Purdue University HEU to LEU Conversion of PUR-1 Status Report TRTR Annual Meeting Lincoln City, OR September 2007.

Slides:



Advertisements
Similar presentations
1 Implementation Status of the U.S.-IAEA Additional Protocol Thomas Grice NMMSS Users Meeting May 20, 2009 Denver, CO.
Advertisements

Damaged Fuel Storage and Recovery A Case Study Natraj C. Iyer Savannah River National Laboratory June 2, 2010 May 31,- June 4, 2010, IAEA, Vienna, Austria.
Idaho Cleanup Project _____________________ ICP Spent Nuclear Fuel Examination Barbara Beller for Kathleen Hain, PBS-12 FPD April 15, NSNFP Strategy Meeting.
DOCUMENT RETENTION/ DOCUMENT ARCHIVE PROCESS South Texas College.
ESEA FLEXIBILITY WAIVER Overview of Federal Requirements August 2, 2012 Alaska Department of Education & Early Development.
Jeff Grosvenor, Interim Director
September 20, 2007 Douglas Morrell 2007 Status Report – DOE University Reactor Infrastructure and Education Assistance Program - University Reactor Fuel.
NREP 2009 Emergency Preparedness and the New Reactor Licensing Process: An Update on Where We Are Now Dan Barss Division of Preparedness & Response Office.
Port St. Lucie City of Crosstown Parkway Extension Project Development and Environment (PD&E) Study & Environmental Impact Statement (EIS) Substantial.
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
Express diagnostics of WWER fuel rods at nuclear power plants S.V.Pavlov, S.V.Amosov, S.S.Sagalov, A.N.Kostyuchenko 8th International Conference on WWER.
IAEA Perspective and Lessons Learned in Shipping HEU Spent Fuel to Russia Institute of Nuclear Materials Management 48 th Annual Meeting July , 2007.
Research Support Services UCH Facility Use Approval Workflow Management Update Jennifer Holcomb.
California Energy Commission James Madigan April 27, 2015.
THERMAL HYDRAULIC ANALYSIS FOR THE OREGON STATE REACTOR USING RELAP5-3D Wade R. Marcum Brian G. Woods 2007 TRTR Conference September 19, 2007.
Hanford Spent Nuclear Fuel and Cesium/Strontium Capsule Status Presented by Sen Moy - RL National SNF Meeting November 8, 2005.
4/2003 Rev 2 I.4.8 – slide 1 of 60 Session I.4.8 Part I Review of Fundamentals Module 4Sources of Radiation Session 8Research Reactors IAEA Post Graduate.
4/2003 Rev 2 I.4.8 – slide 1 of 60 Session I.4.8 Part I Review of Fundamentals Module 4Sources of Radiation Session 8Research Reactors IAEA Post Graduate.
National Spent Nuclear Fuel Strategy Meeting April 15, 2009 Dawn Gillas Federal Program Manager Nuclear Material Programs Division DOE-SR SRS Spent Nuclear.
Nuclear Science User Facilities NSUF Solicitation Overview Jeff Benson NSUF Program Administrator Idaho National Laboratory NSUF User Meeting 6/22/15 INL/MIS
CISM Advisory Council Meeting 4 March 2003 CISM Vision:
Government-Owned Nuclear Material at Non-Departmental Sites Peter Dessaules.
September TRTR Conference U.S. Domestic Reactor Conversion Programs Eric Woolstenhulme Dana Meyer.
ThorEA Presentation 13 April Oxford Title: Imperial College Reactor Centre – Proposal for ADSR Test Bed Trevor Chambers.
Design and construction of BNCT irradiation
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
U.S. Domestic Reactor Conversion Program Fuel Inspections and Quality Control David F. Capp Research Reactor Fuels Inspector/Engineer 2007 RRFM Conference.
Calendar for 2011 Months of the Year with Holidays.
1 DECOMMISSIONING 2007 TRTR CONFERENCE September 17-20, 2007 Lincoln City, Oregon Ted Carter.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
MASSIMO (Measurements in Adapted Spectra of Spectral Indices and Material Oscillations): A Proposed Experimental Campaign at the NRAD Reactor.
Work Related to Senate Bill 2202 (effective January 1, 2001)
NON-ACADEMIC POLICY TIMELINE For February 2010 Policies of great importance or policies that relate to a University regulation may need to go to the BOT.
Sources of Radiation Research Reactors
Research or marketing? The challenges of managing relations with funders Simon Evans.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
AJ Blotcky Research Reactor Pre-Bid Meeting 3 September 2014.
Structured Data Capture (SDC)
Teacher Evaluation Timeline
GCOS IP and Update on CEOS Response
Current F&A Negotiations – Sharing Experiences & Outcomes
Anastasia Savidou, Eleni Ntalla, A. Chanousis
NRC Update of Low Level Waste Emerging Issues
Vermont Yankee Decommissioning Update
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Spent Nuclear Fuel and Waste Disposition Program Update
Control Blade Design and Fabrication Improvements using Laser Welding
NRC Export and Import Licensing 10 CFR Part 110
THERMAL HYDRAULIC ANALYSIS FOR THE OREGON STATE REACTOR USING RELAP5-3D Wade R. Marcum Brian G. Woods 2007 TRTR Conference September 19, 2007.
The Impact of the HEU to LEU Fuel Conversion on the Lifetime and Efficacy of Beryllium: The primary neutron reflector at high- performance research and.
The University of Missouri Research Reactor
Analysis of Reactivity Insertion Accidents for the NIST Research Reactor Before and After Fuel Conversion J.S. Baek, A. Cuadra, L-Y. Cheng, A.L. Hanson,
CUR 505Possible Is Everything/tutorialrank.com
TECHjOSH.COM TechJosh.com.
CUR 505Competitive Success/snaptutorial.com
CUR 505Education for Service/tutorialrank.com
CUR 505 Education for Service-- snaptutorial.com
CUR 505 Teaching Effectively-- snaptutorial.com
Plant Vogtle Units 3 and 4 Alex Thirkell.
SKADS Controller’s Meeting Timeline Annual Financial Report
Research and Test Reactors Licensing Program 2013 TRTR Conference
Structured Data Capture (SDC)
Potential Milestones A timeline to finish in one year
Fission vs. Fusion.
Nuclear Decommissioning Citizens Advisory Panel (NDCAP) Certificate of Public Good (CPG) – Second ISFSI Pad & New 200 kW DG May 28, 2015.
Multiphysics Simulation Story: Researching a New Fuel for the HFIR: Advancements at ORNL Require Multiphysics Simulation to Support Safety and Reliability.
Researching a New Fuel for the HFIR: Advancements at ORNL Require Multiphysics Simulation to Support Safety and Reliability Redesign High Flux Isotope.
Operational Update 1.
2015 January February March April May June July August September
Presentation transcript:

Purdue University HEU to LEU Conversion of PUR-1 Status Report TRTR Annual Meeting Lincoln City, OR September 2007

TRTR Conference 2007 Lincoln City, OR PUR-1 Conversion PUR-1 history Conversion Timeline Assembly Redesign Lessons Learned

TRTR Conference 2007 Lincoln City, OR PUR-1 MTR Pool type Lockheed Nuclear Products 10 kW design Licensed at 1kW in 1962 Plate type, U-Al alloy clad in 1100 Al

TRTR Conference 2007 Lincoln City, OR Pool Layout

TRTR Conference 2007 Lincoln City, OR Core Layout 16 fuel elements –13 standard –3 control Graphite reflector Irradiation Facility

TRTR Conference 2007 Lincoln City, OR Conversion Timeline August 2005 – Initial site visit to Purdue by NNSA/GTRI, INL and DOE-NE October 2005 – Initial conversion analyses meeting with ANL October 2005 – Conversion kickoff meeting with INL, Y-12 and SRS staff at Purdue August 2006 – Conversion proposal submitted to USNRC

TRTR Conference 2007 Lincoln City, OR Timeline Continued March 2007 – RAI received from USNRC May 2007 – RAI answers back to USNRC May 2007 – Request for Possession Limit Extension July 2007 – Possession Limit Order July 2007 – Fuel Shipped to Purdue August 2007 – NRC issues order to convert

TRTR Conference 2007 Lincoln City, OR Timeline Continued Late August – HEU core disassembly, HEU assemblies prepared for transport/final disposition September 2007 – 23 day public comment period expires, start loading fuel on 8 September, 2 elements loaded.

TRTR Conference 2007 Lincoln City, OR

TRTR Conference 2007 Lincoln City, OR

TRTR Conference 2007 Lincoln City, OR Timeline continued 18 Sep 2007 – 14 of 16 elements in core Hope for criticality next week. Sometime in the future – Spent HEU shipped Physics measurements need to be completed, and NRC report submitted

TRTR Conference 2007 Lincoln City, OR Fuel Comparison Old HEU plate –U-Al alloy –93% U-235 –16.5 g U-235 per plate –1100 Al Clad –0.060 inches thick –124/148 Fueled Plates New HEU plate –U 3 Si 2 -Al –19.75% U-235 –12.5 g U-235 per plate –6061 Al Clad –0.050 inches thick –190/206 Fueled Plates

TRTR Conference 2007 Lincoln City, OR New Plates in Summer Plates, bolted at corners, 12.5 g U-235 per plate loading inch plate-to-plate spacing +/ of 206 plates predicted for target core

TRTR Conference 2007 Lincoln City, OR

TRTR Conference 2007 Lincoln City, OR

TRTR Conference 2007 Lincoln City, OR

TRTR Conference 2007 Lincoln City, OR

TRTR Conference 2007 Lincoln City, OR New Standard Assembly New plate-to plate spacing 0.144±0.015 inches (was ±0.020) New plate-to-wall spacing 0.127±0.008 inches (was ±0.020)

TRTR Conference 2007 Lincoln City, OR New Control Assembly New plate-to plate spacing 0.181±0.015 inches (was ±0.020) New plate-to-wall spacing ±0.008 inches (was ±0.020)

TRTR Conference 2007 Lincoln City, OR

TRTR Conference 2007 Lincoln City, OR

TRTR Conference 2007 Lincoln City, OR

TRTR Conference 2007 Lincoln City, OR

TRTR Conference 2007 Lincoln City, OR

TRTR Conference 2007 Lincoln City, OR Lessons Learned Work expands to fill time allotted Murphy’s Law O’Toole’s Commentary

TRTR Conference 2007 Lincoln City, OR

TRTR Conference 2007 Lincoln City, OR Special Thanks Idaho National Laboratory Argonne National Laboratory TLI-STS Jim Remlinger, Bill Vernetson