Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.

Slides:



Advertisements
Similar presentations
CDR Feb 2006Mar 2008Dec 2009 Mar Design Study Preparatory Phase TDR tendering construction data taking governance legal entity pre-production.
Advertisements

Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
A.Margiotta, SNOW 2006, Stockholm, 6 May 2006 Status Report of the NEMO Project (NEutrino Mediterranean Observatory) Towards a km 3 Neutrino Telescope.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
KM3NeT-IT The Capo Passero Infrastructure M.Anghinolfi –INFN-Genova.
Introduction to future synergy options Uli Katz ECAP, Univ. Erlangen Deep Ocean Cabled Observatories Amsterdam, May 2012.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN The East Sicily Node Facilities Giorgio Riccobene INFN-LNS, Catania
 Fiber optic network in ring topology  Custom software implementing a Time Division Multiplexing (TDM) scheme  Documentation summarizing conclusions.
C.DistefanoCRIS 2008 – Salina, September The KM3Net Consortium Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud Towards a km3-scale.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
25 km E offshore Catania 2000 m depth TSS Frame Buoy Junction Box e.o. connection e.o. cable from shore Shore laboratory, Port of Catania e.o. cable.
Compressor status AWAKE Technical Board meeting 19 August 2015.
M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July In this talk Preparation of mass construction (including DOM and DU integration)
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
KM3NeT Pylos meeting, April, 2007 Some preliminary studies for the positioning calibration of KM3NeT Miguel Ardid Universitat Politècnica de València.
Presented by E.G. Anassontzis University of Athens on behalf of NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Mechanics for “km 3 ” neutrino.
The KM3NeT consortium ( - supported through the European Union's 6th framework programme in a 3-year Design Study - aims at the construction.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators on behalf.
What? Deployment of the first full KM3NeT string, a.k.a Detection Unit. Thanks to Aart Heijboer for the nice drawings!
ROV for telescope construction: possible use of Cougar Joint meeting WP2, WP3, WP4, WP5 Paris February 2009 Jean Roux, AIM for CPPM Joint meeting.
KM3NeT deployment aspects Transportation – Deployment – Connection - Calibration Spyridon Koutsoukos.
PPM DU Sea Qualification Tests 1.General constraints & requirements 2.Preliminary tests 3.Full mechanical test.
Status and Advances on the Acoustic Positioning System for KM3NeT Giuseppina Larosa, IGIC-UPV KM3NeT General Meeting, Nikhef 28-31/03/2011.
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
KM3NeT-Toulon Infrastructure 22/06/121 NB: focus on latest developments, see February presentation in Catania for details KM3NeT meeting Erlangen,
A proposal for the KM3NeT Computing Model Pasquale Migliozzi INFN - Napoli 1.
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
05/07/2010P. LamareBackbone dry solution Dry backbone requirements.
Rosanna Cocimano for the NEMO collaboration VLV T08, Toulon, France April 2008 Rosanna Cocimano for the NEMO Collaboration A comparison of AC and.
Rosanna Cocimano Amsterdam, 5-6 July 2010KM3NeT WPF/L General Meeting Rosanna Cocimano INFN LNS Power plan for detector layout Presented in TDR.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
Report to the ASC on project organization and critical issues E. Migneco ASC meeting, Amsterdam, march
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
SEA operations – June 2012 Short summary report R. Papaleo 22 june 2012.
KM3NeT WPF/L NIKHEF- MECABAR 1 A.Cosquer on behalf of the KM3NeT consortium MECABAR PROJECT PLAN 1- Context 2- 3D views and responsibilities 3-
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
Deployment Test Program P.Kooijman. Goal of tests Validation of the LOM deployment – Has had three previous tests – First included rudimentary cable –
WPH goals: prepare the specifications for the main components of the deep-sea infrastructure: - Main electro-optical cable (MEOC); - Power transmission.
Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators.
S.BEURTHEY CPPM/IN2P3 anémone ανεμώνη anemone Preliminary Development plan A ntares NEMO NE stor CATANIA 12 of March 2008.
Earth-Sea Science Junction Boxes
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
Marseille 30 Dec ’13 KM3NET Marine Operations Catania - Status Klaus Leismüller.
Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013.
Deep sea infrastructure: ROV M. Musumeci KM3NET meeting Paris October 2008.
WP F/L Seafloor network, deployment vessels and ROVs for PPM P. Lamare – CEA Irfu 1WPF/L- PPM DU site- P. Lamare30/03/2011.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
CLB/DAQ meeting, Paris APC, 05 September DAQ in infrastructure and DU foot P. Lamare (CPPM)
KM3NeT-Italy Collaboration meeting 28/11/2014 Sistema di trasmissione dati su fibra ottica: Junction Box Sara Pulvirenti.
Pre-Production Models for KM3NeT
Status Optical System KM3NeT
Deep-sea neutrino telescopes
Write-up and Definitions for Cost Model
PPM: Description of the KM3NeT network by WP H
Status DU deployment and detector layout studies
Concluding remarks E. Migneco
Catania Jan ’14 KM3NET Italy Marine Operations CTF change out
Els de Wolf 20 February 2012, Catania
Data transport architecture over fiber and/or copper
Junction Boxes for KM3NeT
SC of KM3 Vidyo meeting of Thursday, February 18
Catania 20 Feb ’13 KM3NET Marine Operations Catania - Status
TEST PLANS for HL LHC IT STRING
THE ANTARES SITE SECONDARY JUNCTION BOX
Project Management Training
API SC6 Valves and Wellhead Equipment
Presentation transcript:

Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012

Assumptions & Constrains Finance and schedule – Deployment within Dec 2014 – Investment within the PON 2011 framework (all the invoices must be paid before the end of march 2015) Technology – The seafloor network must be able to host DOM and SOM (Single Optical Module) Detection Units

Scope of work SJB#1 SJB#2 SJB#3 SJB#4 Primary JB 8 Outputs Capo Passero Termination Frame Capabilities: 20 Optical Fibers G KV 50 kW 8 Outputs

Strategic Plan Technical Specification – To check if possible to have a single project of JB in order to host DUs (string or tower) – Define a common document with all the IN/OUT interfaces of the string and tower Project of the underwater network – Single JB – JB for String and JB for tower

Strategic Plan (2) Manufacturing – Solution single JB: Manufacture all the underwater network – Solution JB for tower and JB for string Manufacture #2 JB for towers – If the string project will be validated on time other #2 JB for string will be manufactured within the PON project – If the string project will be on delay other #2 JB for tower will be manufactured whitin the PON project

How to go ahead (1) Prepare a document with all the info necessary for the project of the JB – Optical / Electrical constrains of the Dus – Data transmission architectures for the 2 solutions (string and tower) – Mechanical interface (ROV wet mateable connector type, …..)  INPUT FOR THE DU PROJECT When: before the middle of july Who: CPPM INFN NIKHEF

How to go ahead (2) Decide if it is possible to have a single design for the JBs or not When: before the end of july Who: CPPM INFN NIKHEF

How to manage sea operations? Proposal Long term rental of a offshore vessel full equipped – Crane, … – Crew – ROV (4000 m)  COUGAR with LARS system Vessel type: Anchor Handling Vessel Gross tonnage:2,283 tons Summer DWT:2,094 tons Length:70 m Beam:16 m Draught:4.8 m Example: 6 months on 2 years

Preliminary Cost Analysis The seafloor network cost analysis includes also the interlink cables SJB - DUs

Preliminary schedule Preliminary schedule – Single JB solution Preliminary schedule – 2 different JB architecture (tower and string)

Preliminary Cash Flow Analysis Note: all the payment will be done before march 2015