The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue.

Slides:



Advertisements
Similar presentations
Status Report on Administrative Response to December 11, 2006 Alleghany Co. School Board Resolution on Alleghany High School Presented by Dr. Robert P.
Advertisements

Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee October 3, 2007 Workshop.
State Bridge Program STIP Development Process Oregon Department of Transportation October 3, 2007.
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
New I-65 Interchange at Worthsville Road Welcome!.
Alternative Project Delivery
Port St. Lucie City of Crosstown Parkway Extension Project Development and Environment (PD&E) Study & Environmental Impact Statement (EIS) Substantial.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Corridor #5 Update United States Senate Briefing September 26, 2007.
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
Project Background STIP update - City requests cancellation of US101 at Logan Road EA and proposes new modernization project: US101 at 32nd Street.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
FasTracks Moving Forward: Regional Transportation Plan (RTP) Amendment Staff Recommendation Phillip A. Washington and Team August 7, 2012.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
PWC Quarterly Transportation Report DATA Roundtable June 17, 2015 Rick Canizales – Chief Department of Transportation.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Public-Private Partnership Program 2015 Update 2015 American Council of Engineering Companies ACEC – Los Angeles Chapter Luncheon, July 8, 2015.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Jefferson Parkway Public Highway Authority Bidder Information Conference December 14, 2010.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Ottawa’s Light Rail Transit Project OLRT Update to Finance and Economic Development Committee March 2011.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
ARRA Design-Build in Minnesota Jay Hietpas - Mn/DOT.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
ECNM Meeting October 1, Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects.
 Working with FHWA on review.  Submit to Cooperating Agencies (EPA and Corp of Engineers)  45 day review May  Respond to agency comments  Publish.
FHWA CMGC Workshop October 23, Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that.
December 2,  Introductions  Disclaimers  Ground Rules  Project Overview  CMGC RFP Overview  CMGC Process  ICE/EE Procurement  Design Consultant.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
 Add potential impacts for a 53/135 interchange  Meeting with FHWA to resolve issues  Do not have a plan/timetable from FHWA for review.  Submit to.
Available at: hwy53relocation/sco ping.html hwy53relocation/sco ping.html.
 HDR, Ott Constructability, Dan Brown  Visit and boat tour of Rouchleau pit ◦ Access better than potrayed ◦ Challenging geotechnically 
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Southeast Rail Extension Update RTD Board of Directors FasTracks Monitoring Committee March 3, 2015.
Alternative Alignments Public Meeting
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
The Oakton Condominium Association September 12, 2017
Proposed Bay TMDL Schedule
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Reliability Standards Development Plan
Review plan of the nature reporting – update 6
SP TH 169 Redefine Informational Meeting July 25, 2019
White Flint North Entrance Feasibility Study
Presentation transcript:

The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue to provide a transportation facility that will safely maintain adequate roadway capacity and mobility as well as local, regional, and inter-regional connectivity

Allow existing TH 53 area to be entirely or partially vacated and mined by May of 2017 Construct the project to provide best value while minimizing future maintenance costs Minimize impacts to the environment Minimize or eliminate future risk to MnDOT related to mining operations Minimize impacts to all project stakeholders (includes utilities)

 Build Routes: ◦ M1 through UTAC ◦ E1A through the Rouchleau Pit (Fill and Bridge) ◦ E2 through the Rouchleau Pit  No-Build Routes: ◦ No-build (close the existing highway) ◦ Existing TH 53 (buy the easement)

PRELIMINARY – Subject to Change Looking Northwest

 Pros ◦ Short/direct route  Cons ◦ High Construction costs and schedule Risks ◦ Geotechnical issues ◦ Bridge foundations subject to mine blasting ◦ Not supported by landowner ◦ Air and Water quality issues ◦ Steep grades ◦ No trail ◦ No direct connection to 2 nd Avenue

PRELIMINARY – Subject to Change Looking Southwest

Stability Analysis – Typical Section

 Pros ◦ Less resource encumbrance than E2 ◦ Utility corridor ◦ Connection to 2 nd Avenue  Cons ◦ High Construction Costs and Schedule Risks ◦ Geotechnical issues ◦ 4% grades ◦ Low point in pit ◦ Air and Water quality issues ◦ Future bridge for haul trucks ◦ Seismic concerns/setbacks

PRELIMINARY – Bridge Type and Pier Location TBD Looking Southwest

 Pros ◦ Small footprint ◦ No dewatering required ◦ Good roadway profile ◦ Little resource encumbrance ◦ Manageable schedule risks  Cons ◦ Geotechnical issues ◦ Future bridge operating costs ◦ High Construction Costs ◦ Winter maintenance – icing ◦ Tall piers ◦ Utilities placement ◦ Seismic concerns ◦ Air and Water quality issues

PRELIMINARY – Bridge Type and Pier Location TBD Looking North

 Pros ◦ Shortest bridge ◦ Not in permit to mine area ◦ More bridge type options ◦ Less bridge maintenance ◦ Lowest Construction Costs and Schedule Risks  Cons ◦ Large resource encumbrance – ◦ Longer alignment ◦ Tall piers ◦ Geotechnical issues

Alternative E-2 Bridge Must accommodate Mesabi Trail & Utilities

Project Limits Proposed gas line Proposed electric substation Existing Utilities Virginia Eveleth Midway (Virginia)

StepsTimeframe DEIS publicationDecember 22, 2014 Public comment period for DEIS - 45 days.Ends February 5, 2015 Consultant prepares Draft combined FEIS/ROD ( 1 mo) February-early March 2015 Consultant submit Draft combined FEIS/ROD to OES March 9, 2015 OES review and commentMarch 23, 2015 Consultant revise combined FEIS/ROD per OES comments March 30, 2015 OES submit to FHWAApril 1, 2015 May 1, 2015 FHWA Review (30 days) Consultant submit revised FEIS (state publication version) to District/OES May 19, 2015 Consultant submit revised FEIS (state publication version) to FHWA May 21, 2015 District/OES approve and FHWA “approve” pending FEIS/ROD updates to occur in July By June 11, 2015 EQB Monitor DeadlineJune 15, Publish FEIS under state rules - Beginning of state comment period (10 business days). June 22, 2015 End of state comment periodJuly 6, 2015 FHWA/MnDOT agreement on additional noise balloting July 16, 2015 Noise ballot mailingJuly 17, 2015 Consultant/OES submit FEIS/ROD including all updates EXCEPT final noise voting information to FHWA. July 27, 2015 Meeting for additional noise wall votersAug 3, 2015 Submission of early Legal Sufficiency ReviewAugust 6, 2015? Receipt of votes on noise wall August 15, 2015 Consultant updates early Legal Sufficiency review version of FEIS/ROD to add final noise voting with conclusion/submits to OES August 17, 2015 Consultant completes revised Legal Sufficiency review version of FEIS/ROD and submits to OES and FHWA August 19, 2015 FHWA submits for enhanced Legal Sufficiency Review August 21, 2015 FHWA enhanced Legal Sufficiency Review of FEIS (2 weeks) August 24 -September 4, 2015 Receipt of Legal Sufficiency Review (to account for Labor Day) September 8, 2015 Consultant revise FEIS/ROD based on Legal Sufficiency Review September 10, 2015 MnDOT issues Adequacy Determination September 11,2015 Obtain MnDOT and FHWA signatures for FEIS/ROD September 15, 2015 FHWA submit FEIS/ROD to Federal Register publication By September 16, 2015 FEIS/ROD Publication in Federal Register By September 25, 2015 DONE 15 DAYS EARLY!

 What is it?  Why are we using it?  Construction Manager / General Contractor (CMGC) is an integrated approach to planning, designing and constructing a project. Owners, designers and contractors work collaboratively to develop the project scope, optimize the design, improve quality, and manage cost.

CMGC Contractor Procurement for Professional/Technical Service CMGC = Construction Manager General Contractor

 The project team worked in the Metro from March through September with the designer (Parsons Transportation Group) and Contractor (Kiewit) to: ◦ Refine work package contents. ◦ Advance the design work on three work packages. ◦ Design in constructability and risk reduction. ◦ Quantify baseline schedule and cost based on design information.

 A “work package” is a separate CMGC contract – a sub-project of the entire project to optimize the construction schedule and completion date.

 This contract is material procurement only.  Purchased prior to the completion of the environmental process at risk.  Cost: $17 million  Bid date: May 8, 2015  Estimated arrival: Summer of 2016

 Bridge of Rouchleau Pit  Roadway  Interchange with Bridge over TH 53  Drainage  Lighting  New signal at 2 nd Avenue West

 Bridge 69129: The big one ◦ Vetted bridge type and started formal bridge design in March 2015 ◦ The design was 100% complete 9/18/15 ◦ This is an incredible accomplishment!

 Bridge 69129: The big one

Borings needed here

 Roadway Design: ◦ Started in March 2015 ◦ Original goal was to finish in November of 2015 ◦ July 2015: Decision made to combine roadway package with bridge package  This meant accelerating roadway design by two months.  Completed: October 7, 2015

November begin construction Completion Date: November 2017