Introduction and context for the workshops David MacFarlane, LBNC Chair Reconstruction Assessment & Requirements Workshops.

Slides:



Advertisements
Similar presentations
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
Advertisements

Responsible CarE® Codes of Management Practices Overview
URUGUAY’s efforts to address synergies among the Conventions Workshop on synergies and cooperation with other conventions 2-4 July 2003 Espoo, Finland.
Security Education and Awareness Workshop January 15-16, 2004 Baltimore, MD.
UNSW Strategic Educational Development Grants
Ohio Improvement Process (OIP) August Core Principles of OIP  Use a collaborative, collegial process which initiates and institutes Leadership.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Performance Appraisal System Update
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
By Saurabh Sardesai October 2014.
Towards a Future Long-Baseline Neutrino Experiment Bob Wilson Colorado State University CERN Prototype/Beam Test Meeting CERN, 20 October 2014.
UNLV Data Governance Executive Sponsors Meeting Office of Institutional Analysis and Planning August 29, 2006.
The SEEAW in the context of Integrated Water Resource Management and the MDGs Roberto Lenton Chair, Technical Committee Global Water Partnership.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
Implementation process at EU level Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – submitted to EMECO meeting -
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
OPERATIONAL GUIDELINES Ensuring Ownership of PARSEL by Partners.
NSDI Strategic Plan Update FGDC Coordination Group Meeting September 10, 2013.
Progress on Coordinating CBP and Federal Leadership Goals, Outcomes, and Actions Principals’ Staff Committee Meeting 2/16/12 Carin Bisland, Associate Director.
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
1 Investing in America’s Future The National Science Foundation Strategic Plan for FY Advisory Committee for Cyberinfrastructure 10/31/06 Craig.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
1. Housekeeping Items June 8 th and 9 th put on calendar for 2 nd round of Iowa Core ***Shenandoah participants*** Module 6 training on March 24 th will.
EE & CSE Program Educational Objectives Review EECS Industrial Advisory Board Meeting May 1 st, 2009 by G. Serpen, PhD Sources ABET website: abet.org Gloria.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) TT-PWPP-2 Chair's Opening Remarks WMO; OBS.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
Report on the review of ACG structure The Exchange of Information Task Force October 7-9, 2009 The 13th ACG General Meeting in Hanoi.
Meeting the ‘Great Divide’: Establishing a Unified Culture for Planning and Assessment Cathy A. Fleuriet Ana Lisa Garza Presented at the 2006 Conference.
Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
Draft. NAWMP Progress Assessment You did what with our $3 billion?
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
Update on ESCAP Work on Trade Facilitation and implementation of the ROC-TF mechanism Regional Organizations Cooperation Mechanism for Trade Facilitation.
Helping Teachers Help All Students: The Imperative for High-Quality Professional Development Report of the Maryland Teacher Professional Development Advisory.
GEO Work Programme 2016 WGISS#40 HARWELL (UKSA) 28 SEP - 02 OCT 2015 MIRKO ALBANI, ESA.
GEO Implementation Mechanisms Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
© PeopleAdvantage 2013 All Rights Reserved We will Show You How to Easily Conduct Effective Performance Appraisals LCSA Conference 2013.
Nigel S. Lockyer May 19, 2016 Fermilab View LBNF/DUNE.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
CMS Crosscut Operations and Research, Theory, Computing, University Involvement C. Young and B. Zhou.
CHB Conference 2007 Planning for and Promoting Healthy Communities Roles and Responsibilities of Community Health Boards Presented by Carla Anglehart Director,
DOE /ESnet-related IPv6 Activities Phil DeMar HEPix IPv6 Workshop (CERN) Sept. 6,
Putting people first, with the goal of helping all Michiganders lead healthier and more productive lives, no matter their stage in life. 1.
LBNC report to the PAC David MacFarlane, LBNC Chair January 20, 2016.
African Centre for Statistics United Nations Economic Commission for Africa Session 2 How to meeting countries needs: What has been done and way forward.
Work Plan Work Plan Management (Document 21)
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
CERN Steve Kettell DUNE Collaboration Meeting January 12, 2016.
What is a Learning Collaborative?
S4 will be a “big” Collaboration:
Overview – Guide to Developing Safety Improvement Plan
Overview – Guide to Developing Safety Improvement Plan
Oceans and Society: Blue Planet
The Strategic Information Technology Formulation
Marine Strategy Framework Directive (MSFD)
Overview of working draft v. 29 January 2018
Preliminary Project Execution Plan
Project Name Here Kick-off Date
Presentation transcript:

Introduction and context for the workshops David MacFarlane, LBNC Chair Reconstruction Assessment & Requirements Workshops

Origins of the two contiguous workshops Reconstruction assessment workshop: –Requested through the Fermilab PAC by the Long-Baseline Neutrino Committee (LBNC) as a first step along a path of focusing community attention on automated reconstruction in LAr TPCs Requirements workshop: –Community-led effort to collectively put together a shared goal of setting overall requirements for a LAr eco-system of software, hardware, and computing to guide work over the next few years –While strongly encouraged by the LBNC, bottoms up is a much better approach! Two goals are tightly connected and the LBNC would like to see ownership of the outcomes by the community 10/19/2015Introduction and context for the workshops2

LArTPC Development Path Fermilab SBN and CERN neutrino platform provide a strong LArTPC hardware, electronics and software development and prototyping program DUNE Alternative Design WA105: 1x1x3 m WA105 Dual-Phase 35-t prototype ICARUS MicroBooNE DUNE Reference Design 2015 CERN LBL SBL Single-Phase /19/2015Introduction and context for the workshops3 SBND

PAC feedback on the SBN program from June 2015 Reaffirmed that the SBN program: –Is a critical part of the development of the LArTPC program leading up to DUNE –Is capable of definitively addressing the unresolved anomalous results seen by LSND and MiniBooNE –Is very well aligned with the program outlined by P5. Pleased by: –Completion of CD4 by MicroBooNE and start of commissioning –Significant progress on the SBND and ICARUS buildings. –Impressive technical progress, from the preparations for the arrival of ICARUS to the design work on the SBND TPC, photon, and counter systems. –Critical support from DOE, NSF, CERN, INFN, STFC, & SNSF. 10/19/2015Introduction and context for the workshops4

PAC feedback on the SBN program from June 2015 Concerned about: –Pace at which automated LAr reconstruction is developing, despite being absolutely crucial to the SBN and LBN programs –Slow progress in coordinating the analysis across the three experiments, which is critical to the success of the SBN program and required for Stage 2 approval –Very aggressive SBN schedule with little flexibility Recommended that Fermilab continues: –Monitoring progress on achieving automated event reconstruction –Providing relevant resources and expertise towards catalyzing this effort, since it is critical to quickly demonstrate the capabilities of the LArTPC technology. 10/19/2015Introduction and context for the workshops5

PAC feedback on the SBN program from June 2015 Recommended that Fermilab extend the LBNC mandate to include elements of SBN oversight: –Oversee and advise on coordination among the MicroBooNE, SBND and ICARUS collaborations & other LAr detectors at FNAL and at CERN both from the technical and physics points of view –Monitor the knowledge exchange and coordination of efforts between the SBN and LBN programs 610/19/2015Introduction and context for the workshops

LBNC: Genesis, scope and membership Recommended by Fermilab PAC in January as a new advisory committee focused specifically on LBNF/DUNE Modeled after the LHCC at CERN Scope includes scientific, technical and managerial decisions/preparations of the experiment & facility Provides continuous oversight, reports to Fermilab Director Membership: 10/19/20157 o Chair, David MacFarlane (SLAC) o Ursula Bassler (IN2P3) o Francesca Di Lodovico (Queen Mary) o Patrick Huber (Virginia Tech) o Mike Lindgren (FNAL) o Naba Mondal (TIFR) o Tsuyoshi Nakaya (Kyoto) o David Nygren (UT Arlington) o Stephen Pordes (FNAL) o Kem Robinson (LBNL) o Nigel Smith (SNOLAB) o David Wark (Oxford) Introduction and context for the workshops

Charge from Fermilab Director on SBN oversight: Initial steps taken on SBN program coordination LBNC met with SBN, DUNE, & LAriat spokespersons in early Sept –Discussed steps to achieve greater coordination on automated LAr reconstruction, starting with an assessment workshop in October leading to development of a longer-term strategy –Contiguous to a LArSoft framework requirements workshop jointly sponsored by the SBN/DUNE collaborations & Fermilab –SBN Executive Board will revive a Steering Committee to develop a concrete plan for a joint analysis strategy –LBNC will monitor discussions between SBND and DUNE on coordination of TPC hardware, electronics, and photon detection systems to the degree possible LBNC will move to continuous oversight model, with some additional LBNC members to take on this scope 10/19/2015Introduction and context for the workshops8

LBNC comments on DUNE Far Detector (FD) Task Force Comments from Sept review –The LBNC notes that the 80% efficiency for automated reconstruction for quasi-elastic, resonant elastic scattering and deep-inelastic scattering events is a key assumption in the projected physics reach of DUNE. Much progress in demonstrating this capability should be accomplished by the TF within the next 18 months. –An important part of the FDTF planning would be to lay out a common understanding of the level of reconstruction sophistication needed at various stages during the 18 months and then beyond through the DUNE design phase leading up to CD-2 10/19/20159Introduction and context for the workshops

LBNC request post the reconstruction workshop Ambitious: will take time and effort beyond these two days! A comprehensive summary of the current status of and future plans for further development of automated reconstruction efforts: –Basic physics information, such as event classes and topologies, backgrounds for each experiment, performance requirements, etc.; –Current state-of-the-art, including quantified performance of the reconstruction; –Leadership for the current effort and the level of effort across the collaboration; –Degree to which the effort relies on common software tools, such as analysis framework development, etc. and their further development; 10/19/2015Introduction and context for the workshops10

LBNC request post the reconstruction workshop –Timeline, milestones, deliverables and level of effort required for further development; –Linkages to hardware system development and experience with neutrino and test beam data –Assessment of areas of commonality with other SBN or LBN experiments; and –Assessment of resource limitations and impact of bringing additional targeted help, either from Fermilab or in cooperation with other science collaborations. Workshop should consider mechanisms for sharing the results of development progress on a more continuous basis –e.g., through an ongoing joint steering committee, a regular forum for exchange on development progress, and/or future more extensive workshop devoted to LAr reconstruction 10/19/2015Introduction and context for the workshops11

LBNC encouragement for collaborative approaches LBNC welcomes the Requirements Workshop as a first important step in a common community approach –Will be very interested to see the outcome/success – or not – of the approach –Understand that, if successful, requirements may then evolve towards putting in place resources and a development plan As part of the workshop planning, a LArSoft steering group has been established between the participating collaborations –Could be a model and/or extended/renamed/reformed to meet the needs of the joint steering committee suggested as part of the reconstruction workshop follow-up 10/19/2015Introduction and context for the workshops12

Summary Within the US HEP program, there is a very high degree of scrutiny & expectation focused on the SBN & LBN programs –Two workshops should be viewed as the first step in developing a comprehensive & focused program for understanding LAr TPC performance & demonstrating LAr reconstruction LBNC will actively follow reconstruction & common analysis preparations by the SBN & LBN communities –LAr TPC technology is the foundation both these programs –Automated reconstruction is a key part of this strategy and an as yet unproven assumption in physics capability –A common software framework approach across these programs will greatly enhance their effectiveness & efficiency Bottoms up is always better: very pleased to see community ownership in addressing these questions 10/19/201513Introduction and context for the workshops