US Army Corps of Engineers BUILDING STRONG ® Solicitation W9127N-15-R-0026 The Dalles East Fish Ladder Auxiliary Water Supply Backup System General Scope.

Slides:



Advertisements
Similar presentations
RFP vs. IFB A BASIC APPROACH TO THE BID PROCESS – WHEN RFPs or IFBs ARE USED 2010 AASBO Spring Pre-Conference Workshop Rosa Saenz, PGPC, Inc. Bill Munch,
Advertisements

U.S. Pretrial Services and Probation Office Northern District of Ohio.
Presented by: Kathryn Hodges, NH
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Idaho High School Wireless Project Joyce Popp Chief Information Officer.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Procurement.
Prop 39 Bid Process: Best Practices June 16, 2014 Presented by: Rick Brown, PhD, President Ali Chehrehsaz, PEng, PMP, Senior Vice President.
Project Bidding Procedures Enhancing Data and Presentation Skills for Engineers EDASPE Writing the RFP Training Courses – July 2004.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Marcy Mealy Procurement Specialist CDBG Program
Vendor Engagement Tips. Pre-solicitation Discussion 2  Review Federal Acquisition Regulation Subpart ” Exchanges with industry before receipt of.
IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.
PROCEDURES FOR SELECTING THE CONTRACTOR
REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
BUILDING STRONG ® Greater New Orleans Hurricane and Storm Damage Risk Reduction System Lake Pontchartrain & Vicinity LPV- 03.2B, West Return Floodwall,
INDIANA DEPARTMENT OF ADMINISTRATION Electronic Book Collections, Electronic Online Database Content, and Hard Copy Book Collections REQUEST FOR INFORMATION.
Mississippi Department of Education Office of Child Nutrition Request for Proposal No Child Nutrition Management System.
Source Selection. What is Source Selection? Source Selection is the process of conducting competitive negotiations. Source Selection allows the Government.
Aerospace Ground Equipment (AGE) Support Services Pre-Proposal Conference/ Site Visit Kari M. Alvarado Contract Specialist NASA-DFRC November 8, 2006 Dryden.
Pre-Proposal Conference February 27 th, :30 PM Teresa Deaton-Reese, IDOA Senior Account Manager Comprehensive Medical Services for the Department.
US Army Corps of Engineers BUILDING STRONG ® Networking & Teaming Conference Fort Bliss Replacement Hospital Projects Jim Bales & John Rodgers Fort Worth.
Pre-Proposal Conference NASA Langley Research Center October 26, 2009.
Welcome to the Johnson Space Center Common Communications for Visiting Vehicles (C2V2) for the International Space Station (ISS) Virtual Industry Day 1.
Contract Training Class I
Café Services Indiana Government Center Indiana State Museum Request for Proposal 9-65 Pre-Proposal Conference May 18, 2009 Frank Poole, Purchasing Administrator.
Pre-Proposal Conference January 17 th, :00AM Jennifer Michael, IDOA Strategic Sourcing Analyst Assessment Classes Pertaining to Level III Assessor/Appraiser.
State of Idaho RFP02458 RFP issued May 15, 2012 Pre-Proposal Conference May 31, 2012 Questions Due June 4, 2012 Closing Date 5:00 p.m. MT June 21, 2012.
Indiana State Personnel Dept. CDL/Non-CDL Controlled Substance and Alcohol Testing Pre-Proposal Conference September 24, 2012 Greg Moorman IDOA Strategic.
Indiana Public Works Vertical Lift Equipment Maintenance Request for Proposal Pre-Proposal Conference June 18, :00 AM Greg Moorman, Strategic.
IDOA RFP Media Buy Pre-Proposal Conference June 11, 2013 Adam Thiemann IDOA Strategic Sourcing Analyst.
UPGRADE RUNWAY & ELECTRICAL VAULT PRE-PROPOSAL CONFERENCE 12 July WG/LGC SELFRIDGE ANG BASE MI.
Washington Metropolitan Area Transit Authority (WMATA) FQ15237 SIX (6) TIE BREAKER STATIONS UPGRADE ORANGE AND BLUE LINES VA, DC AND MD Pre-Bid Conference.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
1 Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) Area 3 Pre-Proposal Site Visit HSBP1015R0040 Sectors EL PASO / BIG BEND, TX
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
MARINE CORPS INSTALLATIONS EAST CONTRACTING DIVISION DEFINING REQUIREMENTS.
Environmental Services Pre-Solicitation Conference NNA J-WLT April 23, 2004.
BUILDING STRONG ® PORTLAND DISTRICT 1 The Dalles Dam Emergancy AWS Backup Water Supply P&S FFDRWG Meeting, 4 Feb Pat Duyck Project Manager.
925th Contracting Battalion & Regional Contracting Center Capital
External Grantee Evaluation Services RFP Pre-Proposal Conference March 17, 2011 Kyle McClurg, IDOA Strategic Sourcing Analyst.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
IAS Pre-proposal Conference December 10, 2012 Pre-proposal Conference December 10, 2012 San Antonio bldg 1 & 4 Renovation san antonio, tx Project no: San.
Village of Woodridge, IL ERP System and Implementation Services Vendor Pre-Bid Meeting August 28, 2013.
Federal Acquisition Service U.S. General Services Administration Area Facility Operation Specialist (aFOS) 88 th Regional Support Command Pre-Bid Meeting.
EMOSS-V Pre-Proposal Brief 19 May 2015, Room 2007.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Bus stop Amenity Cleaning April 13, 2016.
Comprehensive Health Care Services – Inpatient and Outpatient Mental Health Services ITN January 27, 2016.
Evaluation. What is important??? Cost Quality Delivery Supplier Expertise Financial Stability Coverage Product Offerings Do you intend to negotiate?
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
Department of Veterans Affairs Network Contracting Office (NCO) 21 Repair Building 1A Data Cables Pre-Proposal Conference and Site Walk Construction Request.
PRE-PROPOSAL CONFERENCE COMMUNITY LIVING CENTER CULTURE AND SAFETY IMPROVEMENTS VA R-0961 PROJECT: 654-CA-317 MAGNITUDE: $5 - $10 Mil 8/27/2012.
PRE-PROPOSAL CONFERENCE RFP - VA R-0039 AMARILLO VA HEALTH CARE SYSTEM Building 34 Room Amarillo Blvd West Amarillo, TX /18/2012.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Inspection, Testing, and Maintenance of Fire Protection and Life Safety Systems.
US Army Corps of Engineers BUILDING STRONG ® Building and Preserving Alaska’s Future Alaska District Design-Build Contracts Moolin Seminar November.
RFP 12-58, Data Warehouse Pre-Proposal Conference
Submitting a Responsive Proposal
Pre-Proposal Conference for three separate solicitations
Skyway Insight© Webinar
PRE-PROPOSAL CONFERENCE
TRAVEL SERVICES Request for Proposal
CDBG Procurement Date of Session, 2017 Washington, DC Brian Delvaux
Contracting by Negotiation Process Map – Part 15 (1 of 3)
Request for Proposal and Specifications for
THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
Washington Metropolitan Area Transit Authority (WMATA)
Fasset Briefing Session
Omnibus IV Contracting Strategy Michael D’Alessandro
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Solicitation W9127N-15-R-0026 The Dalles East Fish Ladder Auxiliary Water Supply Backup System General Scope Overview for Contractor Site Visit Michael I. Grasso, Contract Specialist Steven Sipe, Technical Lead Patrick Duyck, Project Manager 23 June 2015

BUILDING STRONG ® PORTLAND DISTRICT 2 Disclaimer  Everything presented here today is informal and does not constitute changes or deviations from the specifications.  Any answers given here today are not official. For official answers use the bidder inquiry procedures (Refer to Slide 9).

BUILDING STRONG ® PORTLAND DISTRICT 3 Administrative Sign the Registry If you would like a copy of this presentation, include your address Restrooms Designated Smoking Areas Emergency Exits

BUILDING STRONG ® PORTLAND DISTRICT 4 Agenda Purpose/Ground Rules Project Overview, Technical Overview and Project Challenges, Key sections Steven Sipe – Technical Lead, Mechanical Engineer Field Tour: Safety Rick Reiner– The Dalles Project Rep Field Tour

BUILDING STRONG ® PORTLAND DISTRICT 5 Purpose Exchange information regarding the scope of project, specifications, and outcomes Overview of the job site. Establish lines of communication with Industry All questions/comments will be submitted through the bidder inquiry system

BUILDING STRONG ® PORTLAND DISTRICT 6 Ground Rules Information conveyed at this site visit does not qualify as the terms and conditions of the solicitation. All communications shall be conducted through the Contract Specialist or Contracting Officer. Interested vendors should ask questions using the Bidder Inquiry system Non-attendance at this event does not preclude an offeror from submitting a proposal in response to the RFP

BUILDING STRONG ® PORTLAND DISTRICT 7 Ground Rules cont. Internal Source Selection Plans and procedures will not be discussed If an item is not mentioned or addressed during this presentation, do not assume it is not important Utilize the Bidder Inquiry site that is included in the solicitation Offerors shall not engage individual government personnel in private discussions at any time

BUILDING STRONG ® PORTLAND DISTRICT 8 Solicitation Overview Terms and conditions have been posted formally and publicly Solicitation W9127N-15-R-0026 Federal Business Opportunity (FBO) Proposals due 16 July 2015 Unrestricted Solicitation Open to Small and Large businesses Subcontracting Plan is required with their proposal Best Value/Trade Off Best value is a process used in competitive negotiated contracting to select the most advantageous offer by evaluating and comparing factors in addition to cost or price Evaluation criteria is stated in Section of the solicitation

BUILDING STRONG ® PORTLAND DISTRICT 9 Submission of Questions  Submit all questions in writing. All inquiries regarding this solicitation are to be submitted via ProjNet-Bid  Telephone and inquiries will not be accepted  ProjNet-Bid can be accessed through ProjNet at ► The Bidder Inquiry Key is: DDTTGS-MK2ECI  Bidder inquiry closes COB 13 July  Proposals shall not be based on informal discussions during site visit – submit questions via Bidder Inquiry

BUILDING STRONG ® PORTLAND DISTRICT 10 Proposal Submission  Please read the entire solicitation package and follow instructions to ensure a complete proposal is prepared and submitted to NWP.  Section Submission of Proposals covers what to include in the proposal Volumes I & II.  Proposals are due 16 July 2015, 4:00PM Pacific Time. (FAR )

BUILDING STRONG ® PORTLAND DISTRICT 11 Project Overview Technical Lead Steven Sipe, PE

BUILDING STRONG ® PORTLAND DISTRICT 12 History and Overview  Current Fish ladder provides access for more that 80% of upriver returning adult fish.  Normal flow in the ladder is provided by two fish turbines.  Other ladders on the Columbia River have a secondary water supply, the Dalles east ladder does not.  This Project will provide an emergency backup water supply to the ladder should the Fish units fail.

BUILDING STRONG ® PORTLAND DISTRICT 13 Major Features  To highlight major project features.  To highlight special conditions and constraints. **See plans and specs for complete information.**

BUILDING STRONG ® PORTLAND DISTRICT 14 Major Features  Dam Face concrete piers. Precast pier segments with guide slots for closure gate, dewatering bulkheads, and trash-racks. Attachment of the precast piers to the dam face and grouting of the joints. Dive work requirements (to approx 70 feet).  The penetration bore hole through Monolith 5. The 10 – foot diameter inlet is to be a bell-mouthed circular penstock pipe inlet normal to the dam face at a depth of 41.5’ (nominal).  Rock excavation is required in some areas. **See plans and specs for complete information.**

BUILDING STRONG ® PORTLAND DISTRICT 15 Major Features (cont)  190 feet of 10’ diameter pipe.  1 ea 10 foot valve in Valve Room.  310 feet of 7’ diameter pipe.  2 ea 7 foot valves, in a common valve room.  Electrical distribution system. Electrical lights, receptacles, disconnect switches, and remote control stations for the valves and the valve rooms.  Replacement or relocation of water, sanitary sewer, and storm sewer mains and other components. Work will be done at operating project. Cannot block access. **See plans and specs for complete information.**

BUILDING STRONG ® PORTLAND DISTRICT 16 Schedule  Proposals Due: 16 July 2015  Contract award: Approx. 17 August 2015  Notice To Proceed: Approx. 31 August 2015  On Site Work Window: ► Sept – June 2017  Two separate In-Water-Work (IWW) windows ► Dec – Feb ► Dec – Feb

BUILDING STRONG ® PORTLAND DISTRICT 17 Summary of Work

BUILDING STRONG ® PORTLAND DISTRICT 18

BUILDING STRONG ® PORTLAND DISTRICT 19

BUILDING STRONG ® PORTLAND DISTRICT 20

BUILDING STRONG ® PORTLAND DISTRICT 21

BUILDING STRONG ® PORTLAND DISTRICT 22

BUILDING STRONG ® PORTLAND DISTRICT 23 Key Specification Sections  Contractor Operations ► IWW Section 00800,  Rock excavation  Diving Appendix D -Portland Requirements  Contractor Personnel ► Project Manager, Project Engineer, and Project Superintendent. ► sect Site Safety and Health Officer (SSHO) ► CQC System Manager  Pressure Pipe Welding

BUILDING STRONG ® PORTLAND DISTRICT 24 Field Tour: Safety  This plant is ONLINE and ENERGIZED. Do not open panels/doors without first talking with Rick Reiner.  There are project personnel moving through and around the project site, please watch for cars and other vehicles as we view the work areas.  There is crane rails, hatch cover and other possible tripping hazards as we walk the site so please be aware.

BUILDING STRONG ® PORTLAND DISTRICT 25 Field Tour: Safety (Con’t)  Please stay together. We will move floor by floor as a group giving ample time for everyone to look at all the components.

BUILDING STRONG ® PORTLAND DISTRICT 26 Questions ?