1 Implementing a Virtualized Dynamic Data Center Solution Jim Sweeney, Principal Solutions Architect, GTSI.

Slides:



Advertisements
Similar presentations
NetApp OnCommand Management Software
Advertisements

IBM Software Group ® Integrated Server and Virtual Storage Management an IT Optimization Infrastructure Solution from IBM Small and Medium Business Software.
© 2006 DataCore Software Corp SANmotion New: Simple and Painless Data Migration for Windows Systems Note: Must be displayed using PowerPoint Slideshow.
Technology alliance partner
Windows IT Pro magazine Datacenter solution with lower infrastructure costs and OPEX savings from increased operational efficiencies. Datacenter.
2  Industry trends and challenges  Windows Server 2012: Modern workstyle, enabled  Access from virtually anywhere, any device  Full Windows experience.
2  Industry trends and challenges  Windows Server 2012: Beyond virtualization  Complete virtualization platform  Improved scalability and performance.
Cisco‘s Cloud Stragegy, Products and Solutions Dr. Walter Dey, Distinguished Systems Engineer Datacenter and Virtualization Team Cisco Systems EMEAR Eurocloud.
From 8Gb FC HBAs to CNAs: Understanding Oracle Networking Products Powered by QLogic.
System Center 2012 R2 Overview
Dan Stolts Chief Technology Strategist Microsoft Corporation Blog: Managing and Monitoring Critical Infrastructure.
Cisco UCS Mini Martin Hegarty| Product Manager | Comstor
Brocade VDX 6746 switch module for Hitachi Cb500
Design a Practical Consolidation Roadmap: From Assessment to Implementation Prem Jadhwani CISSP, CISM, GIAC Sr. Solutions Architect, GTSI Corp.
Wyse.com 2010 Cameron Smith Sales Engineer for IN, KS, and MO Desktop Virtualization.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
The Efficient Fabric Presenter Name Title. The march of ethernet is inevitable Gb 10Gb 8Gb 4Gb 2Gb 1Gb 100Mb +
Session Agenda Introducing the Serverquarium for 2013.
Virtual techdays INDIA │ 9-11 February 2011 Cross Hypervisor Management Using SCVMM 2008 R2 Vikas Madan │ Partner Consultant II, Microsoft Corporation.
/ 2 © Copyright scalar decisions inc. Not for redistribution outside of the intended audience. Cisco Silver Certified Partner  Unified Compute.
The Efficient Data Center - Dell Advanced Infrastructure Manager Presenter Name Title.
Commonwealth of Massachusetts Statewide Strategic IT Consolidation (ITC) Initiative ITD Virtualization and Shared Services Executive Briefing Presentation.
Product Manager Networking Infrastructure Choices for Storage.
CategoryDynamic Datacenter Toolkit for Hosters (DDTK-H)Dynamic Datacenter Toolkit (DDTK) Service OfferingEnables hosting service providers to offer on-demand.
© Hitachi Data Systems Corporation All rights reserved. 1 1 Det går pænt stærkt! Tony Franck Senior Solution Manager.
Efficient Data Center – Virtual Integrated System Presenter Name Title.
5.3 HS23 Blade Server. The HS23 blade server is a dual CPU socket blade running Intel´s new Xeon® processor, the E5-2600, and is the first IBM BladeCenter.
1 © Copyright 2009 EMC Corporation. All rights reserved. Agenda Storing More Efficiently  Storage Consolidation  Tiered Storage  Storing More Intelligently.
© 2012 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1 Cisco CloudVerse for Government: Helping Agencies Reduce Costs and Respond.
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Public Presentation_ID 1 Session ID 20PT Unified Computing System Marco Kuendig
1 © 2009 Cisco Systems, Inc. All rights reserved.Cisco PublicC Cloud Computing: What’s on the Horizon Daniel Bogda Channel SE.
Extreme Networks Confidential and Proprietary. © 2010 Extreme Networks Inc. All rights reserved.
Cisco Confidential 1 © 2010 Cisco and/or its affiliates. All rights reserved. Data Center Solutions Marketing Data Center Business Advantage Customer Proof.
Virtualization Lab 3 – Virtualization Fall 2012 CSCI 6303 Principles of I.T.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chris Wiborg Enterprise Architecture Marketing Manager Cisco Systems.
Copyright 2009 Fujitsu America, Inc. 0 Fujitsu PRIMERGY Servers “Next Generation HPC and Cloud Architecture” PRIMERGY CX1000 Tom Donnelly April
System Center 2012 Certification and Training May 2012.
Light showcase: System Center 2012 SP1- Operations Manager Medium showcase: System Center 2012 SP1- Operations Manager Deep showcase:
Enterprise Storage A New Approach to Information Access Darren Thomas Vice President Compaq Computer Corporation.
Virtualization By Tim Ausburn & James Cantrell. Virtualization: Why? Reduce IT Costs Server consolidation Application Isolation Increase Server Utilization.
COMS E Cloud Computing and Data Center Networking Sambit Sahu
1 Dell World 2014 Reducing IT complexity and improving utilization though convergence infrastructure solutions Dell World 2014 Ravi Pendekanti, Vice President,
SAM for Virtualizatio n Presenter Name. Virtualization: a key priority for business decision makers Technavio forecasts that the global virtualization.
Redes Centros de Computo. Chief Executive OfficerChief Information Officer.
Neil Sanderson 24 October, Early days for virtualisation Virtualization Adoption x86 servers used for virtualization Virtualization adoption.
1 Evolution and Revolution: Windows 7 and Desktop Virtualization How to Accelerate Migration to Windows 7 Miguel Sian, Sr. Enterprise Solutions Consultant.
Server Virtualization & Disaster Recovery Ryerson University, Computer & Communication Services (CCS), Technical Support Group Eran Frank Manager, Technical.
Uwe Lüthy Solution Specialist, Core Infrastructure Microsoft Corporation Integrated System Management.
© BLADE Network Technologies, © FASTER VIRTUAL PROVEN Cloud Ready Network Open Products, Shipping Now.
Desktop Virtualization Joshua Bradfield Dan Bacus Data Center Solutions Manager Sr. Engineer.
Network convergence – role in I/O virtualization What is a converged network? A single network capable of transmitting both Ethernet and storage traffic.
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. 1 Automate your way to.
1© Copyright 2015 EMC Corporation. All rights reserved. FEDERATION ENTERPRISE HYBRID CLOUD OPERATION SERVICES FULL RANGE OF SERVICES TO ASSIST YOUR STAFF.
1 Delivering on the Promise of a Virtualized Dynamic Data Center Hosted by GTSI and Cisco.
C © 2010 NetApp, Cisco, and VMware. All Rights Reserved. Presented Jointly by Cisco, NetApp, and VMware FlexPod for VMware.
Unit 2 VIRTUALISATION. Unit 2 - Syllabus Basics of Virtualization Types of Virtualization Implementation Levels of Virtualization Virtualization Structures.
Jenny Hobbs Consulting Systems Engineer April 2016 Business Case for Tailored Datacenter Integration (TDI)
The Efficient Fabric Presenter Name Title.
Cisco UCS.
Delivering on the Promise of a Virtualized Dynamic Data Center
Implementing Cisco Data Center Unified Computing
Azure Infrastructure for SAP®
FlexPod Update.
Flex System Enterprise Chassis
Cisco Dumps With Real Exam Question Answers - Free Study Material
Cisco’s Intelligent Automation for Cloud
Managing Clouds with VMM
Infrastructure Transformation - Nexus Technology Update
Presentation transcript:

1 Implementing a Virtualized Dynamic Data Center Solution Jim Sweeney, Principal Solutions Architect, GTSI

2 GTSI Cloud Computing Maturity Model

3 Step One: Consolidation 3

4 FCoEBenefits Fibre Channel over Ethernet (FCoE) Mapping of FC frames over Ethernet Enables FC to run on a lossless data center ethernet network Wire server once Fewer cables and adapters Software provisioning of I/O Interoperates with existing SANs No gateway—stateless Fibre Channel Ethernet Multicast Public Network Block Data File Data Management 10 GbE

5 Key Benefits of Unified Fabric Rack, Row, and X-Data Center VM portability become possible. Reduce overall DC power consumption by up to 8%. Extend the lifecycle of current data center. Wire hosts once to connect to any network - SAN, LAN, HPC. Faster rollout of new apps and services. Every host will be able to mount any storage target. Drive storage consolidation and improve utilization.

6 UCS Manager Embedded– manages entire system UCS Fabric Interconnect 20 Port 10Gb FCoE 40 Port 10Gb FCoE UCS Fabric Extender Remote line card UCS Blade Server Chassis Flexible bay configurations UCS Blade Server Industry-standard architecture UCS Virtual Adapters Choice of multiple adapters Stateless Servers

7 Step Two: Virtualization

8 Server Virtualization

9 Workload Motion Workload movement technology moves running virtual machines from one host to another while maintaining continuous service availability Enables continuous workload consolidation Enables zero-downtime maintenance

10 Energy Savings (Large DC) Baseline 200 Servers Cost Per KwH =.11 *Server Growth Rate = 15% Goal Utilization = 60% Before Virtualization Year 1Year 2Year 5 Power Used (Watts) 115,000132,250201,136 Server Electric Cost $110,890$127,523$193,947 Cooling Cost $138,612$159,404$242,434 Total (Power & Cooling) $249,502$286,928$436,381 After Virtualization Power Used (Watts) ,35021,360 Server Electric Cost $7246$8333$12,674 Cooling Cost $9058$10,417$15,843 Total (Power & Cooling) $16,304$18,750$28,517 Data Generated by GTSI Green Calculator *Source: IDC (Average Server Growth Rate Per Year) ROI = 3 Years Calculator: GTSI.com/VirtualizationCalculator

11 Step Three: Automation 11

12 The ITSM Lifecycle

13 Step Four: Utility 13

14 Dynamic Datacenter Management Automated, Policy-Based, Self Service Provisioning Role Based Access Control Delivering the “Right Size” machine at the “Right Service Level” Cost Transparency and Chargeback VM Sprawl Control and Management Business Units Business Needs IT Compute Infrastructure Operational Control Dynamic DC Manager

15 Step Five: Cloud 15

16 Automated Service Delivery and Management Virtual Resource Manager Deliver Manage Report Track Policy Based Workflow Automation & Integration Organize Compute Infrastructure Business Requirements Users Corporate Policies Existing Management Ecosystem Operational Monitoring CMDB Asset Management License Management Work Orders

17 Physical Infrastructure Ready for Cloud

18 Virtualization Tools Stoplight Analysis Assessments Proof of Concept Implementation Accelerate to the next step Accelerate to the next step Accelerate to the next step

19 Virtualization Tools Stoplight Analysis AssessmentsProof of Concept Implementation GTSI Virtualization Zone Virtualization Methodology Seminars Webinars Tradeshows White papers Case studies Calculators Presentations Videos

20 Virtualization Tools Stoplight Analysis AssessmentsProof of Concept Implementation Analysis services Detailed analysis reports Architecture and technology recommendations Expected ROI

21 Virtualization Tools Stoplight Analysis AssessmentsProof of Concept Implementation Infrastructure assessments for: Server / Desktop Network Storage Data Center Architecture diagram Detailed report with findings

22 Virtualization Tools Stoplight Analysis AssessmentsProof of Concept Implementation Proof of concept: Small Medium Large Fully-functional infrastructure to test Installation and training time Architecture diagram Subject matter experts

23 Virtualization Tools Stoplight Analysis AssessmentsProof of Concept Implementation Full installation On-site services: Management Monitoring Reporting Migration