PROPOSED FIVE YEAR STRATEGIC FACILITY PLAN PROGRAMS FOR 2010 TO 2015 ENGR. ROBERTO G. ROSALES, msme FACILITIES MANAGER, Member – ASHRAE Member – PSVARE.

Slides:



Advertisements
Similar presentations
SAN DIEGO SUPERCOMPUTER CENTER at the UNIVERSITY OF CALIFORNIA, SAN DIEGO Green Datacenter Initiatives at SDSC Matt Campbell SDSC Data Center Services.
Advertisements

Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.
The value in mechanical & electrical retrofits What Pays and what Doesnt? What Pays and what Doesnt? June 16, 2011 June 16, 2011 Mark Kesseler Mark Kesseler.
Trane Voyager™ rooftop units
Foundations of Real Estate Management TM BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building.
April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
King Fahd University of Petroleum and Minerals Mechanical Engineering Department Presented by Mohammad A. Al-Muaigel /10/2004 National Energy.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
UTPA Energy Conservation Initiatives Oscar Villarreal Director, Facilities Management David Ortega Assistant Director, Energy Manager.
Variable Frequency Drives VFD Basics
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Engineer Presentation
Management training Jumeirah beach residence sector 3 Presented by November 15 th 2006.
Toward a Sustainable Campus. Outline A. Global Sustainability Movement in Higher Education B. Resources C. What can be done? D. “Toward a Sustainable.
RETScreen® Energy Efficiency Projects
Steam condensers Functions: Lowers back pr. of turbine exhaust Enables recovery and recirculation of feed water Enables the removal of air and non- condensable.
ASIA CLEAN ENERGY FORUM “Energy Management Initiatives in Production Facility ” C. M. S. M. Fazvi Certified Energy Manager (Sri Lanka Sustainable.
Prepared by Jim Baillon and Ken Cosgrove Report and Recommendations Cooling Towers- Condos.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Environmental System Science November 18, 2009 Identifying Energy Conservation Measures. Tailoring Retro-commissioning to meet your needs.
Foundations of Real Estate Management BOMA International ® Module 3: Building Operations I Domestic Water ®
Greening Your Home Presented By: Josh Simmons Environmental Manager Santa Ynez Band of Chumash Indians [Insert DATE]
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Fairfax County’s Environmental Initiatives Kambiz Agazi June 11, 2008.
PLATFORM UTILITIES PAB 2073 Reference: PCSB/PMO document.
Green Building Demonstration Project Adam Saling City of San Diego.
TEAM UP! FOR FAN AND PUMP SAVINGS It can be as easy as replacing an old drive belt.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
Albert Young – University of Glasgow Allan Crooks – Carbon Trust Case Studies.
STATE WATER EFFICIENCY AND ENHANCEMENT PROGRAM Jenny Lester Moffitt Deputy Secretary.
Community Water Supply Efficiency Improvements Potential Savings for the 6 th Power Plan September 30 th, 2008 Regional Technical Forum.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
Name of Building(s) or Project Speaker(s) Organization(s)
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
N O R T H A M E R I C A C O M M E R C I A L TDP
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
AIA Guidelines for Design and Construction of Hospital and Healthcare Facilities Presented By: Michael A. Rogers, PE
1 BREC Air-cooled water chillers BREF Air-cooled water chillers with free-cooling system 1602A A A A A 3202A A A -
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Tangible Property Regulations Presented by David W. Jennings, CPA.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
GRES Education. The goals of the GRES Education program are to: help school districts reduce energy use, conserve water, and minimize waste production.
Session 14 & 15 Lab Exercises. Assessing and working with data in the model – Instructor’s presentation What are the top five areas of focus for applying.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
COZYEON Residence Main facilities gallery. Corridor of each floor.
Wurster Hall MBCx Project October 30th, Project Overview Project Goals Project Objectives Identify Low Cost/No Cost Measures Identify Retrofit.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
WELCOME!. Who is T&T Power Group? WELCOME! Who is T&T Power Group? What can we do for you?
.  1.Leaderships in energy and environmental design (LEED). 2.Khalifa tower Environment friendly. 3.Elevators of Khalifa tower. 4.Evacuation and fire.
Introduction to Xylem Inc. Progressive Energy, Environment & Sustainability Summit 16 May 2013.
Power Resiliency at Water Utilities: What States Can Do Lauren Wisniewski U.S. Environmental Protection Agency ASDWA Webinar August 5, 2015.
Presented By : SONU DEEP ELECTRICAL ENGINEERING.
Comprehensive Energy Projects May 4, 2016 Andy Kelly Manager of Plant Engineering Central Production Facility Co-op & Northeast Hot Fill Co-op.
AstraZeneca R&D Boston Waltham Energy Reduction Initiative 2016 Green Labs Symposium.
Water Filtration Plant Improvements Project Summary
REFERENDUM Your vote matters! September 26, 2017
Variable Frequency Drive Savings Calculator Tools
Energy Efficiency in District Coiling System
Traditional Water Booster System
Biobehavioral Health Building, University Park, PA
M&E SYSTEM.
Leveraging Glass Panel Simulator Usage
Dunham Bush Air Cooled Package
Presentation transcript:

PROPOSED FIVE YEAR STRATEGIC FACILITY PLAN PROGRAMS FOR 2010 TO 2015 ENGR. ROBERTO G. ROSALES, msme FACILITIES MANAGER, Member – ASHRAE Member – PSVARE Member - BOMAP SEPTEMBER 21,2009

5-Year STRATEGIC FACILITY PLANNING  OBJECTIVE  TO IMPROVE PHYSICAL AND ENVIRONMENTAL CONDITIONS OF FACILITIES by 2011  TO IMPROVE EFFICIENCY OF SYSTEM AND LOWER O&M COST BY 3% UPON PROJECT COMPLETION by 2012  TO BRING MAJOR EQUIPMENT TO THE LEVEL OF ITS STANDARD OPERATING CONDITIONS by 2015

5-Year STRATEGIC FACILITY PLANNING  FACILITIES  WATER SYSTEM  AIRCONDITIONING AND VENTILATION SYSTEM  LIGHTING SYSTEM  LANDSCAPE AREA  EMERGENCY POWER SYSTEM

5-Year STRATEGIC FACILITY PLANNING  WATER FACILITY  ENHANCEMENT OF WATER QUALITY THROUGH FIRST STAGE DIRECT FEED AND UV FILTRATION  PROVISION OF ALTERNATE MAIN PIPE RISER FOR CRITICAL FLOOR SUPPLY  REPLACEMENT OF PUMP CONTROLLERS USING VARIABLE FREQUENCY FOR ENERGY SAVINGS OF 50% ON PUMPING COST

5-Year STRATEGIC FACILITY PLANNING  AIRCONDITIONING AND VENTILATION SYSTEM  DESIGN OF NEW TYPICAL FLOOR LOBBY AIRCONDITIONING VS. RESTORATION WORKS ONLY  USE OF ENERGY RECOVERY VENTILATION SYSTEM  UTILIZE EXISTING VFD CONTROLLERS to improve system efficiency to maximize existing investment  Basement Elevator Lobby Airconditioning

5-Year STRATEGIC FACILITY PLANNING  AIRCONDITIONING AND VENTILATION SYSTEM  COOLING TOWERS( HEART OF THE SYSTEM) WATER MANAGEMENT DESIGN OF WATER RECIRCULATION PIPES PROVISION OF WATER METER WATER TREATMENT PROGRAM ENHANCEMENT COOLING TOWER FILLERS PROVISION OF STANDBY FILLER PER TOWER MODULE RESTORATION OF BMS CONTROLLERS AND VALVES REPLACEMENT OF MAIN PIPE LINES affected by Corrosions RESTORATION OF VIBRATION ISOLATORS RESTORATION OF ACOUSTIC PANELS

5-Year STRATEGIC FACILITY PLANNING  AIRCONDITIONING AND VENTILATION SYSTEM  PROVISION OF EFFICIENCY CONTROLS FOR TOILET EXHAUST SYSTEM  BASEMENT VENTILATION SYSTEM USE OF JET FANS – AS AN ALTERNATIVE SYSTEM

5-Year STRATEGIC FACILITY PLANNING  LIGHTING SYSTEM  USE OF INTERACTIVE LIGHTING FOR LOBBY CORRIDOR FOR ADDED SAFETY  USE OF ELECTRONIC BALLAST FOR BASEMENT LIGHTING FOR 20% ADDED ENERGY SAVING  IMPROVEMENT OF LIGHTING SYSTEM FOR TRAFFIC CONTROL

5-Year STRATEGIC FACILITY PLANNING  LANDSCAPE  WATERPROOFING Integrated waterproofing of Landscape Area  Irrigation system improvement  Trees and tree pits improvement

5-Year STRATEGIC FACILITY PLANNING  EMERGENCY POWER SYSTEM  Emergency Power System Rehabilitation of Synchronizing Switchgear for all towers, priority is Rizal Tower Recommended works of Caterpillar& Shockblock for Gensets Assessment of BusDuct System Assessment of Running Motors

5-Year STRATEGIC FACILITY PLANNING SYSTEMEST. COST in Millions TARGET DATEREMARKS 1 WATER SYSTEM3.62 QTR 2012 TO 2QTR 2013Chemperts/AMD/AFS 2. AIRCONDITIONING4.44 QTR 2012 &1QTR2015Dacworks/MEI 3. LIGHTING SYSTEM3.54 QTR 2010 TO 2QTR 2011Weiland/MEI 4. LANDSCAPE AREA3.54 QTR 2010 TO 2 QTR 2013BNMP/RLC 5. EMERGENCY POWER SYSTEM1.53QTR 2012 / 3QTR 2014Caterpillar/Shockblock TARGET SCHEDULE IN PHASES

5-Year STRATEGIC FACILITY PLANNING THANK YOU!