migration / Management
ISrc & LEBT – ICS Installation Readiness Review
Presentation transcript:

Daniel Piso Fernández Some Ideas about Integration Support Cases and PLC Activities at Controls Division

Integration and PLC Activities Integration Support –Conventional Facilities –Vacuum Integration Test Facility –Ion Source & LEBT PLC Test Stand

Conventional Facilities Relevant milestones –Specification of controls for conventional facilities (end of Q4-2014) –First access to accelerator building. Test Stand building (Q3-2016) –Full access to accelerator building (end of Q ) –Target building ( Q2-2018)

Conventional Facilities (ii) Specification of controls for conventional facilities (end of Q )

Conventional Facilities (iii) CF/ICS INTERFACE

Conventional Facilities (iv) Integration sessions Information to capture for each system –Milestones of the design along 2014 (ICS/BMS) –Is the system PLC based or not? –Physical location of the CF system (ICS/BMS) –Where do we need to operate/interact with the system (ICS/BMS)? –What information/signals do we need to operate the CF system (ICS)? And for maintaining it (BMS)? –What information should be monitored for the CF system (ICS)? –What information should rise an alarm (ICS/BMS)? –What information/signals are important for ESS machine operation?(ICS)

Conventional Facilities (v) Integration sessions

Conventional Facilities (vi) Integration sessions SYSTEM NAME SYSTEM SCOPE PLC BASED? ICS INTERACTS WITH THE SYSTEM? BMS INTERACTS WITH THE SYSTEM? Milestones of the design along 2014 (ICS/BMS) Is the system PLC based or not? What information/signals do we need to operate the CF system (ICS)? And for maintenance(BMS)?

Conventional Facilities (vii) Integration sessions FRONT ENT BUILDINGTUNNELKLYSTRON GALLEYTEST STAND BUILDINGTARGET BUILDINGINSTRUMENT HALLCUBEXTERNAL SUPPLY BUILDING LOCATION 1 LOCATION 2 LOCATION 3 INTERFACE DEVICES AT LOCATION 1 INTERFACE DEVICE AT LOCATION 2 Physical location of the CF system (ICS/BMS) Where do we need to operate/interact with the system (ICS/BMS)?

Conventional Facilities (viii) Integration sessions FRONT ENT BUILDINGTUNNELKLYSTRON GALLEYTEST STAND BUILDINGTARGET BUILDINGINSTRUMENT HALLCUBEXTERNAL SUPPLY BUILDING MAINTAINANCE SCREEN AT LOCATION 1 MAINTAINANCE SCREEN LOCATION 2 INFORMATION TO OPERATE THE SYSTEM AT LOCATION 1 (ICS) INFORMATION TO OPERATE THE SYSTEM AT LOCATION 2 (ICS) INFORMATION FOR MAINTAINANCE AT LOCATION 1 (BMS) INFORMATION FOR MAINTAINANCE AT LOCATION 2 (BMS) What information/signals do we need to operate the CF system (ICS)? And for maintaining it (BMS)?

Conventional Facilities (ix) Integration sessions FRONT ENT BUILDINGTUNNELKLYSTRON GALLEYTEST STAND BUILDINGTARGET BUILDINGINSTRUMENT HALLCUBEXTERNAL SUPPLY BUILDING INFORMATION FOR MONITORING THE SYSTEM AT LOCATION 1 (ICS) INFORMATION TO OPERATE THE SYSTEM AT LOCATION 2 (ICS) INFORMATION FOR MONITORING AT LOCATION 1 (BMS) INFORMATION FOR MONITORING AT LOCATION 2 (BMS) INFORMATION FOR ALARMS THE SYSTEM AT LOCATION 1 (ICS) INFORMATION FOR ALARMS THE SYSTEM AT LOCATION 2 (ICS) What information/signals do we need to operate the CF system (ICS)? And for maintaining it (BMS)? What information should be monitored for the CF system (ICS)? What information should rise an alarm (ICS/BMS)? What information/signals are important for ESS machine operation?(ICS)

Conventional Facilities (x) Integration sessions Device IDLocationICSBMS Final list of interface devices

Conventional Facilities (xi) Integration sessions ESS Signal NameCF NameDevice IDICS (R/W)BMS (R/W)Signal TypeRange Sampling Rate Process ViewOperation in ViewComments Final list of signals

Conventional Facilities (xii) Integration sessions Information used for: Requirements for hardware, screens, etc. Interface design document

Vacuum Integration Test Facility Relevant milestones –Vacuum Test Stand Control System design (Q3-2014) –Vacuum Test Stand ready for operation (Q4-2014)

Vacuum Integration Test Facility(ii)

Ion Source & LEBT Relevant milestones Ion Source –Ion Source Assembly (starts Q4-2014) –Test Ion Source (starts Q2-2015) Relevant milestones LEBT –LEBT Technical Design Phase (starts Q1-2014) –LEBT Procurement (starts Q4-2014) –LEBT assembly (starts Q4-2015) –Test Ion Source & LEBT (starts Q2-2016)

Ion Source Collecting information for: Identifying control requirements Writing a design document Trying to share acquisition

Ion Source & LEBT (ii) *Already capturing requirements and starting a Design Document

PLC Test Stand PLC test stand first version ready (Q2-2014)

PLC Test Stand (ii)

PLC Test Stand (iii) Hardware SpecificationsCOMMENT Siemens PLC HardwareDone Rack, Power supply, Ethernet switches, otherDone IOCDone Development PCDone Learning Protocols PLC IOC Modbus TCP/IPEPICS-PLC-profibus-modbus-s7plc-report.doc (Section 3) ProfiBus – documentation of the current stateEPICS-PLC-profibus-modbus-s7plc-report.doc (Section 2) ProfiNet -documentation of the current statePLC-protocols-Profinet.docx ITER Siemens driver Instructions for a simple IOC example: EPICS-Tools-modbus- s7plc-SDDs7plc-casestudy.doc Device support for Modbus Instructions how to configure Modbus EPICS driver: EPICS- Tools-modbus-s7plc-SDDs7plc-casestudy.doc (Section 3) Device support for Siemens direct driver Instructions how to configure EPICS driver: EPICS-Tools- modbus-s7plc-SDDs7plc-casestudy.doc (Section 4) Control System Simulation PLC and SimulinkMatlab-PLC-connection.doc BeckhoffDecided to test Beckhoff solution:. Matlab-PLC-connection.doc

PLC Test Stand (iii) General Tasks Hardware selection and procurement Non-PLC hardware procurement Timing and Event Correlation Connect NTP Server with ESS Timing infrastructure to synchronize PLCs Desing an experiment (using triggers) to test how well we can correlate information from different events Distribution of triggers to PLCs and data on demand Cryogenics Controls Setup a cryogenics controls technical group Testing functionality of ITER Framework Testing functionality of UNICOS Testing cryogenics libraries from CERN EPICS support for Profibus DP Have a clear picture on collaborations between institutions on this field Having a decision about which framework to use by the end of this year Vacuum Test Stand Identify requirements Coding EPICS integration+GUI+Alarms+Archiving New technologies & Simulation Explore solutions to use Simulink for system simulation Simba Box Siemens FPGA module EPICS Integration Control Configuration Database Device Configuration Database Cabling database and Naming Conventional Facilities BACnet MPS & PSS Motion Control Draft of activities for 2014

Thank you!