1 Performance and Upgrade Plans for the PHENIX Data Acquisition System Martin L. Purschke, Brookhaven National Laboratory for the PHENIX Collaboration.

Slides:



Advertisements
Similar presentations
Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Advertisements

Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
Highest Energy e + e – Collider LEP at CERN GeV ~4km radius First e + e – Collider ADA in Frascati GeV ~1m radius e + e – Colliders.
LHCb Upgrade Overview ALICE, ATLAS, CMS & LHCb joint workshop on DAQ Château de Bossey 13 March 2013 Beat Jost / Cern.
The LHCb DAQ and Trigger Systems: recent updates Ricardo Graciani XXXIV International Meeting on Fundamental Physics.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
The Physics Potential of the PHENIX VTX and FVTX Detectors Eric J. Mannel WWND 13-Apr-2012.
1 Upgrades for the PHENIX Data Acquisition System Martin L. Purschke, Brookhaven National Laboratory for the PHENIX Collaboration RHIC from space Long.
Sourav Tarafdar Banaras Hindu University For the PHENIX Collaboration Hard Probes 2012 Measurement of electrons from Heavy Quarks at PHENIX.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
Hall D Trigger and Data Rates Elliott Wolin Hall D Electronics Review Jefferson Lab 23-Jul-2003.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
1 Perspectives for quarkonium production in CMS Carlos Lourenço, on behalf of CMSQWG 2008, Nara, Japan, December 2008.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Copyright © 2000 OPNET Technologies, Inc. Title – 1 Distributed Trigger System for the LHC experiments Krzysztof Korcyl ATLAS experiment laboratory H.
Performance of PHENIX High Momentum Muon Trigger 1.
The ALICE DAQ: Current Status and Future Challenges P. VANDE VYVRE CERN-EP/AID.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Frontend of PHENIX Si pixel K. Tanida (RIKEN) FEM/DAQ meeting for PHENIX upgrade (10/24/02) Outline Overview of PHENIX Si pixel detector ALICE1 chip readout.
VLVNT Amsterdam 2003 – J. Panman1 DAQ: comparison with an LHC experiment J. Panman CERN VLVNT workshop 7 Oct 2003 Use as example CMS (slides taken from.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
The PHENIX Event Builder David Winter Columbia University for the PHENIX Collaboration DNP 2004 Chicago, IL.
Event selection and readout Online networks and architectures Online event filter Technologies and trends Computing and communication at LHC.
The W program at PHENIX R. Seidl (University of Illinois and RBRC) for the PHENIX Collaboration Workshop on Parity Violating Spin Asymmetries BNL, April.
1 LHC-Era Data Rates in 2004 and 2005 Experiences of the PHENIX Experiment with a PetaByte of Data Martin L. Purschke, Brookhaven National Laboratory PHENIX.
Silicon Module Tests The modules are tested in the production labs. HIP is is participating in the rod quality tests at CERN. The plan of HIP CMS is to.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
The PHENIX Forward Silicon Vertex Tracker Eric J. Mannel IEEE NSS/MIC October 29, 2013.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Report on CHEP ‘06 David Lawrence. Conference had many participants, but was clearly dominated by LHC LHC has 4 major experiments: ALICE, ATLAS, CMS,
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
LHCb DAQ system LHCb SFC review Nov. 26 th 2004 Niko Neufeld, CERN.
1 The PHENIX Experiment in the RHIC Run 7 Martin L. Purschke, Brookhaven National Laboratory for the PHENIX Collaboration RHIC from space Long Island,
Spin Physics with the PHENIX Silicon Vertex Tracker Junji Tojo RIKEN for the PHENIX Collaboration Advanced Studies Institutes - Symmetries and Spin July.
Performance of PHENIX High Momentum Muon Trigger.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
W. Riegler, ECFA HL-LHC Experiment Workshop, Oct. 21st, 2014 The ALICE Upgrade.
Performance of PHENIX High Momentum Muon Trigger.
PHENIX FUTURE PLANS & UPGRADES Stefan Bathe for PHENIX, Users’ Meeting 2009.
LHCbComputing Computing for the LHCb Upgrade. 2 LHCb Upgrade: goal and timescale m LHCb upgrade will be operational after LS2 (~2020) m Increase significantly.
PHENIX DAQ RATES. RHIC Data Rates at Design Luminosity PHENIX Max = 25 kHz Every FEM must send in 40 us. Since we multiplex 2, that limit is 12 kHz and.
P H E N I X / R H I CQM04, Janurary 11-17, Event Tagging & Filtering PHENIX Level-2 Trigger Xiaochun He Georgia State University.
Muon Arm Physics Program Past, Present + Future Patrick L. McGaughey Los Alamos National Laboratory Santa Fe June 17, 2003.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
October 19, 2007Heavy Ion Meeting1 RPC Upgrade for PHENIX Byungsik Hong Korea University.
AB c CEBAF Hall D ASIC Needs in Nuclear Science T. Ludlam Brookhaven National Lab 1 RHIC.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
October 19, 2010 David Lawrence JLab Oct. 19, 20101RootSpy -- CHEP10, Taipei -- David Lawrence, JLab Parallel Session 18: Software Engineering, Data Stores,
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Streaming TPC Readout in the sPHENIX Experiment
Evidence for Strongly Interacting Opaque Plasma
LHC experiments Requirements and Concepts ALICE
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
ALICE – First paper.
RT2003, Montreal Niko Neufeld, CERN-EP & Univ. de Lausanne
Example of DAQ Trigger issues for the SoLID experiment
The CMS Tracking Readout and Front End Driver Testing
DCM II DCM II system Status Chain test Schedule.
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

1 Performance and Upgrade Plans for the PHENIX Data Acquisition System Martin L. Purschke, Brookhaven National Laboratory for the PHENIX Collaboration RHIC from space Long Island, NY

2 RHIC/PHENIX at a glance RHIC: 2 independent rings, one beam clockwise, the other counterclockwise sqrt(S NN )= 500GeV * Z/A ~200 GeV for Heavy Ions ~500 GeV for proton-proton (polarized) ‏ PHENIX: 4 spectrometer arms 15 Detector subsystems 500,000 detector channels Lots of readout electronics Uncompressed Event size typically KB for AuAu, CuCu, pp Data rate ~8KHz (Au+Au) ‏ Front-end data rate GB/s Data Logging rate ~500MB/s, 700 MB/s max

3 TOF-W RXNP MPC-N...and 3 new Detector Systems on board HBD

4 Need for Speed: Where we are ATLAS CMS LHCb ALICE ~25~40 ~100 ~300 All in MB/s all approximate ~100 ~ ~1250 Lvl1-Triggers in Heavy Ions have a notoriously low rejection factor that's because so many events have something that's interesting (different from LHC) ‏ But hey, we could write out almost everything that RHIC gave us, so why bother... this approach has served us really well. It also opened up access to processes that you can't exactly trigger on, it “just” takes some more work offline.

5 Building up to record speed Over the previous runs we have been adding improvements Had lighter systems, d+Au, p-p, Cu-Cu in the last runs, less of a challenge than 200GeV Au+Au (most challenging) Distributed data compression (run 4) ‏ Multi-Event buffering (run 5) ‏ Mostly consolidating the achievements/tuning/etc in run 6, also lots of improvements in operations (increased uptime) ‏ 10G Network upgrade in run 7, added Lvl2 filtering Ingredients: With increased luminosity, we saw the previously demonstrated 600++MB/s data rate in earnest for the first time.

6 Data Compression LZO algorithm New buffer with the compressed one as payload Add new buffer hdr buffer LZO Unpack Original uncompressed buffer restored This is what a file then looks like On readback: This is what a file normally looks like All this is handled completely in the I/O layer, the higher-level routines just receive a buffer as before. Found that the raw data are still gzip-compressible after zero-suppression and other data reduction techniques Introduced a compressed raw data format that supports a late-stage compression

7 Distributed Compression ATP SEB Gigabit Crossbar Switch To HPSS Event Builder The compression is handled in the “Assembly and Trigger Processors” (ATP’s) and can so be distributed over many CPU’s -- that was the breakthrough Buffer Box The Event builder has to cope with the uncompressed data flow, e.g. 600MB/s … 1200MB/s The buffer boxes and storage system see the compressed data stream, 350MB/s … 700MB/s Buffer Box

8 Multi-Event Buffering: DAQ Evolution PHENIX is a rare-event experiment, after all -- you don’t want to go down this path Without MEB Multi-Event buffering means to start the AMU sampling again while the current sample is still being digitized. Trigger busy released much earlier deadtime is greatly reduced

9 The Multi-Event Buffering Effect

MB/s This shows the aggregated data rate from the DAQ to disk in a RHIC fill We are very proud of this performance... Decay of RHIC Luminosity Length of a DAQ run It's not the best, it's one where I was there... the best RHIC fill best went up to 650MB/s

11 Run 9 Event statistics (so far) p+p 500GeV (done) 3.5 billion Events200 TB p+p 200GeV (in 3 rd week) 1.5 billion Events 80 TB so far Typical is TB in a Run “Physics at the Peta-Scale” (recent workshop title) has long arrived for us 58% of a PetaByte of data on tape: Run 9 is still ongoing as we speak TB (200 TB) 80 TB (200GeV) PHENIX Raw Data

12 Upgrade Programs RHIC will give us several luminosity and beam livetime upgrades The era where could mostly write out “everything” is coming to an end The Future we will add detectors in the central region which will significantly increase our data volume

13 Upgrades 3 main new detectors (that's in addition to the ones I showed before as “on board”): The Vertex/Forward Vertex detectors A Muon trigger upgrade RPC detectors 23911Total %6FVTX %/0.16%3VTX pixel %/2.5%2VTX strip Data rate (Gbps)* Event size (kbyte)‏ OccupancyDCM groups Detector Triples current event size 800-pound gorilla

14 Upgrades All new detectors have electronics with high rate capability However, older detector readout limits the level 1 rate no way to upgrade any time soon - $$$$$ We will need to focus on rare events more Front end pipelines Readout buffers Processor farms Switching network Detectors Lvl-1 HLT 40MHz 100KHz 100Hz Remember, our Lvl1 is not the LHC Lvl1... ours is before digitization HLT is no solution CMS Hence: FVTX has Lvl1 trigger “hookup” for displaced vertex triggers other upgrade is a trigger to begin with (W->muon)

15 Prototype RPC +  Trigger RPC3 RPC2 View from back Prototype RPC RPCs μ +/-

16 Need for Speed Total Event building bandwidth is several times the average throughput But individual detectors/components are close to the max (network, processing) Replace the Data Collection Module (DCM) with DMC II – packaging/0-sup of data DCM was modern in its days, DSP-based + some FPGA DCM II uses latest FPGA technology, FPGA is main component ATP SEB Gigabit 10G Crossbar Switch Event Builder Buffer Box 10G links 10G networks are slowly becoming a commodity Allows to make better use of multi-core machines Saves money and power and A/C in the end In the same spirit, replace PCI with PCI Express

17 Outlook PCI Express 10GB/s Networks DCM II Upgrade New hardware components to help maintain our current speed The End

18 u d Similar expression for W - to get Δῡ and Δd… Since W is maximally parity violating large measured Δu and Δd require large asymmetries. W Production Basics No Fragmentation!

19 MuonTrigger and RPC upgrade RPCs μ +/- u d W physics with polarized protons Trigger will allow to enhance the sample if high- momentum/straight-track muons RPC adds timing to reduce large background from non- collision muons (beam, cosmics)

FVTX Fitted track provides a DCA to the primary vertex (measured by central arm barrel VTX detector)‏  prompt Pinpoint the decay vertex to eliminate backgrounds! Endcap detects the following by displaced vertex (∆r, ∆z) of muons: D (charm)  μ + X B (beauty)  μ + X B  J/ ψ + X  μ+ μ-

21-October-2008 Jon S. Kapustinsky2008 IEEE NSS-MIC Dresden 21 FVTX Section View 80 cm Barrel 4 discs of Si sensor in acceptance of each Muon Arm Microstrips to accurately measure R coordinate of track Scheduled to be installed in FY11 Two endcap halves ½ of one endcap ½ disks