Warm cabling, cooling and ventilation L. Tavian, ATS-DO On behalf and under the controls of SWP17.2 and SWP17.3 Conceptual Design Review of the Magnet.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
RUSSIAN ACADEMY OF SCIENCES PROGRAM SYSTEMS INSTITUTE Optimal Control of Temperature Fields for Cooling of Supercomputer Facilities and Clusters and Energy.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
IMPACTS OF INSTALLING THE REFERENCE MAGNET PLACEMENT IN B december 2014 Fulvio Boattini & Natacha Lopez Hernandez.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HOW THE DUMP RESISTOR’S TANK LOOKS LIKE COOLING OF THE LHC ENERGY EXTRACTION RESISTORS G. Peón (ST/CV), K. Dahlerup-Petersen, G. Coelingh (AT/MEL) Air.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
PSB Beam Dump Cooling Constraints Glen Mason EN-CV 30 August 2012.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
1 BREC Air-cooled water chillers BREF Air-cooled water chillers with free-cooling system 1602A A A A A 3202A A A -
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
First results from the study of the LHC cycle power consumption FCC I&O meeting 24 th June 2015 Davide Bozzini With the contribution of G. Burdet, B. Mouche,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
NCSX NCSX Trim Coil Peer Review 11/6/07 1 Tom Brown Art Brooks Raki Ramakrishnan Mike Kalish NCSX Trim Coil Peer Review.
Consolidation of the Booster Injection Quadrupole Magnets (part 2) A. Aloev 14 th February 2013.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 SC Link Protection A.Ballarino 28/10/2015.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
FCC Week 2015, Washington Cooling the FCC beam screens
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
The integration of 420 m detectors into the LHC
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
E. Todesco LAYOUT FOR INTERACTION REGIONS IN HI LUMI LHC E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Dalena, M. Giovannozzi, R. De Maria,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
TC CO July HCC report HCC report Summary of the tests of the LSS8L power converters in short-circuit F. Rodríguez-Mateos on behalf of R.Ballet-Thouble,
FCC Refrigeration cost vs magnet temperature Laurent Tavian CERN, ATS-DO 15 February 2016.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HL-LHC IT STRING and Series test of SC link
UK-HL-LHC WP4 Cold Powering
The HL-LHC Circuits: Global View and Open Questions
Innovative He cycle Francois Millet.
Circuits description and requirements
SPS cryogenic proximity equipment and SM18 validation
Cryogenics for sc links, a short update
Arc magnet designs Attilio Milanese 13 Oct. 2016
Hollow e- lens, Cryogenic aspects
Main magnets for PERLE Test Facility
Circuits description and requirements - Closed Session-
The 11T cryo-assembly: summary of design and integration aspects
Superconducting Links and Cold Powering components for HL-LHC
WP3 Meeting – December the 10th 2015 H. Prin
DFH devices, under HL LHC WP06a: Design Status
Presentation transcript:

Warm cabling, cooling and ventilation L. Tavian, ATS-DO On behalf and under the controls of SWP17.2 and SWP17.3 Conceptual Design Review of the Magnet Circuits for the HL-LHC, March 2016

Content  Integration layout in URs  Integration constraints of warm DC cables  Basic conception of warm DC cables  Inventory and main characteristics  Cooling and ventilation requirements and margins  Conclusion Warm DC cables, cooling and ventilation, L. Tavian, 22 March 20162

Integration layout for DFHX and related power converters and warm DC cables Warm DC cables, cooling and ventilation, L. Tavian, 22 March DC-cable trays DC-cable trays WCC: Water-Cooled Cable ACC: Air-Cooled Cable

Integration layout for DFHM and related power converters and warm DC cables Warm DC cables, cooling and ventilation, L. Tavian, 22 March DC-cable trays DC-cable trays WCC: Water-Cooled Cable ACC: Air-Cooled Cable

Principle for cable-length calculation Warm DC cables, cooling and ventilation, L. Tavian, 22 March d2= 4 m L. Cable = d1 + 2xd2 L. Circuit= 2L. câble -Currently, no attribution of the electrical circuit to the current leads, -Position of the cable trays/convertors not exactly defined.

Integration constraints of DC cables Warm DC cables, cooling and ventilation, L. Tavian, 22 March A minimum elevation of the cable trays is required with respect to the current lead head to respect the minimum bending radius and the maximum interface forces and torques. Area reserved for cable support system I [kA] Section [mm2] h [mm] r [mm] Ext. D [mm] 182 x x

Integration of warm DC cable trays Warm DC cables, cooling and ventilation, L. Tavian, 22 March Warm DC-cable trays

LHC example Warm DC cables, cooling and ventilation, L. Tavian, 22 March kA (2000 mm2) warm DC cable Double warm cable configuration Cable supporting system for double cable configuration

Conception of HL-LHC warm DC cables  Based on LHC consolidated design, i.e.:  Fully halogen-free hoses  As maximum unit lengths of WCC below 50 m, no need of rigid Cu tubes and conical connections  Use of EPDM hoses (15-20-year life time (SM18 experience return))  Current-lead interface forces:  Accosting of the current lead must be performed by hand. Warm DC cables, cooling and ventilation, L. Tavian, 22 March 20169

Cable inventory Warm DC cables, cooling and ventilation, L. Tavian, 22 March Based on the new baseline proposal of D. Wollmann

Warm DC cable inventory & main characteristics Warm DC cables, cooling and ventilation, L. Tavian, 22 March

Losses to air of DC cables  Air cooled cables ACC: 100 % of the total losses  Water cooled cables WCC: Warm DC cables, cooling and ventilation, L. Tavian, 22 March m 2 per UR 9.5 K 10 W.m -2.K kW per UR

Warm DC cable losses to water and to ventilation air Warm DC cables, cooling and ventilation, L. Tavian, 22 March

Cooling water flow requirement Warm DC cables, cooling and ventilation, L. Tavian, 22 March

Cooling and ventilation margin  If CV systems designed for rated currents without contingency: Warm DC cables, cooling and ventilation, L. Tavian, 22 March Water cooling Air cooling Installed cooling capacity [kW]69443 Ultimate operation margin [%]228 Nominal operation margin [%]3312  No need of additional margin!

Evolution of DC-cable loss estimate vs time Warm DC cables, cooling and ventilation, L. Tavian, 22 March Large loss reduction (factor ~3 on water, ~5 on ventilation) ! Thanks to the global optimization of the powering scheme and of the UR integration. But…

… not true for all systems Warm DC cables, cooling and ventilation, L. Tavian, 22 March Change of technology (Tetrodes to IOTs) TetrodesIOTs

Conclusion  The conception of warm DC cables for HL-LHC is based on the LHC consolidated design  The integration of warm DC cables in the UR has started  refinement of the cable lengths will be needed when the current feed boxes (DFHX_M) will be designed and integrated.  At P1 and P5, the present powering scheme requires:  176 warm DC cables (72 WCC and 104 ACC)  Rated currents from 120 A to 13 kA  Unit cable lengths from 15 to 30 m  Thanks to the global optimization of the powering scheme and of the UR integration, the water cooling and ventilation requirements have been reduced.  Water cooling capacity: from 460 to 700 kW depending on the operating conditions.  Air cooling capacity: from 38 to 43 kW depending on the operating conditions. Warm DC cables, cooling and ventilation, L. Tavian, 22 March

Thank you for your attention! Warm DC cables, cooling and ventilation, L. Tavian, 22 March