Introduction to new projects relevant for the IPPC review - Advisory Group 26 October.

Slides:



Advertisements
Similar presentations
The Industrial Emissions Directive (IED) 2010/75/EU
Advertisements

Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
The IPPC Recast. New environmental requirements for explosives production sites.
Grupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej Fot: U. Czapla Practical aspects of compliance with the Integrated Permit requirements based.
European Commission, DG Environment Brussels, 05 April 2006 Screening of chapter 27 - Environment Dr. Violeta Vinceviciene European Commission DG Environment.
1 Towards an improved policy on industrial emissions - Impacts on the waste management industry - Marianne Wenning European Commission, DG ENV.C.4 FEAD.
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
Implementation of IED Implications for industry, particularly those involved in waste management, and the influences it has on permitting Dynes Solicitors.
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
The Industrial Emissions Directive (IED) 2010/75/EU Gabriella Gerzsenyi & Menno Verheij European Commission, DG Environment Industrial Emissions Unit 03.
An overview of the industrial emissions Directive Richard Vincent Head of Industrial Pollution Control Department for Environment, Food and Rural Affairs.
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
IPPC Directive state of play and future developements
Review of practice of ELVs and other conditions setting in EU member states for non-Annex I installations Valts Vilnītis.
EPER reporting process in Hungary with emphasis on the experiences Edina Gampel Counsellor National Inspectorate for Environment, Nature and Water Budapest,
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
The Industrial Emissions Directive (IED) 2010/75/EU Gabriella Gerzsenyi & Menno Verheij European Commission, DG Environment Industrial Emissions Unit 03.
1 “Establish immediately a mechanism, including an internet website, through which a resident of, or small business in, any State may identify affordable.
1IndustrialEmissionsDirective. 2 The European Parliament is discussing the Industrial Emissions Directive as adopted by the Council for the second reading.
1 Review of the Integrated Pollution Prevention and Control (IPPC) and National Emission Ceilings (NEC) Directives Marianne Wenning DG ENV, Head of Unit,
FEAD ANNUAL CONFERENCE 2008 Future Challenges for the Waste Management Industry Paris, 19 September 2008.
Community Resources Assessment Training 4-1. Community Resources Assessment Training 4-2.
3rd BERCEN Exchange Programme, Prague WASTE CONDITIONS IN ENVIRONMENTAL PERMITS Mrs. Marianne Lindström, Finnish Environmental Institute,
David Morgan, CPI, Presentation to xxxxxx, 28 March 2008 IED Joint Seminar, Imperial College Sept 11 David Morgan, CPI, Presentation to xxxxxx, 28 March.
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
BERCEN plenary meeting Sofia, March 18, 2005 Agenda item 8 Draft Scope and Proposed Location of BERCEN Training 2005 BERCEN Secretariat.
The EU Bioeconomy Observatory ERRIN Bioeconomy WG Meeting 19 th December 2013 Brussels, Belgium Damien PLAN JRC Unit A2 Scientific support to Innovation.
IED, BAT and Derogations Richard Wood URS Leeds 22 nd May 2013.
Page 1 Annexes of the Directive 96/61/ES on IPPC Agency on Integrated Prevention Ms. Lucie Svobodová Integrated and Planned Enforcement of Environmental.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
SWWMG: September 2015 LEGISLATION UPDATE. UPDATES  Hazardous waste  Duty of Care  Fire Prevention Plans.
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
Creating the environment for business Streamlining industrial emissions legislation Caspar Corden (Entec) Andrew Farmer (IEEP) IPPC Review Advisory Group.
Large Combustion Plants Ex-post assessment of the LCP Directive Initial ex-ante evaluation of the IED – Chapter III and BAT Daniel Martin-Montalvo Alvarez.
The current legal situation
Presentation to WRI-UNEP Meeting Building Connections for Sustainable Building And Construction by Iddo Wernick October 2, 2003.
1 Review of the IPPC Directive and related legislation Second Meeting Of Working Group E On Priority Substances 17 October 2007 Filip FRANCOIS – DG ENV.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
1 Overview of the Proposal for a Directive on industrial emissions (IPPC) Keir McAndrew - European Commission, DG ENV.C.4 - Industrial Emissions, ozone.
13 juni 2016 © 2008, VITO NV – alle rechten voorbehouden Assessment of use of general binding rules for implementation of IPPC Directive General binding.
This Project is funded by the European Union Project implemented by Human Dynamics Consortium 11 TH STEERING COMMITTEE MEETING BELGRADE, 24 TH JUNE 2015.
IPPC Permit Procedure in the UK Kiev, 26 January 2011 Alex Radway Senior Advisor Environment Agency for England & Wales, United Kingdom.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
IPPC Member Consultation 1 July to 1 December 2013
First position of the Belgian industry about the
Belgian Presidency of the European Union
Content of the presentation
Streamlining of Industrial Emissions Reporting
Secondary Wastes Methods of data compilation and the effects on the comparability of results THE CONTRACTOR IS ACTING UNDER A FRAMEWORK CONTRACT CONCLUDED.
Time table for revision of the NECD
The IED: Industrial Emissions Directive DG ENV. C
Effects of the point of measurement on the comparability of the data on waste treatment Methods of data compilation and the effects on the comparability.
INSPIRE fitness for purpose – Analysis
Karl Vrancken – VITO Advisory Group Meeting 8 December 2006
IPPC Directive Discussion on Reporting on ELV and BAT 4th Reporting Questionnaire, Q. 6.1 IEEG meeting 7 December 2010.
Jacques Delsalle Clean Air and Transport Unit DG ENV
with emphasis on data comparability
Meeting of the IPPC Advisory Group 8 December 2006
Expert Advisory Forum on priority substances
IPPC Review Stakeholder Hearing
Advisory Group Meeting Presentation of Draft Final Report
Development of guidance for each activity covered by the VOC Solvents Emissions Directive (1999/13/EC) N.B. This presentation reflects the initial proposal.
Reduction of total releases from unintentional production of POPs
WG C Groundwater Mandate and activities
Towards an improved policy on industrial emissions Third Meeting Of Working Group E On Priority Substances 3 March 2008.
Introduction to the first meeting of the IPPC Review Advisory Group
DG ENV C3 Industrial Emissions, Air Quality and Noise 20 January 2012
IPPC Review Stakeholder Hearing 4 May 2007
Presentation transcript:

Introduction to new projects relevant for the IPPC review - Advisory Group 26 October

Four new studies to introduce Data gathering - part 2 Data gathering - waste General binding rules MS implementation reports

Two further data gathering and impact assessment projects l Build on the present data gathering contract, same team l Problem assessment, option definition, information gap analysis, data gathering, impact assessment l Work just launched – detailed presentation at next Advisory Group l Final reports around July 2007

Data gathering part 2 - topics l Possible changes to current Annex 1 definitions u Sections 2.4 (ferrous metal), 3.5 (ceramics), 4 (biological processing), 6.4(b) (food and drink) l Possible additions to Annex 1 u Gasification/liquefaction, primary wood products, wood preservation, coal fuel products, independent industrial WWTPs, shipyards l Other u Soil protection provisions (follow-up to soil strategy) plus up to two other

Data gathering – waste topics l Possible revision of current waste activity definitions l Possible addition of new waste activities Significant env. impact:Unknown impact: Biological treatment of organic waste Pre-treatment of combustible waste for co- incineration Sorting of Construction/Demolition waste Off-site treatment of slags and ashes for recycling Recycling of sludges Mechanical recycling of plastics Chemical recycling of plastics Recycling of wood Recycling of rubber Recycling of minerals Scrap metal preparation Recycling of edible oils/fat Recycling of gypsum

Assessment of use of general binding rules l Main Objective: gain better understanding of where and how GBRs are used u Description per MS, per sector, per medium u Why used or not used l For selected GBRs, further study of u Legal status, conditions covered, industry and geographic coverage, method of development including consideration of BREFs, method of application including possible deviation, costs l Contract to start before the end of this year – draft final report around November 2007

Assessment of MS implementation reports l Contract to analyse MS’ 2 nd implementation reports (due end Sept; 14 received to date) - main objectives: u Look at and compare responses and provide summary information on issues such as implementation approach, no. of permits, etc u Develop database on implementation, to be made publicly available u Analyse information on ELVs as input to cement/lime and iron/steel BREF reviews l Contract to start before the end of this year – final report around December 2007

More information Technical annexes on Commission website The two new data gathering projects are looking at specific amendments; data collection will again be managed via circa