The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.

Slides:



Advertisements
Similar presentations
MeDON meeting 09 mars IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
A.Margiotta, SNOW 2006, Stockholm, 6 May 2006 Status Report of the NEMO Project (NEutrino Mediterranean Observatory) Towards a km 3 Neutrino Telescope.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
KM3NeT-IT The Capo Passero Infrastructure M.Anghinolfi –INFN-Genova.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Amsterdam October 2003 M. Sedita VLVnT Installation and Maintenance of the submarine network The Maintenance aspect present some difficult as their.
Introduction to future synergy options Uli Katz ECAP, Univ. Erlangen Deep Ocean Cabled Observatories Amsterdam, May 2012.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN The East Sicily Node Facilities Giorgio Riccobene INFN-LNS, Catania
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
String mechanics and production P.Kooijman,NIKHEF/UU Pylos, april 2007.
25 km E offshore Catania 2000 m depth TSS Frame Buoy Junction Box e.o. connection e.o. cable from shore Shore laboratory, Port of Catania e.o. cable.
The NEMO Project: Toward a km 3 Neutrino Telescope in the Mediterranean Sea M. Circella, INFN Bari NUPPAC-05, Nov The NEMO Project (NEutrino Mediterranean.
 NEMO The NEMO Status Report M.Taiuti on behalf of the NEMO Collaboration Merida, Yucatan, Mexico 30th International Cosmic Ray Conference.
Isabella Amore Laboratori Nazionali del Sud - INFN, Catania International School of Cosmic Ray Astrophysics 15th Course: "Astrophysics at Ultra-high Energies"
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July In this talk Preparation of mass construction (including DOM and DU integration)
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
Detector Status J. Brunner 12/09/2014. Highlights Line 3 Optical Margins Line 5 UPS Situation Data Taking Status Planned Operations.
Presented by E.G. Anassontzis University of Athens on behalf of NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Mechanics for “km 3 ” neutrino.
The KM3NeT consortium ( - supported through the European Union's 6th framework programme in a 3-year Design Study - aims at the construction.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
What? Deployment of the first full KM3NeT string, a.k.a Detection Unit. Thanks to Aart Heijboer for the nice drawings!
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
1 Motivations KM3Net VEOC Based on developments on solid cable at NEMO and Antares project and proto cable of Seacon. Optimizing properties like; flexibility.
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
05/07/2010P. LamareBackbone dry solution Dry backbone requirements.
CLB meeting APC Tentative action/work list.
Rosanna Cocimano for the NEMO collaboration VLV T08, Toulon, France April 2008 Rosanna Cocimano for the NEMO Collaboration A comparison of AC and.
Rosanna Cocimano Amsterdam, 5-6 July 2010KM3NeT WPF/L General Meeting Rosanna Cocimano INFN LNS Power plan for detector layout Presented in TDR.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
KM3NeT-Italy Collaboration meeting 27/11/2014 Sistema di trasmissione dati su fibra ottica: Tower Sara Pulvirenti.
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
SEA operations – June 2012 Short summary report R. Papaleo 22 june 2012.
KM3NeT WPF/L NIKHEF- MECABAR 1 A.Cosquer on behalf of the KM3NeT consortium MECABAR PROJECT PLAN 1- Context 2- 3D views and responsibilities 3-
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
Antares/KM3NeT M. de Jong. Antares  2000NL joined collaboration (3.3 M€)  2006 ‒ 2008construction  2006 ‒ todaydata taking 24h/day  2012MoU signed.
Earth-Sea Science Junction Boxes
Marseille 30 Dec ’13 KM3NET Marine Operations Catania - Status Klaus Leismüller.
Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013.
PPM-DU (WORKING DOCUMENT, DO NOT PUBLISH) A three DOM Detection Unit in place of an Antares string. Nikhef for KM3NeT: PPM-DU optical network DRAFT!, designed.
DOM developments Mini DOM PPM-DOM in Antares PPM future WP F-L.
WP F/L Seafloor network, deployment vessels and ROVs for PPM P. Lamare – CEA Irfu 1WPF/L- PPM DU site- P. Lamare30/03/2011.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
KM3NET-IT Tower Power System Rosanna Cocimano for KM3NET-IT Power Group 26 november
The electro-optical cabling system for the NEMO Phase-2 tower Antonio D’Amico INFN - LNS.
LIDO Meeting - Catania 13/01/ Giorgio Cacopardo Arrangement of PCB in LIDO E-POd.
KM3NeT-Italy Collaboration meeting 28/11/2014 Sistema di trasmissione dati su fibra ottica: Junction Box Sara Pulvirenti.
Technical Review Organization, Strategy and Report Klaus Leismüller
Status Optical System KM3NeT
Deep-sea neutrino telescopes
On behalf of Patrick Lamare
Write-up and Definitions for Cost Model
KM3NeT multi-km3 neutrino telescope: perspectives
Concluding remarks E. Migneco
M.Taiuti on behalf of the NEMO Collaboration
Catania Jan ’14 KM3NET Italy Marine Operations CTF change out
Els de Wolf 20 February 2012, Catania
(NEutrino Mediterranean Observatory): Toward a km3 Neutrino Telescope
Preparatory Measurement
Junction Boxes for KM3NeT
PPM-DOM. SPM DOM LCM SS-part ILxx
SC of KM3 Vidyo meeting of Thursday, February 18
FEE Electronics progress
Presentation transcript:

The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration of the optical pod in the JB Upgrades in the shore station

The new Cable termination frame Exploit the full capability of the main cable (20 optic fibre) Feeds & connects 4 JBs Assembled and tested by McArtney in DK

New cable termination frame delivered in mid-April (acceptance tests successful at MacArtney – first tests at LNS ok) 5 ROV-operated ODI connectors

Test at full (10kW) power

Integration of the optic pod took place in mid April by Genova,LNS and NIKHEF peoples. Power and electronic pod already integrated. Test in the 100km cable of Capo passero to check shore optical amplification layout Time asymmetry in the optical path in the JB performed Optical POD integration and more

During assembling

In the Capo Passero configuration there is nothing active in the optical path from shore to JB SFP. Distinction between EDFA communication in : o “normal startup sequence “ and in o “automatic sequence” ie when the communication to JB fails Both procedure defined and implemented (see details in Gerard’s talk); Firmware completed Integration of the Optical pod succesfully performed and tested.. Time calibration asymmetry of the Junction Box determined. Full system test still to be done due to lack of the on-shore electronics.

Time asymmetry measure in the Junction Box

Documentation still in progress: KM3NeT_ISIT_2015_002: This document describes the thermal tests performed on the mockup of the Optical POD for the Junction Box of the string for the Italian site of KM3NeT. KM3NeT_ISIT_2015_001:This document describes the mechanical structure of the Optical POD for the Junction Box of the string for the Italian site of KM3NeT. KM3NeT_ISIT_2015_003: KM3NeT_ISIT_2015_001:This document describes the assembling procedure of the Optical POD for the Junction Box of the string for the Italian site of KM3NeT. KM3NeT_ISIT_2015_004: This document shows the block scheme of the BTS firmware. KM3NeT-Italy Junction Box Optical POD Assembly:This document details the optical breakdown structure, the assembly and test procedures of the Optical POD of the Junction Box for KM3NeT-Italy.

This is an example of corrosion on the SEACON connector of the manifold of the tower In the JB the evidence is lower but clearly present in the connector #4 plugged to the tower Likely corrosion is NOT due to the material (aluminum alloy 6000 serie) In the tower: evidence of water inlet in the transition from the backbone cable (dry) to the SEACON optocon connector In the JB a similar situation is present but transition is different (from oil hose to the SEACON optocon connector)

Aluminum frame is well preserved