VELO upgrade: Requirements for Physics Performance 6/14/2016 LHCb VeloPix Module Kickoff Meeting 1 LHCb VELOPix Module Kickoff Meeting Nikhef – November.

Slides:



Advertisements
Similar presentations
LHCb Alignment 12 th April 2007 S. Viret Coseners Forum « LHC Startup » 1. Introduction 2. The alignment challenge 3. Conclusions.
Advertisements

LHCb Upgrade 09/09/091 Paula Collins (CERN) On behalf of the LHCb collaboration LHCb on the eve of the LHC LHCb upgrade The physics programme NP opportunities.
Overview of the LHCb experiment Status and Results
Medipix and Timepix chip developments
0 25. Sept 2006 M.Smizanska, Lancaster University, UK LHC preparations for precise measurements of muonic very rare B-decays 25. Sept 2006 M.Smizanska,
7 Nov 2002Niels Tuning - Vertex A vertex trigger for LHCb The trigger for LHCb ….. and the use of the Si vertex detector at the first and second.
27 th June 2008Johannes Albrecht, BEACH 2008 Johannes Albrecht Physikalisches Institut Universität Heidelberg on behalf of the LHCb Collaboration The LHCb.
LHC SPS PS. 46 m 22 m A Toroidal LHC ApparatuS - ATLAS As large as the CERN main bulding.
1 Measurement of f D + via D +   + Sheldon Stone, Syracuse University  D o D o, D o  K -  + K-K- K+K+ ++  K-K- K+K+ “I charm you, by my once-commended.
6 th International Conference on Hyperons, Charm and Beauty Hadrons July 2, 2004 Rare B Decays at LHC Sébastien VIRET Laboratoire de Physique Subatomique.
Description of BTeV detector Jianchun Wang Syracuse University Representing The BTeV Collaboration DPF 2000 Aug , 2000 Columbus, Ohio.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Recent RD50 studies have shown that silicon irradiated at these levels still delivers a signal of ~ 8ke - / MIP LHCb upgrade rationale. After collecting.
Jeroen van Hunen The LHCb Tracking System. May 22, 2006 Frontier Detectors for Frontier Physics, Elba, Jeroen van Huenen 2 The LHCb Experiment LHCb.
1 Performance of the LHCb VELO Outline LHCb Detector and its performance in Run I LHCb Detector and its performance in Run I LHCb VELO LHCb VELO VELO performance.
Future b and c experiment with hadron machine Tomasz Skwarnicki Representing LHCb collaboration.
Chris Parkes First results from the LHCb Vertex Locator Act 1: LHCb Intro. Act 2: Velo Design Act 3: Initial Performance for LHCb VELO groupVienna Conference.
M. Adinolfi - University of Bristol1/19 Valencia, 15 December 2008 High precision probes for new physics through CP-violating measurements at LHCb M. Adinolfi.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
1 Performance Studies for the LHCb Experiment Performance Studies for the LHCb Experiment Marcel Merk NIKHEF Representing the LHCb collaboration 19 th.
DIS 2004, Strbske Pleso,April LHCb experiment sensitivity to CKM phases and New Physics from mixing and CP violation measurements in B decays LHCb.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
Pavel Krokovny Heidelberg University on behalf of LHCb collaboration Introduction LHCb experiment Physics results  S measurements  prospects Conclusion.
LHCb VErtex LOcator & Displaced Vertex Trigger
Study of exclusive radiative B decays with LHCb Galina Pakhlova, (ITEP, Moscow) for LHCb collaboration Advanced Study Institute “Physics at LHC”, LHC Praha-2003,
1 1 The LHCb Upgrade Outline LHCb Detector LHCb Detector Selected Physics Results Selected Physics Results Upgrade Plans Upgrade Plans Summary Summary.
LHCb Accomplishments S. Stone 1 NSF, Nov. 5, 2013 & Future Physics.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
ATLAS B-Physics Reach M.Smizanska, Lancaster University, UK
LHCb: Xmas 2010 Tara Shears, On behalf of the LHCb group.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
LHCb Vertex Detector and Beetle Chip
1 Marina Artuso Syracuse University For the LHCb VELO Group 7/29/2008 Marina Artuso Vertex 2008 LHCb Vertex Detector Upgrade Plans.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
The LHCb Vertex Locator Lars Eklund LHCb VELO Group of the LHCb Collaboration CERN (Geneva), EPFL (Lausanne), NIKHEF (Amsterdam), University of Glasgow,
31/08/09 LHCb Upgrade – Paula Collins 7 th International Hiroshima Symposium 1 1 Paula Collins (CERN) On behalf of the LHCb and Medipix/Timepix collaborations.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
A novel approach to detector calibration parameter determination and detector monitoring Eduardo Rodrigues On behalf of the LHCb VELO Group CHEP 2010,
1 The LHCb Upgrade Outline LHCb Detector LHCb Detector Selected Physics Results Selected Physics Results Upgrade Plans Upgrade Plans Test beam campaign.
3 May 2003, LHC2003 Symposium, FermiLab Tracking Performance in LHCb, Jeroen van Tilburg 1 Tracking performance in LHCb Tracking Performance Jeroen van.
Technological advances for the LHCb upgrade Marina Artuso Syracuse University.
Beauty and charm at the LHC, Jeroen van Tilburg, FOM Veldhoven 2014 Jeroen van Tilburg Beauty and charm at the LHC: searches for TeV scale phenomena in.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Performance of the LHCb Vertex Locator Thomas Latham (on behalf of the LHCb VELO group) 11/06/20111TIPP Chicago.
Open and Hidden Beauty Production in 920 GeV p-N interactions Presented by Mauro Villa for the Hera-B collaboration 2002/3 data taking:
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
Developing Radiation Hard Silicon for the Vertex Locator
Tracking detectors/2 F.Riggi.
The LHCb Upgrade LHCb now Upgrade motivation New trigger and DAQ
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
David B. MacFarlane SLAC EPAC Meeting January 25, 2006
Simulated vertex precision
Strawman module design
Measurement of the phase of Bs mixing with Bs ϕϕ
TIMEPIX TESTBEAM TELESCOPE FOR AIDA
LHCb Upgrade – P Collins Beauty 09, Heidelberg
The LHCb Upgrade Outline LHCb Detector Selected Physics Results
The LHC collider in Geneva
Niels Tuning (Outer Tracker Group LHCb)
The LHCb vertex detector
Overview of LHCb Poland Ukraine Brazil UK Switzerland France Spain
LHCb Particle Identification and Performance
8th International Conference on Advanced Technology and
B Physics at the LHC Neville Harnew University of Oxford.
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
LHCb Trigger LHCb Trigger Outlook:
The LHCb VErtex LOcator
The LHCb Front-end Electronics System Status and Future Development
First results from the LHCb Vertex Locator
Presentation transcript:

VELO upgrade: Requirements for Physics Performance 6/14/2016 LHCb VeloPix Module Kickoff Meeting 1 LHCb VELOPix Module Kickoff Meeting Nikhef – November 9 th 2009 Paula Collins

LHCb: The “Day 1” Experiment Mass resolution: 14 MeV Time resolution: 40 fs IP resolution: /p T  m PID over GeV ~ bb pairs produced per year Trigger goes from 40→1 MHz in hardware, then to 2kHz in software 6/14/ bb production correlated and sharply peaked forward-backward Single-arm forward spectrometer : mrad σ bb ~ 500 µb in LHCb acceptance Production of B +, B 0, B, b-baryons.., LHCb (will) run at L = cm -2 s -1 by not focusing the beam as much as ATLAS and CMS maximizes probability of a single interaction per crossing LHCb will go immediately to design luminosity LHCb in numbers LHCb VeloPix Module Kickoff Meeting

To extend the physics programme, why not just turn up L ? LHC is (will be) capable of delivering to LHCb ~50% of the L delivered to the GPDs – would be more than good enough! Baseline scenario: increase our luminosity from to 2x10 33 cm -2 s -1  Crossings with ≥ 1 interaction 10 MHz → 30 MHz  Average number of interactions per crossing 1.2 → 4.8  Spillover: increases linearly with L Compatible with SLHC I high x I low scenario 6/14/2016 BUT, it’s all about the trigger! Level-0: Largest E T hadron, e(  ) and  1MHz read-out rate is currently the bottle neck in the system  channels: yield proportional to L Hadronic channels: If we increase L we have to increase our E T cut and there is no net efficiency gain! Our current 2.5 us latency is inadequate for a trigger decision of this complexity LHCb VeloPix Module Kickoff Meeting 3

LHCb upgrade strategy = Move to a full software trigger 6/14/ The consequence: Read out all sub-systems at 40 MHz Replace all FE-electronics; all silicon modules, RICH-HPDs, FE boards of Calorimeter, Outer Tracker FE LHCb VeloPix Module Kickoff Meeting Trigger uses ALL event information, reconstructs all primary vertices, and can cut on p T for high i.p. Preliminary studies show that the hadron efficiency will improve by ~2, and yield will be proportional to L Increase in statistics x20 for hadronic channels and x10 for leptonic channels This gives the additional flexibility to adapt to the physics landscape in the next decade The idea The consequence Aim to operate at L = Perform entire trigger on CPU farm with input rate 30 MHz Goal is to double trigger efficiency for hadronic channels and make the yield scale with luminosity All subsystems must be fully read out at 40 MHz Replace most FE electronics, silicon modules, RICH HPDs, FE boards of calorimeter and outer tracker Case study: B s   (after HTL1) L = 2x10 32 cm -2 s -1 E T > 3.5 GeV   ≈ 22% Min.Bias retention 10 kHz L = cm -2 s -1 E T > 2 GeV   ≈ 45% Min.Bias retention 28 kHz

VELO: Current Design 6/14/2016 LHCb VeloPix Module Kickoff Meeting 5  2 retractable detector halves:  7 (37) mm from beam when closed (open)  21 stations per half with an R and  sensor  Operated in secondary vacuum  300μm Al foil separates detector from beam vacuum  Bi-phase CO 2 cooling system 5 RF foil modules Base Kapton cables Cooling manifold 5

VELO sensors 6/14/2016 LHCb VeloPix Module Kickoff Meeting 6 6 Ф measuring sensors:  2 regions  Short/long strips  Pitch=36-97μm  Stereo angle. 6 silicon edge just 7 mm from beam! R measuring sensors:  45 o quadrants  Pitch=40-102μm 512 strips 512 strips 512 strips 512 strips 683 inner strips 1385 outer strips 300  m n in n strip sensors (Micron Semiconductor) Double metal layer for signal routing

6/14/2016 LHCb VeloPix Module Kickoff Meeting 7 7 Operating up to ~120 fb -1 Flux: 0.8x10 14 n eq cm -2 per fb -1 TID (Electronics): 3.7 MRad per fb -1 at tip = 7mm 7 Upgrading the VELO: Irradiation issues Radius (cm) Dose after 100 fb -1 n eq cm -2 x TID (MRad) After this 900V we expect 102 uA / cm -2 at -25 o C CCE of ~ 8.5 ke - Thermal runaway at the tip is the issue tip of current VELO T. Affolder TIPP 09

6/14/2016 LHCb VeloPix Module Kickoff Meeting 8 8 Upgrading the VELO: Bandwidth The occupancy is relatively low, but at 40 MHz the data rates are enormous Rough estimate gives 5 Gbit s -1 per FE for current design Minimum of 1400 optical links needed for whole detector Clustering issues become very important for getting the data off-chip 8 Radius (cm) Particle Hits / Event / cm 2 Averaged over all sensors L = L = L = L = a  b  Dedicated R&D needed on High speed copper cables within tank Feedthroughs/PCBs

6/14/2016 LHCb VeloPix Module Kickoff Meeting 9 Radius of first measured point (mm) Original layout Effect of removing 10 stations The global constraint is the ~1.2 m length of the vacuum tank From our previous studies we know that the impact parameter resolution is well described to first order by 9 Upgrading the VELO: design issues Keep down material before the second measured point High momentum tracks: keep the first measured point as precise as possible (i.e. fine pitch and good position information Keep the extrapolation distance as small as possible: Many stations Curved inner shape Minimum inner radius Edgeless technology an advantage Remember though the radiation at the tip Behaviour of impact parameter resolution as VELO material is increased Behaviour of impact parameter resolution as foil material is decreased

10 Material Budget and Resolution Several issues regarding Material/Resolution are still on the table What is required for physics performance? X 0 and  will affect IP, P resolution and efficiency. Critical quantities are: The total amount of material before the second measured point Foil + station tip thickness The total amount of material in front of the rest of LHCb (secondaries, pattern recognition in RICH, ghost rate for strips) Station thickness, number of stations directly affects our acceptance. For example, Bs->DsK would have a reduction by 30% for a of 6% 10 Slope of this line ~ sqrt(material) Currently material = 2.3% foil + 0.6% silicon Also ~ - inner dimension very important - number of stations very important Also small effect from resolution High momentum part affected by resolution. After irradiation this will go binary and be given by the pitch 6/14/2016 LHCb VeloPix Module Kickoff Meeting

116/14/2016 LHCb VeloPix Module Kickoff Meeting 11 Ghost rate study in the VELO: Impact of material on ghost rate (for strips) Vladimir Gligorov Material Budget and Ghost Rate

6/14/2016 LHCb VeloPix Module Kickoff Meeting 12 Material Budget and Impact Parameter Resolution Varying Velo ThicknessVarying Foil Thickness

136/14/2016 LHCb VeloPix Module Kickoff Meeting 13 TIMEPIX Material Estimate: -150  m silicon + ASIC ~ 0.3% -100  m Aluminium ~ 0.2% -200  m Diamond ~ 0.2% -TOTAL ~ % per station (single layer) 21 stations as current VELO 8W per station datarates ~ 50 particles per event per station ~ > 60 Gbit/s/station Number of hits per track z of first measured point (compared to VELO with inner radius of 8 mm..)

Summary of Requirements Match 250 x 300 mrad LHCb acceptance Survive (or half survive and be replaced) upgrade irradiation levels Out gassing within range Provide a vertex trigger with acceptable timings For the pixel option, positioning accuracy is “relaxed” (what we have now probably is good enough) Material must be kept low. 1% OKish, but 30%. 6/14/2016 LHCb VeloPix Module Kickoff Meeting 14

Backup 6/14/2016 LHCb VeloPix Module Kickoff Meeting 15

6/14/2016 LHCb VeloPix Module Kickoff Meeting 16 July-August 2009: Dedicated Timepix Telescope A telescope was constructed with 6 double angled (at 9 o ) planes. 4 Timepix and 2 Medipix sensors were used. The DUT (in this case another Timepix chip) position and angle can be controlled by a stepper motor to reduce the number of interventions Thanks to our colleagues from the CMS SiBT and the EUDET-Spider collaboration who enabled us to run in the H6 and H8 120 GeV pion beams 6 plane timepix/Medipix telescope DUT

6/14/2016 LHCb VeloPix Module Kickoff Meeting 17

6/14/2016 LHCb VeloPix Module Kickoff Meeting 18 TIMEPIX example data with mips Mean value of cluster size varies from between 0-18 o Landau very clean; noise is negligible Precise tracking clearly picks out binary and charge sharing regions Landau peak, Timepix at 0 o Cluster size, Timepix at 10 o Track residuals Timepix at 6 o Example SPS Beam Profile in TIMEPIX chip

6/14/2016 LHCb VeloPix Module Kickoff Meeting 19 TIMEPIX and MEDIPIX charge sharing Charge Sharing Y axis: Track prediction X axis: cluster measurement (simple charge weighting) 9 degree angle10 degree angle6 degree angle MEDIPIX (binary) 10 o TIMEPIX (TOT)

6/14/2016 LHCb VeloPix Module Kickoff Meeting 20 Preliminary result: TIMEPIX resolution Estimated track contribution to residual Timepix: 55  m pitch Unbiased x Residual as a function of angle Rotation about Y axis PRELIMINARY: UNCALIBRATED DATA!!

6/14/2016 LHCb VeloPix Module Kickoff Meeting 21 Preliminary result: HV scans at angle Width of y residual Scanning the HV up and then down again shows a clear shift in the residual means for highly angled tracks 10 degrees 18 degrees Mean of x residual Mean of y residual (rotation is about y axis).. 18 degrees Width of x residual The residual width also shows a clear dependence on orientation. This is as expected, and illustrates the sensitivity of the measurement

Why upgrade? Or, Why Should We Fully Exploit LHCb b production? There are hints of NP being just around the corner. If they are confirmed by LHCb e.g. in B s →J/  then the path forward is clear and the precision measurements must be pursued If ATLAS/CMS discover NP, but the effects are more subtle in the flavour sector then we will need precise measurements to test predictions  Pursue channels statistically limited at current experiment e.g. Bs→   Keep pace with theoretical predictions which will improve with time e.g. e.g. indirect precision on         factor 5 better thanks to significant improvements from lattice QCD? arXiv: v33 6/14/ LHCb VeloPix Module Kickoff Meeting

Pushing the Precision Frontier  s =  rad one of the most precisely predicted CPV quantities in the standard model If NP in the B s sector turns out to be large, then LHCb upgrade will be needed If it turns out to be small (as appears to be the case in the B d sector) then precise measurement is needed to match clean prediction 6/14/2016 LHCb VeloPix Module Kickoff Meeting 23 LHCb ( J/   ) Upgrade ( J/   ) SM  0.01~ LHCb numbers are with J/  alone Precision will be even better with other channels e.g. J/  f o (  ) Direct proportionality to η leads to interesting constraint on UT LHCb precision, 10 fb -1

b→s penguins, a very promising place for NP to lurk B s 0 →  dominated by penguins: NP can enter in mixing box and/or in penguins CP violating asymmetry is zero, due to cancellation of mixing and decay phases 6/14/ LHCb VeloPix Module Kickoff Meeting Can be complemented by B 0 →  K s 0 and family: At the upgrade we expect events and a precision of 0.02 At upgrade 0.6M events and error of 0.01 Intriguing pattern emerging, but existing precision poor LHCb and upgrade will clarify this picture

B s →  and B d →  – an exciting future 6/14/2016 LHCb VeloPix Module Kickoff Meeting 25 SM prediction is precise, and small! This can be reached with 10fb -1 at LHCb. If NP gives significant enhancements then will be seen sooner! However: Certain models, e.g. MCPVMFV, can give enhancements but can also suppress the branching ration < SM depending on phases Need more statistics than available at baseline LHCb 10fb -1 to approach SM 10% precision Rate of (B d /B s )→  tightly constrained and can distinguish SM and MFV ( Buras: hep-ph/ ). Might B d →  be visible at upgraded LHCb??? Blanke et al, JHEP 0610:003, 2006

B → K 0* l + l - Powerful NP laboratory Host of interesting observables. Angular distributions e.g. forward-backward asymmetry of the angle between lepton and B in the dilepton rest frame Position of zero asymmetry crossing point will be measured by LHCb as well as needed, but many other theoretically clean observables will only come into play with > 10 fb M yield at upgrade 100 fb-1 6/14/2016 LHCb VeloPix Module Kickoff Meeting 26 With larger statistics, study of further observables (transverse asymmetries: A T (2), A T (3), A T (4) ) sensitive to NP Egede, JHEP11 (2008) 32

LHCb 10 fb -1 NP physics highlights 6/14/ LHCb VeloPix Module Kickoff Meeting Rare decays: B s  µµ Direct search for NP 3  measurement of SM prediction Mixing phase in B s  J/  (tree) Sensitive to NP in mixing Measure  (2  s ) ≈ 0.01 Mixing phase in B s   (penguin) Sensitive to NP in loops Measure 2  s eff ≠ 0 (=NP) with  ≈ 0.03 CKM angle  from  B d  D/DK, B s →D s K, B d - >D  (tree) standard candle against which NP sensitive measurements can be compared measurements to ~ 2° degrees CKM angle  from B d(s) → , KK (penguin), B→hhh  _NP  vs  _SM Sensitive to ≈ 3° degrees CPV in penguins B d   K s :  vs  eff Sensitive to NP in loops Sensitive to ≈ 0.1 Search for RH currents in radiative decays B s    ; Asymmetry FB of B d  K* µµ (zero of A FB (s) to 7%) D meson physics CP, D-D mixing Santos Reece, Belyaev Leroy Ricciardi Carson Magnin Leroy

LHCb 10 fb -1 NP physics highlights 6/14/ LHCb VeloPix Module Kickoff Meeting Rare decays: B s  µµ Direct search for NP 3  measurement of SM prediction Mixing phase in B s  J/  (tree) Sensitive to NP in mixing Measure  (  s ) ≈ 0.01 Mixing phase in B s   (penguin) Sensitive to NP in loops Measure phase ≠ 0 (=NP) with  ≈ 0.03 CKM angle  from  B d  D/DK, B s →D s K, B d - >D  (tree) standard candle against which NP sensitive measurements can be compared measurements to ~ 2° degrees CKM angle  from B d(s) → , KK (penguin), B→hhh  _NP  vs  _SM Sensitive to ≈ 3° degrees CPV in penguins B d   K s :  vs  eff Sensitive to NP in loops Sensitive to ≈ 0.1 Search for RH currents in radiative decays B s    ; Asymmetry FB of B d  K* µµ (zero of A FB (s) to 7%) D meson physics CP, D-D mixing, rare decays Santos Reece, Belyaev Leroy Ricciardi Carson Magnin Leroy Measure BR to ~5-10%, search for B d  µµ Improve by factor 3: Level of indirect prediction Measure to  ≈0.01, pin down NP sub-degree precision Improve by factor 4-5 Comparison at 0.03 o level New observables to improve NP sensitivty Measure and characterise CPV