SPHENIX Project Overview John Haggerty Brookhaven National Laboratory.

Slides:



Advertisements
Similar presentations
Prototype sPHENIX Calorimeters
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
An SiPM Based Readout for the sPHENIX Calorimeters Eric J. Mannel IEEE NSS/MIC October 30, 2013.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
Jin Huang (LANL) for the PHENIX collaboration.  PHENIX collaboration actively pursue forward upgrade  Wide spectrum of forward physics considered 
Homework Questions for eRD1 EIC R&D Committee Meeting January 23, What are the concrete plans of eRD1 for the next two years? What are the deliverables.
Status of R&D on Calorimetry for EIC EIC Detector R&D Committee Meeting June 5, 2013 The EIC Calorimeter R&D Consortium Contact Persons: H.Z. Huang
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
The sPHENIX Barrel Upgrade: Jet Physics and Beyond John Haggerty Brookhaven National Laboratory on behalf of the PHENIX collaboration Quark Matter 2012.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
The Design of a Detector for the Electron Relativistic Heavy Ion Collider Anders Ingo Kirleis 1, William Foreman 1, Elke-Caroline Aschenauer 2, and Matthew.
C.Woody BNL sPHENIX EMCAL Conceptual Design sPHENIX Design Study Meeting September 7, 2011.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
Technology Choices for the sPHENIX Calorimeter Systems C.Woody For the PHENIX Collaboration CALOR12 Santa Fe, NM June 5, 2012.
ERD1 Homework assignment 1. Please provide a prioritized list of the proposed projects. 1. Ongoing BEMC R&D (Crystals, W/ScFI) 2. SiPM tests and evaluations.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
Generic Detector R&D for an Electron Ion Collider RHIC & AGS Annual Users Meeting T. Ludlam, June 2011.
R&D on W-SciFi Calorimeters for EIC at Brookhaven E.Kistenev, S.Stoll, A.Sukhanov, C.Woody PHENIX Group E.Aschenauer and S.Fazio Spin and EIC Group Physics.
SPHENIX in World Context Jamie Nagle (University of Colorado, Boulder) 1.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006.
The Tungsten-Scintillating Fiber Accordion Electromagnetic Calorimeter for the sPHENIX Detector Craig Woody, for the PHENIX Collaboration Physics Department,
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Jin Huang BNL.  GEANT4 customary code  PHENIX simulation/analysis  EICROOT by EIC taskforce at BNL (learning) RICH Discussions J. Huang 2.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Jin Huang (BNL) for the PHENIX collaboration Based on the ePHENIX Letter of Intent, arXiv: [nucl-ex] ● Physics goals ● detector design ● performance.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
Harvard Neutrino Group DoE Review August 21, 2006.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
A Silicon Photomultiplier (SiPM) Based Readout for the sPHENIX Upgrade S. Boose, J. Haggerty, E. Mannel, A. Sukhanov For the PHENIX Collaboration Introduction:
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
SPHENIX EMCAL R&D Craig Woody BNL sPHENIX Design Study Meeting September 7, 2011.
Calorimeters Design Issues and Simulation Needs C.Woody Physics Department Brookhaven National Lab EIC Simulation Workshop Oct 9, 2012.
Edouard Kistenev for the PHENIX Collaboration Calorimetry based upgrade to PHENIX at RHIC CALOR 2012 Santa Fe, NM, June 4-8, 2012.
EPHENIX for eRHIC 1 Mostly from Sasha’s Presentation from DIS.
Jin Huang BNL/LANL. ePHENIX Review J. Huang 2 RICH GEM Station4 EMCal HCal GEM Station2 R (cm) HCal p/A EMCal GEMs EMCal & Preshower TPC DIRC η=+1 η=
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
Jin Huang Brookhaven National Lab. eRD14 meeting Jin Huang 2 ~ →2020~2025Time Current PHENIX sPHENIX (+fsPHENIX) An EIC detector  14y+ operation.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
SPHENIX Mid-rapidity extensions: Additional Tracking system and pre-shower Y. Akiba (RIKEN/RBRC) sPHENIX workfest July 29,
A N DY Status Commissioning with colliding beams L.C.Bland, for AnDY 27 March 2012 Time Meeting, BNL.
Magnetic Fields in s/f/ePHENIX John Haggerty Brookhaven National Laboratory.
AB c CEBAF Hall D ASIC Needs in Nuclear Science T. Ludlam Brookhaven National Lab 1 RHIC.
Extending the PHENIX physics reach Physics beyond the baseline accessible at RHIC II Capabilities needed to address the new physics Detector upgrades to.
STAR Upgrade Workshop Dec 13-14, UCLA Organizing Committee: Xin Dong (LBNL), Carl Gagliardi (TAMU), Huan Zhong Huang (UCLA), Ernst Sichtermann (LBNL),
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Design of a New Electromagnetic Calorimeter for the sPHENIX Experiment at RHIC Craig Woody Brookhaven National Lab For the PHENIX Collaboration CALOR 2014.
Prospect of SiPM application to TOF in PANDA
Test Beam Request for the Semi-Digital Hadronic Calorimeter
HCAL M&O-B Budget CMS Finance Board
Target and Horn status report
ePHENIX Letter of Intent
Scintillator HCAL: LOI issues
Silicon tracker and sensor R&D for sPHENIX
Background Concept Results Conclusions
Presentation transcript:

sPHENIX Project Overview John Haggerty Brookhaven National Laboratory

sPHENIX We envision the first successor to the PHENIX experiment to be the premier experiment for making jet measurements in heavy ion collisions at RHIC and it consists of –A superconducting solenoid covering |η| < 1 (DOE MIE) –Central electromagnetic calorimeter (DOE MIE) –Central hadronic calorimeter (DOE MIE) –Silicon tracker –Electromagnetic pre-shower detector This apparatus provides a solid foundation for future experimentation at RHIC –fsPHENIX additional forward detectors for possible spin experimentation –ePHENIX completion of forward detectors for experiments at an eventual eRHIC EIC 7/29/20132

3 Proposal status The sPHENIX proposal timeline so far: –October 1, 2010 Decadal plan –July 1, 2012 Proposal submitted to BNL –October 5-6, 2012 Laboratory review –February 1, 2013 Revised proposal released –March 29, 2013 Submitted to ONP –May 7, 2013 ALD requests LOI for EIC due September 30 –May 30, 2013 ALD requests draft LOI August 31 –October 1, 2013 BNL submits PHENIX and STAR LOI’s and a transition plan to eRHIC to DOE

Collaboration comes together in workfests… September 2011 – Brookhaven workfest December 2011 – Boulder workfest January 2012 – Tennessee workfest February 2012 – Columbia workfest March 2012 – Florida State collaboration meeting April 2012 – Boulder workfest May 2012 – Brookhaven/Boulder writing November 2012 – Boulder workfest January 2013– Brookhaven workfest February 2013 – BNL Calorimeter workfest May 2013 – Santa Fe workfest July 2013 – ePHENIX workfest: Japan/RIKEN 7/29/20134

…which culminated in a proposal… Submitted to BNL a year ago Superconducting solenoid –2 T –70 cm inner radius –|η| < 1.1 Tungsten-scintillator EMCAL outside coil Steel-scintillator HCAL Silicon tracker with additional planes at about 60 cm Preshower detector 7/29/20135

6

…which was reviewed in October 2012 Very useful review at BNL by John Harris, Mike Harrison, Miklos Gyulassy, Jimmy Proudfoot, Raju Venugopalan, Bolek Wyslouch, Xin-Nian Wang “The Committee therefore strongly endorses the science case for this program.” Several recommendations to strengthen proposal –move discussion of non-DOE funded additional tracking and EMCal pre- shower from appendix to main body of MIE to underscore how they broaden the physics case –further GEANT studies –increase contingency on solenoid to reflect current-day challenges in procuring superconducting magnets 7/29/20137

f and e sPHENIX Even while imagining the sPHENIX detector as a world class detector for jet studies at RHIC, we realized that upgrades in the forward direction would give it additional physics capabilities in spin polarized collisions and in electron-ion collisions 7/29/20138 Concept for forward detectors at time of proposal

Where are we now? Proposal status –We have met with DOE ONP to establish a path forward –The new Associate Director (Berndt Mueller) and his Deputy (David Lissauer) have been very supportive –It has been made clear that sPHENIX must not be a dead end, but can be an important part of future experiments at an eRHIC (LOI) Physics status –Studies of jets near Tc is recognized as an important suite of measurements and theoretical activity is ramping up Detector status –Prototype detectors under construction for beam test –A very fortunate development with the magnet 7/29/20139

BaBar solenoid Built by Ansaldo, delivered to SLAC ~ T solenoid Major parameters of the cryostat: –Inner radius: 140 cm –Outer radius: 173 cm –Length: 385 cm I visited the coil in End Station A at SLAC on May 17, 2013 –It is packed in transfer frame for shipping –Power supply, quench detection, and dump resistor available –Some cryo components available (but most going to FRIB) –Freight cost $33k 7/29/201310

BaBar solenoid 7/29/201311

7/29/201312

7/29/201313

ePHENIX A Letter of Intent for an eRHIC detector based on sPHENIX is in preparation by many of those here The design being considered is based upon the BaBar magnet Lots of Monte Carlo simulation, detector design, magnetic field modeling… 7/29/201314

ePHENX LOI Internal Discussions Jin Huang, et. al.15 RICH GEM Station4 EMCal HCal GEM Station2 z (cm) R (cm) HCal p/A EMCal GEMs EMCal & Preshower μ-TPC DIRC η~1 η~ R (cm) GEM Station3 GEMs Station1 η~-1 e-e- e-e- AreoGel

7/29/201316

7/29/201317

Magnetic field 2D magnetic field calculations have been done for some geometries 3D models and optimization still to come 7/29/201318

Goals of detector development For the calorimeters, the goal is to build a reasonably large prototype of both calorimeters and beam test them in a beam at Fermilab –EMCAL 7x7 towers –HCAL 4x4 towers (inner and outer) –SiPM amplifiers and waveform digitizers –Stand 7/29/201319

Beam test Prototype EMCAL and HCAL beam test at Fermilab –7x7 EMCAL –4x4 HCAL T-1044 January 29-February 25, /29/201320

EMCAL SBIR Phase I with Tungsten Heavy Powder complete There have been uncertainties about the achievable tolerances for accordion and tapered plates Design altered to HCAL-like design (“tilted plate”) Purchase 0.5 mm plates for 7x7 prototype (1 mm absorber) 1 mm fibers on hand or available Several light collection ideas have been investigated by Sean and Craig 7/29/201321

Drawing for light collection structure 7/29/201322

Module read out with 2” pmt 7/29/201323

7/29/ sPHENIX HCal Prototype

7/29/201325

7/29/ Assembly of butted ribs and fasteners

SiPM development Steve Boose has been working with Andre, Eric, and Sal to build and test a number of versions of a temperature stabilized preamp for the Hamamatsu SiPM’s (the next few slides will show some of his results) There has been some testing with a preamp developed for ALICE at Oak Ridge by David Silvermeyr and Paul Stankus Craig submitted a joint order with STAR for about 150 SiPM’s for the prototypes Steve will manufacture preamp boards Some testing has begun on ganged SiPM’s 7/29/201327

HCAL scintillator Scintillating tiles with embedded WLS fiber as pioneered by T2K First articles produced, uniformity looks good Development of light collection scheme under way 7/29/201328

SiPM Temperature Stability Test Setup 297/29/2013

Temperature Controlled SiPM Housing SiPM board is contained in a temperature controlled housing. Two 5W Kapton heaters inside the housing. Two TE cooler modules with a thermistor for monitoring. External PID temperature controller. Water cooled blocks to remove heat from TE coolers.. SiPM TE Cooler Thermistor 307/29/2013

Stabilizer Results 7/29/201331

Beam test electronics We are planning to use some redeployed HBD waveform digitizers (60 MHz sampling) These are being used on the MPC 7/29/ Pulse from APD’s on MPC from Mickey Chiu

Simulation Chris Pinkenburg has defined, developed, debugged the calorimeter geometries and he has generated the “G4HITS” data Liang Xue has done a lot of work doing the next level of analysis 7/29/201333

7/29/201334

Simulation results Much more detail from Liang this afternoon We need some more effort on the simulation framework in software infrastructure, test cases, validation, getting the segmentation and geometry right The BaBar magnet gives us additional space which will allow us to improve the resolution 7/29/201335

Cost and schedule The sPHENIX cost estimate in the MIE proposal was –$29.1M of new equipment (including $7.9M for the magnet) –$6.3M of redirected labor We are still evaluating the costs with the BaBar solenoid; the detector is larger, and some costs go up, and there is the possibility of improved performance (EMCAL resolution, for example), removing a very risky $7.9M cost is a huge win We are engaged in a preliminary additional cost estimate for the ePHENIX detector to be included in the LOI 7/29/201336

Brookhaven Lab Timeline sPHENIX physics ePHENIX physics PHENIX physics

The path forward In the 13 months since we finished the proposal, we have made a lot of technical progress in all areas vital to the design of the sPHENIX barrel. In the next 6-9 months we need to Prove the performance of the prototype calorimeters –Instrument them with SiPM’s and electronics –Do a beam test Take the magnet design to next level (stresses, mechanical constraints, iterations on the field) and possibly take ownership of the coil Move forward on the tracking and pre-shower design (RIKEN Workfest, July 29-August 20 7/29/201338

One last thing I didn’t sufficiently acknowledge the tremendous contributions made by all the PHENIX collaborators who did all this work! We have come a long way! There’s a long way to go, but we can rightly pause for a moment to consider that… before we get back to some of the best parts of experimental physics, in which we imagine what’s possible and make it so 7/29/201339

7/29/201340