Status of Upgrading Project of Tokamak T-15 E. Azizov 1), P. Khvostenko 1), I. Anashkin 1), V. Belyakov 2), E. Bondarchuk 2), O. Filatov 2), V. Krylov.

Slides:



Advertisements
Similar presentations
JongGab Jo, H. Y. Lee, Y. H. An, K. J. Chung and Y. S. Hwang* Effective pre-ionization using fundamental extraordinary mode with XB mode conversion in.
Advertisements

ASIPP Zhongwei Wang for CFETR Design Team Japan-US Workshop on Fusion Power Plants and Related Advanced Technologies February 26-28, 2013 at Kyoto University.
PhD studies report: "FUSION energy: basic principles, equipment and materials" Birutė Bobrovaitė; Supervisor dr. Liudas Pranevičius.
Ion Injector Design Andrew Seltzman.
ELECTRON CYCLOTRON SYSTEM FOR KSTAR US-Korea Workshop Opportunities for Expanded Fusion Science and Technology Collaborations with the KSTAR Project Presented.
Introduction to Spherical Tokamak
Study on supporting structures of magnets and blankets for a heliotron-type fusion reactors Study on supporting structures of magnets and blankets for.
Physics of fusion power Lecture 14: Anomalous transport / ITER.
Plasma Current Start-up Experiments without the Central Solenoid in TST-2 and Future Plans Y. Takase Graduate School of Frontier Sciences, University of.
Physics of fusion power
Physics of fusion power
Physics of fusion power Lecture 8 : The tokamak continued.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
Physics of fusion power Lecture 10 : Running a discharge / diagnostics.
Physics of Fusion power Lecture 7: Stellarator / Tokamak.
Magnetic Diagnostics for GLAST-III Tokamak M. A. Naveed, Aqib javeed and GLAST Team National Tokamak Fusion Programme Islamabad Pakistan IAEA First Technical.
IAEA 2004 ICRH Experiments on the Spherical Tokamak Globus-M V.K.Gusev 1, F.V.Chernyshev 1, V.V.Dyachenko 1, Yu.V.Petrov 1, N.V.Sakharov 1, O.N.Shcherbinin.
1 Lecture #24 Fusion ENGR 303I. 2 Outline Fusion →Definition →Atoms usually used Previous attempts at fusion Current attempts at fusion →International.
School of Energy Engineering and Physics. Professor Reza Amrollahi Biyouki Dean.
Development and validation of numerical models for the optimization of magnetic field configurations in fusion devices Nicolò Marconato Consorzio RFX,
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
1 The Broader Approach Projects P. Barabaschi F4E Garching – 14 Apr 2011.
CPOTS – 2 nd ERASMUS Intensive Program Introduction to Charged Particle Optics: Theory and Simulation Dept. of Physics,
Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik
1 ST workshop 2008 Conception of LHCD Experiments on the Spherical Tokamak Globus-M O.N. Shcherbinin, V.V. Dyachenko, M.A. Irzak, S.A. Khitrov A.F.Ioffe.
NON-EQUILIBRIUM HEAVY GASES PLASMA MHD-STABILIZATION IN AXISYMMETRIC MIRROR MAGNETIC TRAP A.V. Sidorov 2, P.A. Bagryansky 1, A.D. Beklemishev 1, I.V. Izotov.
EU-WORKSHOP FUSION PROGRAMME ROADMAP FOR FP8 IPP- GARCHING BULGARIAN EURATOM – INRNE FUSION ASSOCIATION INSTITUTE FOR NUCLEAR RESEARCH AND NUCLEAR ENERGY.
1 ST workshop 2005 Numerical modeling and experimental study of ICR heating in the spherical tokamak Globus-M O.N.Shcherbinin, F.V.Chernyshev, V.V.Dyachenko,
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
SUNIST SUNIST- Sino UNIted Spherical Tokamak Status of SUNIST spherical tokamak in 2006 HE Yexi, ZHANG Liang, *FENG Chunhua, FU Hongjun, GAO Zhe, TAN Yi,
SUNIST SUNIST- Sino UNIted Spherical Tokamak Preliminary experiment of plasma current startup by ECR wave on SUNIST spherical tokamak HE Yexi, ZHANG Liang,
V.I. Vasiliev, Yu.A. Kostsov, K.M. Lobanov, L.P. Makarova, A.B. Mineev, D.V.Efremov Scientific Research Institute of Electrophysical Apparatus, St.-Petersburg,
Remote operation of the GOLEM tokamak Gent University, December 14, 2009 Jan Stockel Institute of Plasma Physics, Prague Vojta Svoboda.
Overview of the KSTAR commissioning M. Kwon 3 June, 2008.
Physics of fusion power Lecture 10: tokamak – continued.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
NSTX-U NSTX-U PAC-31 Response to Questions – Day 1 Summary of Answers Q: Maximum pulse length at 1MA, 0.75T, 1 st year parameters? –A1: Full 5 seconds.
Demonstration of 200 kA CHI Startup Current Coupling to Transformer Drive on NSTX B.A. Nelson, R. Raman, T.R. Jarboe, University of Washington D. Mueller,
Fyzika tokamaků1: Úvod, opakování1 Tokamak Physics Jan Mlynář 8. Heating and current drive Neutral beam heating and current drive,... to be continued.
OPERATIONAL SCENARIO of KTM Dokuka V.N., Khayrutdinov R.R. TRINITI, Russia O u t l i n e Goal of the work The DINA code capabilities Formulation of the.
Physics of fusion power Lecture 9 : The tokamak continued.
EAST Data processing of divertor probes on EAST Jun Wang, Jiafeng Chang, Guosheng Xu, Wei Zhang, Tingfeng Ming, Siye Ding Institute of Plasma Physics,
HT-7U CASIPP 1 The Engineering Design of the Poloidal Field System of HT-7U Tokamak PF Group of HT-7U Team Chinese Academy of Sciences, Institute of Plasma.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
ASIPP Long pulse and high power LHCD plasmas on HT-7 Xu Qiang.
CHI Run Summary for March 10-12, 31 & April 9, 2008 Flux savings from inductive drive of a Transient CHI started plasma (XP817) R. Raman, B.A. Nelson,
OPERATIONAL SCENARIO of KTM Dokuka V.N., Khayrutdinov R.R. TRINITI, Russia O u t l i n e Goal of the work The DINA code capabilities Formulation of the.
Superconducting Tokamak T-15 Upgrade G.S. Kirnev, V.A. Alkhimovich, O.G. Filatov 1), V.V. Ilin, D.P. Ivanov, P.P. Khvostenko, N.A. Kirneva, D.A. Kislov,
Discharge initiation and plasma column formation in aspect ratio A=2 tokamak. R.R. Khayrutdinov 1 E.A. Azizov 1, A.D. Barkalov 1, G.G.Gladush 1, I.L.Tajibaeva.
Work with TSC Yong Guo. Introduction Non-inductive current for NSTX TSC model for EAST Simulation for EAST experiment Voltage second consumption for different.
GOLEM operation based on some results from CASTOR
ASIPP Magnetic Diagnostics of HT-7U Tokamak Shen Biao Wan Baonian Institute of Plasma Physics, CAS P.O.Box 1126, Hefei, Anhui , P.R.China (e_mail:
ZHENG Guo-yao, FENG Kai-ming, SHENG Guang-zhao 1) Southwestern Institute of Physics, Chengdu Simulation of plasma parameters for HCSB-DEMO by 1.5D plasma.
1 Nuclear Fusion Class : Nuclear Physics K.-U.Choi.
1 PFC requirements  Basic requirements  Carbon based  Provisions for adding (interface design included in research prep budget)  NBI armor  Trim coil.
Merging/compression plasma formation in Spherical Tokamaks
The mass of the nuclei produced is less than the mass of the original two nuclei The mass deficit is changed into energy We can calculate the energy released.
MAIN COMPONENTS  INTODUCTION  PRINCIPLE  CONSTRUCTIONAL DETAILS  PROCESS  ADVANTAGES  DISADVANTAGES  CONCLUSION.
MAGNETIC CONFINEMENT FUSION Zack Draper | Physics 485 November 23, 2015.
Prototyping of Superconducting Magnets for RAON ECR IS S. J. Choi Institute for Basic Science S. J. Choi Institute for Basic Science.
Instrumentation for status monitoring of SST-1 superconducting magnets
MANUFACTURING OF MAGNETS FOR SST-1 TOKAMAK
JongGab Jo, H. Y. Lee, Y. H. An, K. J. Chung and Y. S. Hwang*
International Youth Conference on Fusion Energy Conference
Construction and Status of Versatile Experiment Spherical Torus at SNU
The 15th International Conference on Ion Sources (ICIS’13)
Operation status of KTX
Design and Fabrication of Versatile Experiment Spherical Torus (VEST)
The GDT device at the Budker Institute of Nuclear Physics is an experimental facility for studies on the main issues of development of fusion systems based.
Presentation transcript:

Status of Upgrading Project of Tokamak T-15 E. Azizov 1), P. Khvostenko 1), I. Anashkin 1), V. Belyakov 2), E. Bondarchuk 2), O. Filatov 2), V. Krylov 2), A. Melnikov 1), A. Mineev 2), M. Sokolov 1), A. Sushkov 1) 1) National Research Centre “Kurchatov Institute”, Institute of Tokamak Physics, Moscow,RF 2) Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, St. Petersburg, RF

2  The basic strategic directions of the efforts in controlled fusion research in the Russian Federation are the support and participation in the ITER project and the participation in the development of the demonstration fusion reactor DEMO as pure thermonuclear energy sources.  Besides ITER and DEMO, researches and developments on controlled fusion within the next few years can be used for the needs of atomic power engineering.  The development and creation of fusion neutron sources (FNS) for solving problems in atomic power engineering are parallel efforts.  The Tokamak T-15 upgrade project is the initial technical base for creating industrial FNS. INTRODUCTION

3 Goals and Main Parameters of Tokamak T-15 UPGRADE Experimental study program on tokamak T-15 upgrade includes decision of the following tasks:  the obtaining of physical and technological data for FNS creation;  possibility of achieving the high values of beta as way to the reduction of fusion reactor cost;  control by the current and pressure profiles;  study of the possibility of the realization of high beta and plasma density in steady-state discharge with the completely non- inductive current;  on-line control of stability, equilibrium, heating and confinement of high- temperature plasma; study of plasma interaction with different materials, including graphite, tungsten and lithium;  as the hydrogen prototype of FNS the tokamak T -15 upgrade will be used as the test bed, on which will be mastered such systems, as the stationary injectors of neutral particles, ICR, ECR and LH plasma heating systems, will test materials and the technologies of the first wall and divertor.

4 The tokamak T-15 upgrading is carrying out within the Federal Target Programme “Nuclear energy-technologies of new generation for period and to the prospect until 2021”

5 Tokamak-15 ( ) ParameterValue R, m2,43 a,m0.7 B t (Nb 3 Sn), T3.6 I p, MA1.0

Major radius of torus R, m1.48 Aspect ratio2.2 Plasma current I P, МА2.0 Elongation, k1.9 Plasma configurationSN,DN Discharge pulse duration, s10 Toroidal magnetic field at plasma axis, T2 Magnetic flux swing in central solenoid, Wb 6 Neutral beam injection power, MW6 ECR heating power, MW7 ICR heating power, MW6 LH heating power, MW4 Main parameters Tokamak Т-15 upgrade 6

7  At the present time, the magnet system (MS) of the tokamak T-15 upgrade is being manufactured.  MS should obtain and confine of the hot plasma in the different divertor configurations.  MS includes the toroidal winding, central solenoid, poloidal field coils and horizontal field coils. STATUS of MAGNET SYSTEM

8  The toroidal winding consists of 16 D-shaped coils forming the arched structure.  The toroidal magnetic field at the plasma axis is 2 T.  The level of ripples at the outboard plasma boundary is approximately 0.8 %.  Each TF coil has 50 turns that are wound by a hollow conductor made of silver (15%)-copper alloy with dimensions 22.5mm  32 mm and  10.5 mm ID. Toroidal Winding Scenarios for the applied voltage to the winding, the current through the winding and the calculated curve of the conductor temperature. Coils at the plant in Bryansk

9 STATUS of MAGNET SYSTEM Central Solenoid  The central solenoid consists of three separated coils (of 151, 449 and 151 turns).  Each coil is wound with two parallel hollow conductors of trapezoidal form (dimensions are 14.8 x15.5  20 mm 2 with  8 mm ID), made of silver-copper alloy.  The magnetic flux swing in the central solenoid  cs is approximately 6 Wb (I cs = ± 40 kA).  The current scenario in the central coil is provided by four thyristor convertors (± 40 kA, 4 kV), and the scenarios in the upper and lower coils are provided by eight thyristor convertors (± 40 kA, 2 kV for each coil) to generate loop voltage 10 V for gas breakdown. The lower coil winding process

10 STATUS of MAGNET SYSTEM Poloidal Field Coils  PF coils are placed outside the toroidal winding and are fastened to the TF coil cases.  All coils are wound by hollow copper conductor and cooled by distilled water.  Each PF coil is fed by an independent current source.  At present, the five of six poloidal coils (PF1, 2, 3,4, 6) have been manufactured and tested. Poloidal coil winding process

11  Manufacturing of poloidal coils will be completed in 2014  Manufacturing of toroidal coils will be completed in 2015 STATUS of MAGNET SYSTEM

12 STATUS of Vacuum Vessel Vacuum vessel consists of :  toroidal shell made of a 321 stainless steel of 5 mm and 8 mm thick,  horizontal and vertical ports, a carbon first wall,  upper and lower divertors with water cooled graphite tiles,  a passive turns covered by graphite tiles. ParameterValue Diameter of outer cylinder, m4.8 Diameter of inner cylinder, m1.44 Height of the shell, m3.49 Volume of chamber, m 3 47 Surface square faced to plasma, m 2 ~150 Limiting vacuum, Pa10 -5  Vacuum tests of the vessel shell are planned to carry out in January, 2015  Baking up to C – March, 2015  Vacuum shell will be cut into three parts (one half and two quarters) for delivering to Kurchatov Institute  In-Vessel components will be manufactured in 2015 Parts of vessel at the plant in St-Petersburg Conical partsCentral cylinder

13 STATUS of ENGINEERING SYSTEMS Vacuum Pumping System  The high vacuum pumping of chamber is provided by four turbo molecular pumps with total productivity ~ 10 m 3 /s (H 2 ) and by two cryogenic pumps with productivity 4 m 3 /s (H 2 ) each.  At present time the all vacuum pumping equipment was supplied and tested with using of a control system.

14 STATUS of ENGINEERING SYSTEMS WATER COOLING SYSTEM  The magnet system, in-vessel components, the turbo molecular pumps, equipment of auxiliary plasma heating systems are cooled by distilled water with pressure 0.5 MPa and 1.0 MPa.  The total mass flow rate of distilled water is 2000 m 3 /h and river water is 1500 m 3 /h.  The equipment for water cooling system was supplied and mounted. The part of equipment is used in real operation now.

15 STATUS of ENGINEERING SYSTEMS POWER SUPPLY SYSTEM  The large changes occur in the power supply system.  Modernization of the substation 110 /10 kV should be completed in  The new sixteen different thyristor convertors and transformers for power supply systems of the toroidal winding and the central solenoid will be supplied and mounted in  Total power in the pulses will comprise 300 MVA.

Information and Control System The Central Control System that coordinates and controls the technological and fast problem-oriented subsystems has ITER-like structure and is based on Schneider Electric controllers, Wonder Ware software and NI platform. At the present time the T-15 Data Center has been prepared, the assembling of equipment for the main systems was realized. T-15 Data Center

17 Tele-conference room Control room 38 working seats

Auxiliary Plasma Heating and Current Drive Systems 18 Installation will equipped with the auxiliary plasma heating and current drive (P aux = MW) systems, including:  neutral beam injectors (3 co-injectors of 2 MW/ 60 keV H 0 each),  electron cyclotron resonance heating (7 gyrotrons of MW each, f =112 GHz with a possibility both of second harmonic ECR and electron Bernstein wave heating),  ion cyclotron resonance heating (3 antennas of 2 MW each including the possibility of the helicon wave generation),  low hybrid heating and current drive (grill of 4 MW power, f=2.45 GHz). All auxiliary plasma heating and current drive systems will be introduced into operation during

PLANS The time schedule for the tokamak T-15 upgrade introduction into operation is the following: 2015 – the completing of manufacturing of T-15 upgrade elements, the control assembling of the toroidal winding at the plant, delivering of the elements of the magnet system and vacuum vessel to the Kurchatov Institue, assembling and adjustment of engineering equipment (will be continued in 2016), disassembling of superconducting tokamak T-15; 2016 – T-15 upgrade assembling; Physical start-up

Thank you very much for your attention 20