05/12/2011O. Napoly1 TESLA Technology Collaboration Beijing, 5-8 December 2011 O.Napoly, CEA-Saclay TTC Chairman Introduction and update since last meeting.

Slides:



Advertisements
Similar presentations
ILC Global Design Effort 1 ILC SCRF (WG2) program GDE Status Debriefing Hitoshi Hayano 2008/2/25.
Advertisements

SIXTH MEETING OF THE ILC PROJECT ADVISORY COMMITTEE (PAC) 19/20 May 2011; Institute of Physics, Academia Sinica, Taipei, Taiwan 1.
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Katie Yurkewicz April 2013 InterAction Collaboration Business Meeting.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
Rong-Li Geng Jefferson Lab High Efficiency High Gradient Cavities - Toward Cutting Down ILC Dynamic Heat Load by Factor of Four R.L. Geng, ALCW2015,
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
ILC-BAW1 ML Accelerator Operational Gradient Introduction Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK,
Report of Visiting PKU, Tsinghua U. IHEP Dec. 9 and 10, 2009 Kaoru Yokoya, Marc Ross, and Akira Yamamoto Report to ILC-EC, Dec. 11, 2008.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
SCRF Parallel Sessions at TILC09 GDE 活動報告 3月30日(月)10時~ 3号館7階会議 室 設楽 哲夫.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
The Third IHEP-KEK 1.3GHz SRF Technology Collaboration Meeting J.Gao IHEP Dec. 7-8, 2010.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
RF programme Review for the ESGARD Roadmap to EUCARD2 Peter McIntosh (STFC) Stephane Chel (CEA) Wolf-Dietrich Moeller (DESY)
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
05/12/2011O. Napoly1 TESLA Technology Collaboration JLab, 5-8 November 2012 O.Napoly, CEA-Saclay TTC Chairman Introduction and update since last meeting.
Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8,
TTC TB Nov.7, TESLA Technology Collaboration At Jlab, 5-8 November, 2012 Nobu Toge and Wolf-Dietrich Moeller Report from the Technical Board (TB)
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Hans Weise, DESY TTC Meeting, Milano, February 28 – March 3, 2011 Technical Board Meeting TESLA Technology Collaboration Meeting Milano, February 28 th.
05/12/2011O. Napoly1 TESLA Technology Collaboration JLab, 5-8 November 2012 O.Napoly, CEA-Saclay TTC Chairman Collaboration Board Report.
05/12/2011O. Napoly1 TESLA Technology Collaboration Meeting Beijing, 5-8 December 2011 O.Napoly, CEA-Saclay TTC Chairman Collaboration Board Report.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
ILC Accelerator Activities in Japan
WP5 Elliptical cavities
Report from the host of the next TTC meeting
ILC Cryogenics Work Package Status and Plans
WG-1 Session Cavity Performance Cryomodule Performance
TTC - JLab - Bob Laxdal - TRIUMF
Accelerator Research and Innovation for European Science and Society
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
2009 TESLA Technology Collaboration Meeting at Orsay
Charge for the Technical Board Members of the Tesla Technology Collaboration (TTC)
2. SCRF General Preparation for the AD&I Preparation for AAP Review
2nd TTC Topical Workshop on « SRF Cryomodule Clean Room Assembly »
TESLA Technology Collaboration KEK, 2-5 December 2014
, A. Yamamoto SCRF WebEx Meeting.
WG3: Main Linac SCRF(cavity,cryomodule)
Introduction to Jefferson Lab
Collaboration Board Meeting Closing Hasan Padamsee
Matthias Liepe Zachary Conway CLASSE, Cornell University June 1, 2009
Nick Walker (DESY) EU GDE Meeting Oxford
Olivier Napoly, coordinator CEA/Irfu
ILC Cryogenics -- Technical Design Report Planning
Report of TTC-TB meeting at INFN-Milano
TTC meeting at Milano, 2011' Feb. .28
TTC meeting, Milano Global Design Effort
TESLA Technology Collaboration Meeting at Milano
Welcome & Introduction
Hans Weise, DESY February 5th, 2019
Tom Peterson, Fermilab 6 December 2011
Report of TTC-TB meeting at TRIUMF, UBC
Presentation transcript:

05/12/2011O. Napoly1 TESLA Technology Collaboration Beijing, 5-8 December 2011 O.Napoly, CEA-Saclay TTC Chairman Introduction and update since last meeting

We are welcome to the TTC meeting hosted in Beijing by the Institute of High Energy Physics, Chinese Academy of Sciences (IHEP, CAS), the Peking University (PKU) and the Tsinghua University (THU). Many thanks to: Prof. Gao, Jie (Chair), IHEP Prof. Liu, Kexin (vice-Chair), PKU Prof. Tang, Chuanxiang (vice-Chair), THU for chairing the meeting. 05/12/2011O. Napoly2

In Memoriam Bernard Aune passed on September 30, /12/2011O. Napoly3 Head of CEA Accelerator Division Head of TTF Project (~1995)

TTC Members 05/12/2011O. Napoly4

TTC Members 05/12/2011O. Napoly5 New MoU’s signed TTC membership consists of 53 Institutes from 12 countries and 2 International Organisations

TTC committees new membership TTC Deputy Chair: Mark Champion TTC Executive Committee: John Mammosser, Hans Weise, Akira Yamamoto Technical Board Chair: Nobu Toge Co-Chair: Wolf-Dietrich Möller Thank you for accepting to share the responsability. 05/12/2011O. Napoly6

My Idea of the TTC The TESLA Technology Collaboration is at the same time: 1. a “forum” of discussions and exchanges on Superconducting Radio Frequency (SCRF) systems cutting edge developments, from the R&D level to running accelerator aspects and, in return, 2.a “think tank” capable of providing top level and experienced advices and expertise to SCRF accelerator projects, from the design phase to the operation stages, including optimisation and upgrades. The TTC “forum” culminates during the TTC meetings whose success is guaranteed by the excellence of the presentations, intellectual debates and technical findings that it convenes, by free will, from the members of the TTC institutes. The TTC “think tank” is a unique body comprising most of the major accelerator centres and accelerator science institutes in the world, addressing a broad range of applications in scientific fundamental research. 05/12/2011O. Napoly7

Priorities of the next 3 year mandate The priorities of my mandate will be: To maintain the excellent quality of the recent scientific and technical material presented and discussed during the TTC meetings; To consolidate the recent and successful integration of the proton and ions superconducting linac SCRF developments, inherited for the former TTC Chairman, Professor Yamazaki; To broaden the scope of work by investigating new synergies, new applications and frontier projects; To face the Cost issue, i.e. the reasons for costs escalation in the past years, and the means of cost reduction. 05/12/2011O. Napoly8

Priorities of TTC until /12/2011O. Napoly9 Performances of SCRF systems

Priorities of TTC : /12/2011O. Napoly10 Performances Applications of SCRF systems

A proposal for TTC Priorities /12/2011O. Napoly11 Performances ApplicationsEconomics of SCRF systems ‘ APE ’

Cryogenics Economics 05/12/2011O. Napoly12 Example of a linac with two ‘XFEL-like’ cryomodules SOLEIL) Assumptions: power = 0,1 € K CoP(2K) = 700 W/W magnetic shield = 2500€ / cavity cryogenics = 1 M€/100 Duty cycle, Q0, Gradient Operational power cost Capital cost of magnetic shields Capital cost 2K liquefier CW 100%, , 15MV/m 210 k€ / year40 k€3,5 M€ Pulsed 1%, , 25MV/m 6 k€ / year40 k€100 k€ Pulsed 0.5%, , 35MV/m 10 k€ / year40 k€160 k€ Can one increase Q 0 with a better magnetic shielding, or any other (cheap) mean ?

A New Technical Board (TB) A new (and more numerous) Technical Board membership was invited with the goal to include ‘fresh blood’, new TTC members, and to cover the new priorities. 05/12/2011O. Napoly, TTC Chair13 Chairman N. Toge (KEK) W.D. Moeller (DESY), co-chair Cavity and couplers C. Antoine (CEA) S. Bousson (CNRS-Orsay) R.L. Geng (JLab) C. Ginsburg (FNAL) E. Kako (KEK) R. Laxdal (TRIUMF) D. Reschke (DESY) Ji Yuan ZHAI (IHEP) RF and Tuning O. Brunner (CERN) P. McIntosh (STFC) S. Noguchi (KEK) Cryomodule and cryogenics H. Nakai (KEK) T. Peterson (FNAL) P. Pierini (INFN) Integration and Operation H. Hayano (KEK) Sang-Ho Kim (SNS) M. Liepe (Cornell) S. Schreiber (DESY) Honoris Causa J. Mammosser (JLab) C. Pagani (INFN) M. Ross (GDE) H. Weise (DESY) + three more invitations pending for an answer.

Technical Board Mission According to the MoU of TTC: “the Technical Board TB shall provide advice to the Collaboration on technical activities towards reaching the goals of the Collaboration Mission. To this end, the TB will: compile information on the technology activities in different technical areas, provide findings and recommendations to the CB.” These are very abstract goals. My proposal: the Technical Board attempts 1) to digest the findings, debates and technical needs from the meeting, 2) to highlight the most interesting paths of progress, within the APE triangle, 3) to propose developments or experimental tests to explore these paths. 05/12/2011O. Napoly, TTC Chair14

TTC Beijing Meeting Programme Committee: Olivier Napoly (chair) Mark Champion Jie Gao Nobu Toge & Wolf Dietrich Möller WG1 conveners: ‘Cryomodule Test Results and Analysis’ James Kirby, Guillaume Olry, Akira Yamamoto WG2 conveners: ‘Cavity material, fabrication, treatment and testing: new concepts and new benefits’ Claire Antoine, Camille Ginsburg, Tsuyoshi Tajima WG3 conveners: ‘Cryogenics and cryostats : savings in cooling power’ Li Qiand Liu, Tom Peterson, Paolo Pierini 05/12/2011O. Napoly, TTC Chair15