Carmine SENATORE Département de Physique de la Matière Condensée & Département de Physique Appliquée Université de Genève, Switzerland Benchmarking of.

Slides:



Advertisements
Similar presentations
CAPACITY BUILDING Atmospheric observations Laboratory measurements Modeling and data analysis 1.
Advertisements

Critical current density and strain effects of Fe/MgB 2 tapes with different particle sizes Université de Genève Paola Lezza Co-workers:H. L. Suo V. Abächerli.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Insertion Device R&Ds Toshi Tanabe George Rakowsky, John Skaritka and Susila Ramamoorthy NSLS-II Experimental Facilities.
Journal Club Articles from to Topological Insulator Materials - Yoichi Ando
1 © 2009 ProtoPrint S Manual Fine-Pitch Stencil Printer Step-By-Step USER GUIDE.
Eucard2-WP10 Reminder of engagement of each partner Lucio Rossi WP10 coordinator.
Alain Blondel NUFACT11 1 August 2011 Welcome to NUFACT11 WORKSHOP at University of Geneva at University of Geneva The poster shows the two-flavour mixing.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Electromagnetism Physics 100 Chapt 15 Michael Faraday.
PHD Connector Purpose: To introduce the PHD disconnectable, double-row, wire to board crimp style connector.
Introduction to Machine Vision Systems
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
Results of Radiant Panel Testing Round Robin 8 Pat Cahill
Technical Presentation – Amy Dendulk
EuCARD 2012 Collaboration Meeting Warsaw University of Technology 22 th April 2012 WP-7 / Task 4 Very high field magnet Introduction/objectives/partners.
ISAT 303-Lab3-1  Measurement of Condition: Lab #3 (2005):  List of parameters of condition: –Linear distance, angular displacement, vibration, displacement,
Lab Advisory to assist students with completing labs
Click to edit Master title style Contractors’ Technology Benchmarking Survey 2014 & 2015 Results.
FAIR MT/Cryogenics, Seong Yeub Shim Beam-Tube Eddy Loss S. Y. Shim.
Electronic Devices Laboratory CE/EE 3110 Conductivity and the Hall Effect.
V. Brosco1, R. Fazio2 , F. W. J. Hekking3, J. P. Pekola4
Application of ESPI in investigating the static deformation of a lead-free joint D. Karalekas 1, J.Cugnoni 2, J. Botsis 2 1 Lab. Adv. Manufact. and Testing,
EuCARD WP 7 – High Field Magnets Task 7.2 – Support Study Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2 – Support Study.
WP10.2 – where do we stand ? L. Bottura, C. Senatore Graphics by courtesy of A. Kario, KIT.
KIT – University of the State of Baden-Württemberg and National Large-scale Research Center of the Helmholtz Association Institute for Nuclear and Energy.
Harald Sinn European XFEL Feb. 2013, LCLS 5-way meeting Thin crystal issues (C-seeding mono)
Basic Laboratory Skills: Making Microscopic Measurements : Lab 2d
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
A colourful solution LINEARlight Colormix Dynamic color change
A.L.F. Enterprise n Electrical Parameters Measurement Component (EPMC) n Boris Fradkin ©A.L.F.Enterprise Boris Fradkin.
New experimental plans for Jc and Magnetization measurement John Himbele, Arnaud Badel, Pascal Tixador 1.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
In-Field Resistance of REBCO Electrical Joints at 4.2 K
XFEL X-Ray Free-Electron Laser Bernward Krause MEA WP-12: Warm Magnets WPL: B. Krause.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
Introduction To Engineering Bike Lab #1 - 3 Agenda Estimate bicycle frame weight.
Reported by G.Feofilov at the NA61 meeting , CERN, EVO.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP10- Future Magnets.
Grasse slr systems status - September 2005 l Slr fixed station (7835) definitively stopped » 30 years of fruitful operations » Telescope and mount moved.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
HFM coll. meeting, Febr , G. de Rijk, Summary of WP 1 Summary of the work-package. HFM: Superconducting High Field Magnets for higher luminosities.
Applied Superconductivity at UNIGE Overview of the activities Départment de Physique de la Matière Condensée & Départment de Physique Appliquée Université.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
The reading is 7.38 mm. The reading is 7.72 mm.
New single-chip “box” to test laser soldering in vacuum WP6 meeting, 16/01/14.
INDUSTRIAL ORIENTED MINI PROJECT ON STUDY ON MANUFACTURING OF STEAM TURBINE BLADES D.Shiva Krishna 08141A0307 D.Srinivasa Rao 08141A0316 S.Madhu 08141A0312.
Dr. Nadav Amdursky Faculty of Chemistry, Technion – Israel Institute of Technology, Israel Expertise in: The formation of various protein-based microscopic.
Sample calculation.
Studies at BINP Alexander Krasnov
Outline Many researchers active on theoritical superconductivity physics MaNEP Network & many others Applied research, I will mention.
EuCARD2 WP10.2 main results and open issues
L. Bottura and C. Senatore on behalf of WP10.2 February 7th, 2017
Overview of EPA Method 1631, Revision E By Roy W
Position paper on Mode Construction during Validation 2
Roebel cables for EuCARD²: experience and options.
GE alternative and outcome
Insert - dipole common issues
EuCARD2 WP 10.2 HTS Conductor
Proposals of new electron cloud monitor in the PS
Basic Skills Soldering Class
(PSF Orientation) Anisotropy
Position paper on Mode Construction during Validation 2
C.2.10 Sample Questions.
C.2.8 Sample Questions.
C.2.8 Sample Questions.
High Voltage Power Transmission for AP Physics
Presentation transcript:

Carmine SENATORE Département de Physique de la Matière Condensée & Département de Physique Appliquée Université de Genève, Switzerland Benchmarking of the I c -measurement facilities in the EuCARD-2 WP10.2 collaboration

Participating labs : proposal Other laboratories ?

Specifications of the I c devices maximum current maximum magnetic field field orientation(s) sample dimensions voltage-tap separation electric-field range for n-value temperature monitored/ not monitored sample mounting procedure o soldering or clamping o soldering material / solder flux o soldering temperature range

Define the benchmarking tests magnetic field range and orientation electric field criteria mounting procedure ? Choose the reference material Samples extracted from the high performance 12 mm tapes from BHTS ? high performance 4 mm tapes from BHTS ? other manufacturers ? Caveat: J c profile across the width Need to prepare samples with dimensions tailored to the different devices Laser cut at KIT ?