Health and Safety Executive Health and Safety Executive CDM 2007 Designers Version: September 07.

Slides:



Advertisements
Similar presentations
Risk Assessment. Objectives By the end of this presentation you will know: What risk assessment is; Where the need for risk assessment comes from; and.
Advertisements

Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Training Package Session 1- Overview Version:
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 3 – CDM co-ordinator Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Session 9 – Summary & Where Next? Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 5 – Principal contractors & contractors Version: September 2007.
© Imperial College LondonPage 1 Construction (Design & Management) Regulations 2007 Denis Murphy Construction Health & Safety Manager.
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR 4 th February 2011.
Construction (Design and Management) Regulations 2007
Construction (Design and Management) Regulations (NI) 2007 A Client’s Perspective Pat Hannaway CMIOSH MCIWEM MIWO I.Eng.
The Clients CDM Compliance Kit CDM The Clients CDM Compliance Kit PRODUCT OVERVIEW.
CDM 2015 Key Changes and Duty-Holder Responsibilities
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 Stakeholder Briefing HM Inspector of Health and Safety.
CDM Regulations – 2015 Are you prepared?. Contents  Introduction and Background  Changes to 2007 Regulations  Notifiable or Not?  Roles / Duties 
CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2015 “They’re out and they come into force on 6 th April 2015” Presented by Dave Carney (Director of Carney.
Appoint a CDM – Coordinator if is notifiable. What is notifiable Prevent work starting if if no coordinator and council not notified. Retain a health and.
Construction (Design and Management Regulations) 1994
CDM Regulations 2015 The Practical Implications of the Changes for the Construction Industry 17th June 2015 Slide 1 They say a journey of a thousand miles.
The Construction (Design & Management) Regulations
WORK HEALTH AND SAFETY ACT IMPLICATIONS FOR SMALL BUSINESS
Contractors CDM Compliance Kit CDM Contractors CDM Compliance Kit PRODUCT OVERVIEW.
CDM 2015 How relevant is CDM 2015 to a Facilities Manager? A Discussion Paper Prepared by Henry Penn April 2015.
WHS Management Plans.
CDM 2007 MAKING A DIFFERENCE Ken Logan. CDM 2007 : – Making a Difference The Challenge To change attitudes To change behaviours Achieve sensible risk.
1 CDM 2007 CDM 2007 Vs CDM 1994 Spot the Difference.
UK’s CDM Regulations 2007 and its Applications in Singapore
The CDM Co-ordinators CDM Compliance Kit CDM The CDM Co-ordinators CDM Compliance Kit PRODUCT OVERVIEW.
Risk Assessment – An Essential Standard
CDM - The Role of The Principal Contractor By John Johnston AIIRSM Health and Safety for Beginners
The Designers CDM Compliance Kit CDM The Designers CDM Compliance Kit PRODUCT OVERVIEW.
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
Health & Safety in Construction Key Issues for Designers, Managers & Contractors.
SHEPPARD ROBSON IN-HOUSE TRAINING TECHNICAL SEMINAR The Construction (Design & Management) Regulations CDM.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Overview Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2015 & information a view from HSE Louise Brearey Head of Operations HSE London & South-East.
DIRECT WORKS FORUM CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007 Aylesbury: Dunfermline: Belfast:
INFORMATION Information Packs, Construction Phase Plans and Health and Safety Files.
CDM 2007 Mike Lewis 6 th February New Construction (Design and Management) Regulations Revisions to the Construction (Design and Management) (CDM)
hansen – managing safely Risk Assessment - An Appreciation Mark Mallen Health and Safety Manager Fenlock-Hansen Ltd.
Health and Safety Executive Construction (Design and Management) Regulations 2007 – 2 and a bit years in Anthony Lees Construction Policy Unit.
Hansen – Managing Safely 1 Risk Assessment for Responsible Managers and Lead Assessors Mark Mallen Health and Safety Manager Fenlock Hansen Ltd.
CDM ( Construction design and management). The Construction (Design and Management) Regulations 2007 (CDM) are there to : improve health and safety in.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Competence & training Version: September 2007.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 The role of the client Paul Harvey HM Principal Inspector of Health and Safety.
Agenda  Safety Management in Roads Service  A review of the roles within CDM  What are the construction regulations?  What's in a H&S plan?  CDM and.
IOSH Midlands South Branch Legal Update 30 September 2015 Andrew Litchfield – Wragge Lawrence Graham & Co LLP.
Safe by Design Safe by Design Operation Maintenance and Repair
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
CDM Construction Design and Management
Health and Safety Executive Health and Safety Executive MANAGING CONTRACTORS Alec Ferguson HSE.
Roles & responsibilities Involving staff in safety management December 2015 Dr Emer Bell Integrated Risk Solutions.
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
CDM Client Briefing Tim Knowles
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Desk Based Preconstruction – Planning
Presented by Kevin Williams
Construction (Design and Management) Regulations (CDM) 2015
Temporary Works Co-ordination
Design Risk Management Spotlight on CDM 2015
CDM 2015 COSG Update.
The Construction (Design and Management) Regulations 2015
OHS–Occupational Health & Safety
Ray Filip BEng (Hons), MSc, DIC, CEng, FICE Temporary Works Consultant 31 years temporary works experience: Concor Construction (Africa) John Laing.
CDM 2015: PCI, CPP, Client Duties, IOSH Tyne & Wear Branch
Effective Construction Safety Management
Client duties on CDM Regulation 2015
Presentation transcript:

Health and Safety Executive Health and Safety Executive CDM 2007 Designers Version: September 07

Who are designers? (1) A ‘designer’ has a wide definition under CDM 2007 If you design or specify building work, then you are a designer with duties under CDM Duties apply to all projects, including non- notifiable and domestic It includes people who prepare –Drawings –Design details, analysis and calculations –Specification and Bills of Quantities The design could be on paper, computer or verbal CDM 2007 Designers – Slide 2

Who are designers? (2) Designers include –Civil and structural engineers –Building services engineers –Those specifying or purchasing materials –Temporary works designers –Interior fit out designers –Clients who specify –Design and construction contractors –Statutory bodies that require features that are not statutory requirements Statutory requirements are exempted i.e. Building Regs requirements are not designs under CDM 2007 CDM 2007 Designers – Slide 3

Who are designers? - Overseas designers Where the design work is undertaken by oversees designers, the designers duties under CDM 2007 falls on: –Person who commissions it if in GB or –The client for the work CDM 2007 Designers – Slide 4

Duties on designers (1) Designers have to: –Ensure clients are aware of their duties –Make sure they (the designer) are competent for the work they do –Co-ordinate their work with others as necessary to manage risk –Co-operate with CDM co-ordinator and others –Provide information for the health and safety file CDM 2007 Designers – Slide 5

Duties on designers (2) Designers have to avoid foreseeable risks SFAIRP by: –Eliminating hazards from the construction, cleaning, maintenance, and proposed use (workplace only) & demolition of a structure –Reduce risks from any remaining hazard –Give collective risk reduction measures priority over individual measures CDM 2007 Designers – Slide 6

Duties on designers (3) Designers must also: Take account of the Workplace (Health, Safety & Welfare) Regulations 1992 when designing a workplace structure Provide information with the design to assist clients, other designers, & contractors In particular – inform others of significant or unusual/ “not obvious” residual risks CDM 2007 Designers – Slide 7

Duties on designers (4) Designers have to be given relevant information by the CDM co-ordinator Risks which are not foreseeable do not need to be considered CDM 2007 does not require “zero risk” designs Amount of effort made to eliminate hazards should be proportionate to the risk CDM 2007 Designers – Slide 8

HSE’s expectation of Designers - apply the ERI(C) principles (1) Eliminate hazards By experience By red amber green lists (optional) By challenging existing practice By considering implications of their actions By talking/listening to contractors By complying with Workplace (Health, Safety and Welfare) Regulations 1992 Reduce remaining risks -Collective measures -Individual measures CDM 2007 Designers – Slide 9

HSE’s expectations of designers – apply the ERI(C) principles (2) Inform others Provide relevant information to project team: other designers, CDM co-ordinator, contractors In particular: highlight significant, “not obvious” risks, & those that are difficult to manage CDM 2007 Designers – Slide 10

Designing out risk – example of what can be done Simple design measure to reduce risk CDM 2007 Designers – Slide 11

Designing out risk – example of what not to do Inherent risks for future maintenance of flue pipe CDM 2007 Designers – Slide 12

Designers - Information Provide the right information to the right people at the right time How to inform –Method of informing is optional –Notes on drawings –Written information with the design –Suggested sequence of construction (only if not obvious) If in doubt – discuss it CDM 2007 Designers – Slide 13

Designers – co-operation A more managed approach will be necessary for larger projects: –integrated team involving designers, principal contractor and other relevant contractors –the appointment of a lead designer, where many designers are involved –agreeing a common approach to risk reduction during design –meetings of the design team (including the CDM co- ordinator) with contractors, and others –regular reviews of developing designs –encourage site visits, so designers can see how risks are managed on site and vice versa CDM 2007 Designers – Slide 14

Designers - Paperwork Competent designers eliminate hazards and reduce risks – manage the risk, not paperwork. Design risk assessments (DRAs) are seen by many as unhelpful and should be discouraged –Just say no to thoughtless DRA but yes to eliminating hazards CDM 2007 does not require designers to produce copious amounts of paperwork detailing generic hazards and risks CDM 2007 Designers – Slide 15

Designers - Records Designers under CDM 2007 are not legally required to keep records of the design process But –Brief records why key decisions were made will be helpful when designs are passed to another, to prevent decisions being reversed for the wrong reasons CDM 2007 Designers – Slide 16

Designers – design review A process of design review will help to ensure buildability, usability, & maintainability Designers should involve the contractor when reviewing buildability Designers should involve the client (or building operators) when reviewing usability and maintainability Involve the CDM co-ordinator if project is notifiable CDM 2007 Designers – Slide 17

Additional duties for notifiable projects Check that the client has appointed a CDM co-ordinator Only ‘initial’ design work is permitted until a CDM co-ordinator has been appointed Co-operate with the CDM co-ordinator, principal contractors and with other designers or contractors so all can confirm with their CDM duties Provide relevant information for the health and safety file CDM 2007 Designers – Slide 18

Designers - “Do not……” And never have been asked to control risk on site - they can only influence what is within their control Take into account unforeseeable hazards and risks Design for possible future uses of structures that cannot reasonably be anticipated from their design brief Specify construction methods, except where the design requires a particular construction sequence Exercise a health and safety management function over contractors or others Have to consider trivial risks CDM 2007 Designers – Slide 19

Designers – Key messages If you design or specify building work, then you are a designer with new duties under CDM Competent designers eliminate hazards and reduce risks – manage the risk, not the paperwork Design for safety and health for those that build, use, maintain and demolish – it’s safer by design Tell others about significant risks which remain – give the right information to the right people at the right time CDM 2007 Designers – Slide 20