SLHC SCT Hybrid (CERN 2nd July 2007)1 SLHC SCT Hybrid Concept Ashley Greenall The University of Liverpool.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

ASE Flip-Chip Build-up Substrate Design Rules
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
1 ACES Workshop, March 2011 Mark Raymond, Imperial College. Two-in-one module PT logic already have a prototype readout chip for short strips in hand CBC.
Stave Hybrid Status Ashley Greenall 1. Current Status Current build of hybrids (Version 3) distributed to 6(+1) sites: Cambridge, DESY, Freiburg, LBL,
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
General needs at CERN for special PCB’s Philippe Farthouat CERN.
Hybrid Status Carl Haber 12-Aug-2008 UCSC. 6 x 3 cm, 6 chips wide 10 x 10 cm, 10 chips wide 1 meter, 3 cm strip, 30 segments/side 192 Watts (ABCD chip),
1 Module and stave interconnect Rev. sept. 29/08.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
A multi-chip board for X-ray imaging in build-up technology Alessandro Fornaini, NIKHEF, Amsterdam 4 th International Workshop on Radiation Imaging Detectors.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
SLHC Strip Tracker Module Envelopes (Tim) WP4 Meeting Glasgow, 13 th June 2011.
UK Hybrid Development for ATLAS SLHC Short Strips A. Affolder University of Liverpool.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
Design and Performance of Single-Sided Modules within an Integrated Stave Assembly for the ATLAS Tracker Barrel Upgrade Ashley Greenall The University.
1 WP3 Bi-Weekly Meeting Activities at Liverpool 1.Evaluation of Compact DCDC converter Designed to match up to an ABC130 module 2.Status of FIB’d hybrid/module.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Stavelet Update Peter W Phillips 29/07/2011. Serial Powering with a Stavelet Module: Recent Results Whilst single SP modules in the “chain of hybrid”
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
And now for something completely different First results from the DC-DC Stavelet Peter & Ashley with Giulio & John.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
Strip Module Working Group Meeting 16 th May 2012 Hybrids A Greenall.
Testing of ABC  Not to scale! 100nF Edge Sensor wired to A9, A10 ? ABC nF NB graphic is not an exact match with “ABC_Pads_V5.2.pdf”
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
Trends and synergies in solid state tracking R&D Executive Summary of the session Frank Hartmann.
1 Decoupling Capacitors Requirements Intel - Microprocessor power levels in the past have increased exponentially, which has led to increased complexity.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
Two versions went for manufacture – test vehicle for tab and solder resist evaluation Trying to improve planarity of circuits Circuit build is identical.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
Hybrid circuits and substrate technologies for the CMS tracker upgrade G. Blanchot 04/MAY/2012G. Blanchot - WIT
DCDC for 250nm Stave and ABC130 Hybrid - Revisited.
ABC130 Hybrid/module and HCC Bond Detail ABC130 Left & Right Handed Hybrid and Module Topology Original proposal – same flavour hybrids Hybrid-module.
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.
Hybrid Activities for ABC Aim to freeze thermo-mechanical layout next week in readiness for submission Will make use of a resistive serpentine.
1 ABC130 Module Envelope Envelope set by 2 locations 1.Power end – biggest contribution coming from shield box 2.Data I/O end – set by wire bonding from.
SLHC Stave Wire-bonding Clearances (Tim) WP4 Glasgow (13 th June 2011)
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
Module Radiation Length. Goals Estimate the expected radiation length of a module, based on the design and measurements on as-built modules Determine.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
R&D on substrates for CMS tracker hybrids G. Blanchot 07/NOV/2011G. Blanchot - R&D on substrates for CMS tracker hybrids1.
Update on the activities in Milano M. Citterio and N. Neri on behalf of INFN and University of Milan SuperB Meeting: SVT Parallel Session.
Goals and requirements 1 st flexible geometry version Next geometry version development Conclusions and outlook A realistic and flexible VTX geometry in.
Transmission Line Studies Need to understand data transmission at 640 Mbps along bus tape. Analytic formulae FEA calculations from Roy. Network analyser.
Tapes and Integration of Powering (endcap) Pepe Bernabeu (IFIC) Valencia/UK - Experience and future collaboration on staves/petals, June 17 th 2010.
H.-G. Moser Max-Planck-Institut fuer Physik DEPFET Meeting Heidelberg Sept DEPFET Geometry for SuperBelle Sensor Geometry Pixel Pitch Constant/variable.
Mauro Citterio, Fabrizio Sabatini
Tracking detectors/2 F.Riggi.
T. Bowcock University of Liverpool
Ashley Greenall The University of Liverpool
Grid Pix Field Simulations and precision needed for a module
FORTH - Modelling Issues addressed
Large area short strip arrays
July 2, 2007 ID CERN S. Terada KEK Module and Service Structure Designs -Super module conceptual design- - FEA thermal analyses- -Test of angled.
Hybrid Pixel R&D and Interconnect Technologies
Constructional requirements from ITk-Strips
Phase 2 Outer Tracker Module analysis
2S module geometry updates Module positioning concepts
Vereinfachung der CBM TRD Elektronik
The LHCb VErtex LOcator
SALTRO16 activities in Lund
Updates on the Silicon Tracker 2S Module
Presentation transcript:

SLHC SCT Hybrid (CERN 2nd July 2007)1 SLHC SCT Hybrid Concept Ashley Greenall The University of Liverpool

SLHC SCT Hybrid (CERN 2nd July 2007)2 What will be discussed What we would like to achieve, and how it could possibly be done. Hybrid layout and its interaction with other module components. What are the constraints? Initial thoughts on layout options But no complete solutions Still a lot of unanswered questions! What I will not discuss Services – a lot of unknowns Hybrid trace layout detail – ditto Progress is difficult without ‘real’ components

SLHC SCT Hybrid (CERN 2nd July 2007)3 What we would like Ideally, a 40 ASIC hybrid which will Use minimal material in its construction Match up to a square sensor geometry (99mm x 99mm) How could this be achieved? By reducing the hybrid width Reduced material Making use of direct ASIC-to-Sensor wire-bonding Eliminates the need for pitch adaptors But, this means that Readout ASIC (ABC-N) die size has to take into account ASIC-to-Sensor bonding Especially its width –Must be optimised to match the sensor geometry

SLHC SCT Hybrid (CERN 2nd July 2007)4 Direct ASIC-to-Sensor Bonding Is this possible? YES, if we match (closely) the ASIC Input and Sensor bond pads Setting ASIC width to 7.5mm could help – any wider becomes problematic (SMD placement for front-end decoupling etc.) ASIC input bond pad pitch becomes 55µm Sensor bond pad pitch is set to 75.6µm Mismatch can be taken up by the wire-bonds But… Wire bonding issues We use a H&K 710 wire-bonder, max. bonding angle <17° (see following diagram.) –Using 25µm bond wire Bond foot displacement is a problem at the ASIC input pads (see Tim’s talk) 17° bond angle constrains ASIC-to-Sensor bond pad distance to ≥4.1mm Results in ‘long’ bond wire lengths – maybe not problematic? These parameters will determine where sensor bond pads can be located Need to converge on a ‘standard’ set of parameters!

SLHC SCT Hybrid (CERN 2nd July 2007)5 ASIC – Sensor Detail 16.6° bond angle Front-end Decoupling Capacitor ASIC Cap Hybrid Substrate ASIC Capacitor on topCapacitor on underside “Well” in substrate Continued… 7.5mm Width ASIC Detail 55µm ASIC input bond pad pitch 75.6µm Sensor pitch <17° bonding angle ASIC-to-ASIC separation is 2.1mm –Miniature capacitor could be placed in gap –100nF, X7R, 0402 SMD (Murata…) –1mm x 0.5mm x 0.5mm (LxWxH) alternatively Place capacitor on the underside of hybrid

SLHC SCT Hybrid (CERN 2nd July 2007)6 Opportunity to also consider optimising ASIC bond pad placement Data & Token Passing Hybrid Traces ABCD ByPass Hybrid Traces ‘Old’ ABCD Routing“Revised” Routing Data & Token Pads moved to side Allows direct wire-bonding ByPass routing on chip Reduces hybrid trace routing Data & Token Passing wire bonds ByPass routing ASIC Bond Pad Placement

SLHC SCT Hybrid (CERN 2nd July 2007)7 SLHC ‘Narrow’ Hybrid (concept) Taking these ideas on board, conceptually a hybrid could look like below Digital I/O Power/Aux Bus 99mm MCC Power Regulation 24mm 74mm SENSOR Readout ASICs Detail 2 ‘fingers’ per hybrid populated with 2 columns of 10 ASICs (40 total/hybrid) Electrically one item 4 Cu Layers with Kapton dielectric (example from LHCb VELO) 100µm track and gap, 300µm vias (conservative design to maximise yield) 2 x Outer layers (routing) are 5µm Cu with additional ~8µm plating 2 x Inner planes (PWR/GND) are 12µm Cu 50µm Bond Ply (Espanex) between layers 200µm total build thickness But, Services detail unknown Connector detail not finalised Power Regulation & Module control not defined ??? HV MCC: Module Controller Chip

SLHC SCT Hybrid (CERN 2nd July 2007)8 Example of routing density But there are caveats… Reduced material could mean Power/Gnd Planes compromised Might impact upon module electrical stability Consider Present SCT Barrel hybrid has 2 planes of ~3178mm 2 Cu area/plane & 1.6A total current EndCap required 4 dedicated layers of ~2500mm 2 Cu area/plane for stability Narrow hybrid has ~2376mm 2 Cu area/plane per finger with 2.74A current (nominal) Based on 4 layer build (2 Power/Gnd Planes) ~70% increase in current with ~25% reduction in Cu (compared to Barrel). Increasing width from 24mm to 32.5mm, Cu area becomes comparable to Barrel hybrid But still 70% more current! Add more Cu (by increasing Cu thickness/more layers) Lowers Plane impedances BUT Need to consider skin affect? High frequency parasitics could still be problematic Increasing Cu thickness does not necessarily help – increased Cu area does SLHC ‘Narrow’ Hybrid (concept)

SLHC SCT Hybrid (CERN 2nd July 2007)9 Hybrid Width (impact of) Prudent to consider 2 flavours of hybrid: 1.Preferred ‘narrow’ (24mm width) hybrid, minimal material approach 2.Backup solution of a ‘wide’ (32.5mm width) hybrid Or do we just increase the material on the preferred solution? If we adopt the 2 flavour approach, then Sensor bond pads must be placed to accept the differing hybrid geometries

SLHC SCT Hybrid (CERN 2nd July 2007)10 Sensor Bond Pads (a first look) Hybrid “finger” is centred w.r.t. sensor strip start/end points

SLHC SCT Hybrid (CERN 2nd July 2007)11 Sensor Bond Pads (wide hybrid) Wide hybrid detail For either ‘narrow’ or ‘wide’ hybrids Sensor bond pads are asymmetrically aligned w.r.t. the sensor strip Sensor pad location is determined by Adhering to the <17º bond angle Maintenance of the 4.1mm separation from ASIC to sensor bond pads Peculiar to Liverpool

SLHC SCT Hybrid (CERN 2nd July 2007)12 Summary The step from the original 12 device SCT hybrids to 40 device SLHC hybrid is a bold decision to make! We need to now: Optimise the ASIC width to match that of the Sensor –Fix at 7.5mm? Revisit ASIC bond pad placement –Some bond pads can obviously be moved, some not so… Understand what are the constraints if we wish to bond directly from ASIC-to-Sensor –What is the max. bonding angle that is universally acceptable? –What other wire-bonding parameters do we need to unify? Will minimal material approach compromise electrical performance? –Is it really necessary to consider 2 flavours of hybrid? –Even if we don’t, would it not be prudent to engineer the sensor such that it is not ‘flavour’ exclusive? i.e. add bond pads on the sensor so that we can (maybe) try numerous flavours of hybrid ???

SLHC SCT Hybrid (CERN 2nd July 2007)13 Backup

SLHC SCT Hybrid (CERN 2nd July 2007)14