Accelerator Support and Maintenance Startup13. Access LIPA work Friday LIPA taking feed for Booster MMPS down for emergency repair. LIPA taking feed for.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Axxom: What happened so far. Basic case study  lacquer production scheduling  3 recipes for lacquers,  specifying processing steps,  resources used.
AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.
AGS/Booster Issues Feb. 25, 2014 Time Meeting Haixin Huang.
Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
RHIC Run th Time Meeting Tuesday 8 May 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 05/08/2012 Time Meeting, Run 12.
WAO Travis Shrey RHIC Machine Specialist Collider-Accelerator Dept Brookhaven National Laboratory 10/30/2014.
Outages During the Run Coping with the Power Company August 9, 2012.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Accelerator Support and Maintenance Run 14. Maintenance/Changeover Day Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
(Tentative) Plan for Last Days of School. Friday 5/8 / Monday 5/11 Work on empathy final project Tuesday 5/12 / Wednesday 5/13 (MIN.) Work on empathy.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow AGS hrs CA Specific Jobs only. AGS hrs CA Specific Jobs only. RHIC.
RHIC Run th Time Meeting Tuesday 5 June 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 06/05/2012 Time Meeting, Run 12.
Maintenance and Accelerator Support RHIC Start Up 12.
Maintenance and Accelerator Support RHIC StartUp10.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Take 5 for Safety E. Lessard June 2, Conduct of Operations Agreement 2  An updated set of practices for mission success and safe operation of large.
Maintenance and Accelerator Support RHIC Start Up 12.
PIP Status Report Linac Startup plans 12/05/2012.
RHIC Run 12 7 th Time Meeting 21 February 2012 WELCOME Safety SP's slide Experiments and Machine, status 1 02/21/2012 Time Meeting, Run 12.
May 06, 2013 Photo by Greg Vogel. Thursday, April 18, some tunnel work had to be suspended and many planned jobs had to be postponed due to the flooding.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Conduct of Operations Administrative Controls Ray Karol May 2010.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Agenda Safety Schedule Machine and system reports 2/26/2016G. Robert-Demolaize, Time Meeting1.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
 Safety  Schedule: Past, Present and Future  RHIC and Experiments Reports  Machine and Systems Reports  AOB.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
Run 10 Start-up Status
Haixin Huang AGS Cold Snake: Status and Plans.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Accelerator Support and Maintenance Startup for Run 13.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
5/15/ meeting. -21 work days to shutdown -31 calandar days to shutdown -Today is May 15 th all Jobs are supposed to be entered in the work list.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Time Meeting April 2, 2013 Agenda Safety Schedule Machine and system reports 04/02/2013Time Meeting, Run 131.
Maintenance and Efficiency
CUB Outage Schedule April 21, 2006.
Three Minute Timer Two Minute Timer One Minute Timer
Alexander Herlert, CERN (PH-SME-IS)
Name ______________ Period _____
2 Hours Minutes Seconds Insert Text Here.
2 Hours Minutes Seconds Insert Text Here.
Presentation transcript:

Accelerator Support and Maintenance Startup13

Access LIPA work Friday LIPA taking feed for Booster MMPS down for emergency repair. LIPA taking feed for Booster MMPS down for emergency repair. Scheduled Maintenance activities during the outage. Scheduled Maintenance activities during the outage. Official “Maintenance Days” after physics declaration. Official “Maintenance Days” after physics declaration. Friday treated same as MD. Friday treated same as MD.

Machine Status: LINAC and BLIP may run through the outage- NO ACCESS PLANNED. LINAC and BLIP may run through the outage- NO ACCESS PLANNED. AGS Controlled Access ~ hrs. AGS Controlled Access ~ hrs. RHIC and AtR opened in CA or RA during working hours. RHIC and AtR opened in CA or RA during working hours. Meeting to finalize schedule here, Thursday at 1500hrs. Meeting to finalize schedule here, Thursday at 1500hrs.

Major Jobs: PHENIX: PHENIX: AC repair. AC repair. Si detected insertion. Si detected insertion. e-Lens: e-Lens: Power tie-in. Power tie-in. Water tie-in. Water tie-in. Continued installation. Continued installation. AGS: AGS: Chiller work. Chiller work. Water System. Water System.

Tentative Schedule: 0800hrs: 0800hrs: Begin Accesses- AGS LOTO as necessary (begin early if RHIC store in progress). Begin Accesses- AGS LOTO as necessary (begin early if RHIC store in progress). RHIC access may be delayed slightly if store active. RHIC access may be delayed slightly if store active. 1600hrs: 1600hrs: Secure AGS, Restore systems. Secure AGS, Restore systems. Sweep RHIC as necessary. Sweep RHIC as necessary. 1800hrs: 1800hrs: Resume setup when power is restored. Resume setup when power is restored. Final details published 3/7. Final details published 3/7.