Technology & Curriculum Building & Grounds January 8, 2015.

Slides:



Advertisements
Similar presentations
Project Save Energy at School Gimnazija Murska Sobota.
Advertisements

Cathedral of the Immaculate Conception Project Information Session.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Re-commission 5 Buildings Goal 2012 Lighting Upgrades VFDs Historic Weather Extremes Boiler Efficiency Free Cooling AHU Schedules.
Sustainability Advocates Program New Advocates Training April 7, 2009 ENERGY AT NYU.
UNDERSTANDING THE IMPORTANCE OF A VOTER APPROVED PPEL FOR SWG CSD STUDENTS, FAMILIES AND COMMUNITY Physical Plant and Equipment Levy 1.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Current Project Update October 25th 2012 Good Evening!!!
Capital Project Presentation As approved through formal resolution by the RCS Board Of Education on March 11,2015. This new presentation outlines the $750,000.
 Mechanical  Electrical  Safety/Security  Video surveillance  Fire safety  Access control  Enhanced Programming  Roofing/Structural/Site Work.
District Energy Initiatives 1/23/2012
Christian Academy of Lawrenceburg Strategic & Infrastructure Investment Plan Christian Academy of Lawrenceburg Strategic & Infrastructure Investment Plan.
Hingham Public Schools Preliminary Budget Information FY 2016 Service and Facilities January 12, 2015.
Supporting the 21 st century Technology Student The state of technology at Berlin Township Schools Joel Brown, Technology Coordinator.
Decatur School Board Meeting August 19, Decatur Superintendent’s Report August 19, 2013.
Leadership in Environmental Stewardship in a Fiscally Prudent Manner WAUKESHA COUNTY SUSTAINABILITY EFFORTS.
2013 FINANCIAL REPORT. Balance Sheet Summary As of December 31, 2013.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Franklin County Technical School Performance Contract Project.
Trane’s DOE GHP Super ESPC Fort Knox Energy Program
Houston Independent School District John F. Kennedy Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS The John F. Kennedy Elementary School is a replacement.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
School District of Fort Atkinson Dennis Kuchenmeister Director of Buildings & Grounds Green School National Network.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
November 6 th Referendum Information School District of Horicon.
2012 Planned Facilities Reconstruction Project. Planned Facilities Reconstruction Health & Life Safety Energy Conservation & Management Security Upgrades.
Timeline Resource purchasing Textbooks E2T2 Grant Infrastructure Google Apps Literacy Aid Menahga High Five Implementation History.
Green Building Demonstration Project Adam Saling City of San Diego.
Performance Measures Darien Senior Center Susan M. Swiatek, CPRP Elizabeth M. Paris January 23, 2010.
Budget Development Time Line September 2011Budget data collection begins December 2011 – March 1, 2012 CSA, BA, & BOE Finance Committee develops budget.
Robbins Park Design By: Abby Toll, Gio Bradley, and Jakob Seeber.
Resource Efficient Development Geos Neighborhood Developer: Norbert Klebl Feb 19, 2010.
NOW, to what we have already achieved… We have a new roof on sanctuary and ground work to prevent prior water issues…..
DEDHAM PUBLIC SCHOOLS FY 2008 Approved FY 2009 Approved FY 2010 Approved Education Technology Program 275, Roof Replacement - High School750,
 Presented by:  Lisa Breaux  for Lamar University  EDLD 5362  Information Technology Systems May 13, 2012.
…BUILDING THE FUTURE THROUGH OUR CHILDREN! WE’VE BEEN BUSY SINCE 2005! * Built on to the H.S./M.S. * Replaced 4 roofs * Upgraded our Heating Systems*
CTRA Green Features. 1. Green Roof 2. Hot Water Solar Heaters These are a type of solar panel. It is called evacuated tube collectors and they heat our.
SUMMER 2015 DEFERRED MAINTENANCE
ITALY How do we save energy?.
The Bases of Energy: forms, units and efficiency
FOSSIL FUELS By: Sam, Leah, Liber, Jock, and Johnny.
Alma School Referendums Tuesday, April 7, Questions on the Ballot Question # 1: INITIAL RESOLUTION AUTHORIZING ISSUANCE OF GENERAL OBLIGATION BONDS.
Energy Conservation Building Upgrades Alma School District.
MSAD # 52 Energy Savings Performance Contract May 4, 2016 Upgrading our School Facilities and Reducing Energy and Maintenance Costs Utilizing Performance.
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
The Benefits of Section 63 Siobhan Wolverson Senior Environmental Planning Consultant VG Consulting.
Digital Conversion Plan We Connect Students.
Planning for “capital” levy and future “capital” bonds What do you think? CRC staff meeting October 6, 2015 Everett Public Schools 1.
SINKING FUND PROPOSAL OCTOBER 3, SINKING FUND ADVISORY COMMITTEE PURPOSE: DEVELOP A LIST OF RECOMMENDED PROJECTS FOR THE 2012 SINKING.
Proposed 2013 Bond A Smart Plan For Continued Excellence In The Dearborn Public Schools Proposed 2013 Bond A Smart Plan For Continued Excellence In The.
Facilities Focus Group
Cuba-Rushford CSD Capital Project
Bond Project Update September 2017
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
JOHN A. HOLMES IMMEDIATE FACILITY NEEDS
Cornwall Central School District
Fall 2017 Update: Physical properties and sinking fund
Greenbush Middle river School District
Fort Cherry School District
UNION GROVE ELEMENTARY REFERENDUM
The summer of 2018 and all the work that has taken place
Loudenslager Elementary School Pointing and Brick Repair.
Community Life at St. Giles
Recent Bond Accomplishments
Stoughton Public Library
Portville Central School District
Presentation transcript:

Technology & Curriculum Building & Grounds January 8, 2015

Technology A Technology Study was taken in May 2014 by Innovative Educator Consulting – Naomi Harm – Upgrade WiFi Infrastucture – Quality Mobile Teaching and Learning Devices – 5-7 iPads for PreK-Grade 3 – 5 Desktop Computers for PreK-Grade 3 – Chromebooks for Grades 4-12 – Google Apps for Education – Staff & Grades 4-12 – Upgrade Computers for All Staff – Smart Board for All Classrooms

Changes Necessary to Implement Technology Updates – New Network Servers – Comprehensive Filter and Firewall – Staff Training

Building & Grounds Energy Efficiency – Heating Plant LP Gas Boiler -- Geo-Thermal Efficient Room Uni-Vents Steam Heat to Hot Water – Significant savings as steam requires 220 degrees F as compared to hot water heat which can be effective at temperatures as low as 120 degrees F. Digital Controls (currently using 62 year old pneumatic) – Time of day, room occupancy, different temperature setting

Building & Grounds – Building Changes for Energy Efficiency Thermal Pane Windows - Replace old windows as was done in 1987 (current windows are single pane) Lighting Motors

Maintenance & Upgrades Roofing – Most areas are good for years – An area equal to ½ of the elementary school area is due for replacement within the next two years. Parking Lot – Repair cracks & re-seal

Maintenance – Replacement & Repairs Flooring – replace original 1952 flooring in 4 classrooms. Update Family & Consumer Ed Room Dust Collection System in Shop Elementary Windbreak Entrance New Gym Windbreak Entrance Paint Building Kitchen Dishwasher System

Transportation – 2 buses to be replaced within next 3 years – 1 van to be replaced

Area School Tax Levies through