Solar Probe Plus FIELDS Glaser – ME Slides for Quarterly July 18, 2013.

Slides:



Advertisements
Similar presentations
Injection Molding MFG 355.
Advertisements

Solar Water Heating.
SPP Fields Antenna TRL6 Review Pre-PDR Mechanical Design Jeremy McCauley SSL UCB 7/18/2013 Current Configuration: SPP Spacecraft FIELDS, SPP-ANT-MEC-000.
Introduction Objective is to create a field deployable automated CO 2 and N 2 O gas trapping device Trapping events occur every four hours Traps replaced.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Instrumentation: ground and noise Temperature Measurement.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
Solar Panels: Our Challenge
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 23 June Sam Burke UCSB HEP Group.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
SPP FIELDS V5 Antenna Mechanical Peer Review David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
SPP FIELDS V5 Antenna Mechanical Peer Review Draft 2 David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
LUMI 1 LUMI Mechanical Design Details Bill Ghiorso.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
M. Diaz-AguadoFIELDS iPDR – Thermal Solar Probe Plus FIELDS Instrument PDR Thermal Subsystem Millan F. Diaz-Aguado SSL Berkeley
Paul TurinFIELDS iPDR – TRL6 1 SPP-FIELDS TRL 6 Testing Paul Turin
NEXT100-PMT System Requirements pressure resistance 15.4 barg ext press. pressure isolation (window break)
Dogleg Thermal Tests : Configuration 7 6 AiN plate side Jan SM+LB 8 Dogleg side Heater (0.4W) flow 2 Temperature sensors located.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 1 The mechanical engineering design of the Mk II emittance measurement.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
Solar Probe Plus FIELDS Team Meeting Management Items 08/05/2014.
1 Nanosat-5 Progress Report 26 February Structural / Design Tenant Design Review ( ) –Rounds changed to 1/8 th inch (.4 cm) Applies to isogrid,
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
TRIO-CINEMA 1 UCB, 2/08/2010 Solar Array Kevin Jenkins Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Collab Store 6/6/07 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM June.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
July 18, SPP-FIELDS Thermal Path to TRL 6 M. Diaz-Aguado.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Chris Pasma, SSL Mechanical.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
Wayne, The upper and lower guides are now small enough in mass so they can be made directly from the CAD models by stereolithography, and at a reasonable.
Unique Properties of the Earth. 1. Due to the location in the solar system the Earth is not too hot and not too cold… it’s just right for life.
PXIE RFQ Status RFQ Fabrication Summary Module 2 bead pull test complete (Timer will give a talk next). Vane machining continues. We are.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Agenda for 3/3/17 Heat Energy Notes Heat Problems
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
FIELDS Mission Assurance Manager University of California, Berkeley
Thermoelectric Modules (TEM)
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
FIELDS V1234 Thermal Vacuum & Balance Tests iPER Draft
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
ERMC/RMM activities May 2017
MICE Coupling Coil Update
GLAST Large Area Telescope:
Valve stem “gag” mechanism
Braze Test.
SNS Coupler Shipping Plans
BIRDS-4 Computer Aided Drawing (CAD)
Discard “Old” Gasket Remove original gasket
Polarized 3He target installation
Presentation transcript:

Solar Probe Plus FIELDS Glaser – ME Slides for Quarterly July 18, 2013

FIELDS Personnel Change 2 Jeremy McCauley has moved to the ICON project David Glaser is the new FIELDS Mechanical Engineer Transition will take place over the next month

V1-V5 Antenna Mounting 3 Basic Design Finished for Stowed Mid-Antenna and Antenna Tip Mid Mount is a Monopod Forked Tip Mount

Breadboard Test 4 All Parts for Breadboard Model to be Fabricated by 7/31 Assembly and Deployment Testing in August Fixtures Being Made for FWB Torque and Temperature Tests Breadboard CAD Model

TTM Test at SAO SES All Parts Out for Fabrication – Hottest region thermal isolators will be sapphire Testing Planned for Late August 5 SES TTM CAD Model Niobium Shield Shadow/ Cooling Block Whip Segment Absorber Plate Incident Radiation Thermal Choke Region Thermal Isolation Region Ti Shield Clamp

Anomalous Melting on TTM in PROMES test Anomalous Melting in Ti Clamp and Stainless Screws Occurred in PROMES TTM Test – Suspect Interaction Between Silver Plating on Screws and other metals Need to Retest without Silver Present 6 Deformed Tapped Hole in Ti Melted Ti Flowed Over Ceramic Isolator

Vacuum Oven TTM Test Purpose: to bring Ti parts to flight temperatures without the presence of silver Using Spare TTM from PROMES Location: Vacuum Process Engineering, Sacramento Testing Planned for Week of 7/29 7

Antenna Capacitance Test All Parts Being Fabricated Assembly in Early August, 2013 Test to be Completed End of August, Capacitance Test Model