1 STAR TPC The STAR TPC Status and Additional Issues: 2009 (There are a few issues other than wire aging, and HV trips, …) Jim Thomas.

Slides:



Advertisements
Similar presentations
GEM Chambers at BNL The detector from CERN, can be configured with up to 4 GEMs The detector for pad readout and drift studies, 2 GEM maximum.
Advertisements

2.1.4.G1 Setting Financial Goals Advanced Level. © Take Charge Today – August 2013 – Setting Financial Goals – Slide 2 Funded by a grant from Take Charge.
“L3” Jeff Landgraf. In July, Hank sent me a message asking if I had any talks for this meeting. “No, but I have some issues that could be discussed.”
1 Jim Thomas - LBL A Brief Introduction to the STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory June 4 th, 2009.
InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
1 Potential Hardware Improvements, Related R&D Wieman RNC LBNL TPC Review Friday 6 October 2006.
Amsterdam, April 2,2003P. Colas - Micromegas TPC1 Micromegas TPC: New Results and Prospects New tests in magnetic fieldNew tests in magnetic field FeedbackFeedback.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Calice Meeting DESY 13/2/07David Ward Guidelines for CALICE presentations Recently approved by the Steering Committee.
Research Methods.
XEC Hardware Status MEG Review Meeting 2010 Liquid Xenon Group.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Internet Research Finding Free and Fee-based Obituaries Online.
STAR Collaboration Meeting, Nantes, July2002 SVT Analysis/Status Update Jun Takahashi – University of Sao Paulo.
Production Possibilities Curve. PPC This illustrates the fundamental problem of scarcity. Since wants will always exceed available resources, people living.
28 February, 2003 STAR Collaboration meeting Status of the dE/dx calibration Yuri Fisyak.
Basic Concepts of Computer Networks
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
CAL DQM SHIFT TODO and RELATED MATERIAL T. Schörner-Sadenius Hamburg University CAL Meeting, 13 October 2004.
1 TPC online  offline calibration November 2002.
C.Woody, PHENIX Upgrades, 11/10/00 A TPC for PHENIX ?? No, surely you must mean for STAR…. PHENIX, really …. ??? You must be NUTS !!! Well, wait a minute...
1 TOF Aging Discussion Background information Summary of results so far Examples of gain loss mechanisms Diagnostics Possible scenarios for 2006 Discussion.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Cube Measurements Tent Crew. Scintillation BNL 241 Am Semi- collimated  Spectralon Diffuse UV Reflector SBD  -Trigger Scint. Light Poisson.
JT: 1 The Berkeley Lab STAR TPC Distortions in the Transverse Plane: An Update Jim Thomas.
FEE LVPS 1. INTRODUCTION This section describes the Low Voltage Power Supplies (LVPS) for the TPC FEEs and RDOs. Plans currently call for all of the old.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
CODIF Status Lynn Kistler, Chris Mouikis Space Science Center UNH July 6-8, 2005 Paris, France.
1 TPC Basics H. Wieman LBNL Oct. 18, Ann. Rev. Nucl. Part. Sci : 217.
PAD MONITOR The TPC pad monitor is used to check the performance of the TPC electronics. It can display the amplitude vs time bucket histogram for all.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
MICE Target - Risk Lara Howlett University of Sheffield.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
1 Jim Thomas - LBL HFT Issues that may Bear on the Fate of the SSD & SVT presented by Jim Thomas 07/07/2006.
Update on TPC R&D C. Woody BNL DC Upgrades Meeting October 9, 2003.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
1 STAR TPC The STAR TPC Status and Issues A brief report to the STAR Council Jim Thomas.
Preliminary results of a detailed study on the discharge probability for a triple-GEM detector at PSI G. Bencivenni, A. Cardini, P. de Simone, F. Murtas.
LASER CALIBRATION SYSTEM for STAR TPC Alexei Lebedev (BNL) for STAR collaboration  Design and description  Performance  Goals and results  Future developments.
TPC ExB distortion at LHC-ALICE experiment Yasuto Hori for the ALICE-TPC collaboration Center for Nuclear Study, University of Tokyo 1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
TPC/HBD R&D at BNL Craig Woody BNL Mini Workshop on PHENIX Upgrade Plans August 6, 2002.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
1 Jim Thomas - LBL Sector Tools – a conversation with Jon Wirth and Eric Anderssen August 28 th, 2015.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
H. MatisSTAR Inner Silicon Tracking Detector Review – July 8, SSD software and hardware maintainability Howard Matis.
Status of PHENIX Drift Chamber Drift Chambers (DC) are one of the vital components of PHENIX central arms. During the last RHIC Run3 the major activities.
1 Jim Thomas - LBL Inner Sector Upgrade for the TPC Jim Thomas Lawrence Berkeley National Laboratory UCLA Upgrades Workshop December 14 rd, 2011.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
TPC ALARM HANDLER In addition to the big slow controls alarm handler I usually ran a TPC only alarm handler as a separate process. The TPC alarm handler.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
Possible Improvement of MUID Performance Itaru Nakagawa, Seyoung Han (RIKEN, Ewha/RIKEN)
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
6/29/2016I. Ravinovich1 HBD status in Run-10 I. Ravinovich WIS.
June 4, 2009 STAR TPC review Estimation of TPC Aging Based on dE/dx Measurements Yuri Fisyak.
Hardware considerations about Ar vs. Ne
FEE for TPC MPD__NICA JINR
MWPC prototyping and testing of STAR inner TPC upgrade
Presentation transcript:

1 STAR TPC The STAR TPC Status and Additional Issues: 2009 (There are a few issues other than wire aging, and HV trips, …) Jim Thomas

2 STAR TPC We are exploring new territory with pp 500 Luminosity is up a factor of 3 compared to 2008 pp200 run, and expected to go up 4x in coming years Trigger rates can now go up a factor of 3 or more pp500 Multiplicities are 1.25x higher than in pp200 So we are working with ~5x more charge in the TPC than ever before and STAR may ask for ~40x before we are done

3 STAR TPC pp 500 is more demanding of the TPC … Beam currents are up compared to previous pp runs –Peak luminosity at the very end of run 8 was 2 * –Peak luminosity at the end of the pp500 engineering run was 6.6 * –pp 500 goals are to achieve at least 2x higher luminosity, preferably 4x Significantly more tripping than in previous years –Shift Leaders have taken to calling them “our old friend 18-4” –Speculation as to why this may be true –This may be due to holes in our shielding in the tunnel leading to hotspots in the TPC (consistent with Carl’s observations) –It may merely be due to increased background that goes with increased beam currents –Perhaps the TPC is getting older (aka ‘aging’) or has faults (ABDB boards) This is happening even though trigger rates were held at about 150 Hz for pp500 and trying to stay below 450 Hz for pp200 –A higher trigger rate means more charge travels to the anode wires; in proportion to a background rate + the trigger rate –We have tested up to 1000 Hz. Rate limiter prevents exceeding 750 Hz.

4 STAR TPC Anode Currents in Run 8 Our tradition has been to keep the anode currents low to avoid damage to the TPC and to avoid aging the anode wires

5 STAR TPC Anode currents on the outer sector in Run 9 The charge density in the TPC ~ 1/r 2 so the outer sectors see less load

6 STAR TPC Inner Sector: Normal operation – GG triggered To be fair, the alarm limits are set at our discretion and we haven’t changed the alarm limits on these screens compared to last year. We are debating whether it is wise … or not.

7 STAR TPC Lower the gain on the inner sectors Lowering the gain from 1170 to 1135 volts dropped the gain to 66% on the inner sectors –This was required in the pp500 run due to too many HV trips –We couldn’t take data … the recovery time exceed the up time –The reduction to 2/3 gain yields approximately equivalent results to previous years operation in terms of tracking and dE/dx –New TPX electronics has 30:1 gain, while previous TPC electronics was running with 20:1 gain –The TPC was designed for 20:1 signal to noise (cluster & tracking) –We kept these settings for the succeeding pp200 run and the results appear to be successful –Elegant results from Yuri Fisyak

8 STAR TPC Other Options Add Alcohol to the gas –A long tradition … but perhaps one of the arts of the occult Add H 2 O to the gas –Also anecdotal evidence that this helps aging –Although I have some irrational concerns about this option … Turn off or reduce voltage on selected HV channels (e.g. small R) Turn off or reduce voltage on the anodes at the end of each run –Run control takes 20 seconds to start Trigger the anodes and pulse them with 100 volts for each event –If the electronics can stand the noise Alternate gas mixtures –Options somewhat limited due to limited field cage characteristics These options may help deal with the wire aging issues … but only the options to change the HV on the anodes helps with the tripping at high Luminosity

9 STAR TPC More Challenging Than Ever … TPC calibrations are more challenging than ever –The pp500 low luminosity run (12x12) was not low luminosity –Usually we try to get a very low luminosity run to calibrate our calibrations –This year we will have to calibrate the calibration run –Not to mention that the magnitude of the distortions in the physics runs will be larger than ever before The TPC is supposed to last another 10 years –One constraint: HFT takes its first data in Run 14 –Data taking sequence is 3-5 years long … run 14, 15, 16, 17,18 At some point we, as a collaboration, may decide that it is prudent to manage the luminosity of the beams –Manage the luminosity –Manage the trigger rates –Not an exact science What happens if we run the TPC until it melts? –The anode wires are the most likely component to wear out –We can replace them –Not clear that we can predict, in advance, if and when this will be necessary

10 STAR TPC Winding new grids Also an opportunity to rebuild the ABDB boards which may account for some or all of the HV tripping The STAR TPC should last a long time. However, the option to replace the wire grids on the endcaps of the TPC is an extremely valuable contingency for us. See talk by A. Lebedev

11 STAR TPC More expensive options GEM Foil readout –GEM foils do not suffer from aging on our scale of activity –Opportunity to remove ABDB boards from the system –Use of the existing pad plane would mean that spatial resolution would be degraded. GEMS are a point source of charge and don’t diffuse across several of our pads. –A new pad plane in each sector would be very expensive –Using the current electronics may be impossible due to change in polarity of the signal (?) –We should look into this option in more detail … but no doubt it will be quite expensive and would take STAR offline for at least a year.

12 STAR TPC Wire Aging isn’t the only issue Wire aging isn’t the only issue with respect to predicting whether the STAR TPC will last for another 8 to 10 years –A drop in gain of 10% is not catastrophic, even 20% is OK on the inner sectors HV Channel tripping is important, too. –HV channel tripping is a show stopper –We cannot run if the frequency of trips exceeds the recovery time –Too many trips causes permanent damage to the TPC. For example this years pp500 run has caused 1 HV channel to fail and at least one more will not reach full voltage. –HV trips may not be related to wire aging … it could be hardware inside the TPC that is breaking down (e.g. ABDB boards) Finally, let me finish my talk with a few good words about our manpower

13 STAR TPC TPC Manpower - Hardware Hardware –Alexei (BNL), Dana (BNL), Jim (LBL), Howard Wieman (The Temple Mount) –Blair does answer … but is anxious to preserve his retired status Gas System –Leonid Kotchenda (MePhi) [Alexei, Dana, Jim … in training for Lite duty] Interlocks –Jim Water –CAD, Alexei, Soja (BNL) Slow controls & Computers –Yuri Gorbunov (Creighton) & Wayne Betts(BNL) Electronics –STSG – Padrazo + Crew, Tonko, Jeff Landgraf, Bob Scheetz (BNL) Laser –Alexei

14 STAR TPC TPC Manpower - Software Pad Monitor –Jo Schambach (UT) has plans to upgrade the old pad monitor –Will require continuing support: new features, formats change … –Jeff arranged a test last year, Blair was able to see DAQ1000 files Bad Pad/Gain file –Tonko, Jeff Calibrations for Drift Velocity, dE/dx, etc. –Richard Witt (Naval Academy), Yuri (BNL), Patricia Fachini (BNL) Calibrations for Grid leak, Space Charge, Shorts etc. –Gene (BNL), Jim, Hao Qiu, Joe Seele, Grant Webb New Fast Tracker for Fast Offline –Hao Qiu (Lanzhou & BNL) + Zhangbu + Yuri

15 STAR TPC Manpower Issues Same old faces … some are wearing out –Many of these folks would like to move on to new frontiers New faces –The Spokesman’s Office has been very good about recruiting young people (esp. for calibration work) –We also need some senior faces, and people who don’t rotate so fast Slow Controls –DAQ 1000 is only one of the new systems joining STAR this year –STAR is always under-staffed in this category. Creighton does heroic work … but its only a small group … additional manpower would help ensure STAR’s future

16 STAR TPC TPC Meetings – weekly, on Wednesday TPC mailing list is very active TPC web pages – –Gene’s record of recent calibration activities – –Perhaps easier to locate via ‘experiment’ ‘sub-system’ on the STAR homepage –Hardware documentation –Procedures – expert and operator instructions Weekly TPC meetings –Coordinated by Richard Witt –Regular attendees include – Gene, Yuri, Alexei, Richard, Hao, Jim, Joe, and Grant –Additional participants are welcome!

17 STAR TPC Conclusions The TPC has performed well in 2009 –pp500 … 10 C deposited on the inner sectors in only 6 weeks –pp200 … probably another 10 C deposited on the inner sectors We are exploring new territory with the pp500 run plan –We have successfully found a strategy to deal with Luminosities up to 6 x The collaboration has run plans that will push these limits even higher –Wire aging isn’t the only hardware issue. HV channel trips may be the greater problem and the cause of these trips may not be directly related to wire aging. We have several options … including deferring some of our run plans … but only modest amounts of time to do R&D We must choose which options to pursue with care and wisdom