“Then, Now and Next” June 24, 2015 HEP Division ISM Seminar Roby Enge Director, ESQ Division.

Slides:



Advertisements
Similar presentations
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
Advertisements

Carbon Footprint Ltd © Carbon Footprint Ltd 2014 Environmental Management Systems (EMS) What they are, how to get one and how to.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Fermilab Environmental Management System (EMS)
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
1 Environmental Management SMITE: 1 st Awareness Campaign Eng. Samer Abu Manneh.
The Australian/New Zealand Standard on Risk Management
SLAC ES&H Overview Craig Ferguson March Operating Model ES&H Mission Critical Issues Challenges Path forward Topics October 2008.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
1 Safety Management in Construction Research Study Preliminary Results—April 2013 Safety Management in the Construction Industry: Identifying Risks and.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Protection of the environment from ionising radiation - views of a regulator.
Process Safety Management
Risk Assessment – An Essential Standard
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
1 The Standards Based Management System Approach to Deploying the Environmental Management System at Oak Ridge National Laboratory Dr. Fay Frederick, Division.
DOE-HSS Review of LBNL Science Divisions 10/23/08.
People Health Audit Frank Newman, C.H.R.L. Newman Human Resources  35 years HR experience  Finance Industry, Pharmaceutical Manufacturing, Semi-Conductor,
Safety Analysis Working Group FY2010 EFCOG Semi-Annual Meeting Brad Evans, Chair Pacific Northwest National Laboratory Rob McKeehan, Vice-Chair Oak Ridge.
Corporate Responsibility and Third Party Relationships GSK and Contract Manufacturers James Hagan Vice President Corporate Environment, Health & Safety.
10 CFR 851 Worker Safety and Health Program Overview.
Work Planning & Control for R&D Activities – Lessons Learned 2007 ISM Workshop – Brookhaven National Lab John Miller Manager, SRNL Safety Programs Lori.
Science What is “Safety” Freedom from danger Safety is the condition of being protected against failure, breakage, error, accidents, or harm. (Protection.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
1 Global MSD INITIATIVES Global Business Process Standardisation SCITe a) S & OP, b) OCI GAME COE Management Information Refinery Management System MSD.
1 Los Alamos Legacy Cleanup Completion Project (LCCP) Post Fiscal Year 2016 Contract(s) Industry Day Request For Information & Capability.
NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Commissioner William C. Ostendorff FR/SSO/FS Workshop U.S.
Kay Higby Responsible Care Superintendent ISO Management Representative Akzo Nobel Functional Chemicals, LLC.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
1 International Working Forum on Regulatory Supervision of Legacy Sites (RSLS) Technical Meeting Amel MELLOUK – ASN / DRC Jérémie VALLET – MEDDE/MSNR Regulatory.
ISMS QMS Integration Dr. Thomas Helms, Parsons DOE SRS SWPF Project.
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
Wednesday 13 th February 2013 Ramside Hall, Durham Process Safety Management – Challenges for Implementation Allan Laing, CEO, Pentagon February 2013.
Systems and Software Consortium | 2214 Rock Hill Road, Herndon, VA Phone: (703) | FAX: (703) Best.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
1 D D O C U M E N T A T I O N & I N F O R M A T I O N S E R V I C E S 1 Achieving and Maintaining High Reliability through Human Performance.
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
River Corridor Closure Project 1 Safety Teamwork Disciplined Operations Integrity River Corridor Closure Project Safety Teamwork Disciplined Operations.
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
Responsible Care® Health & Safety Task Force – 06 H&S.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
Brookhaven Science Associates U.S. Department of Energy Leveraging the Management Review Process of ISO and OHSAS for Facility-level and Institutional-level.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
1 IMPLEMENTING DOE ORDER ENVIRONMENTAL MANAGEMENT SYSTEMS U.S. Department of Energy Richland Operations Office.
Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dash Board Process Mike.
6-1. 항공안전평가프로그램 항공안전본부 항공기술과 항공사무관 이광희 6-1. 항공안전평가프로그램 항공안전본부 항공기술과 항공사무관 이광희
10 CFR 851 Worker Safety and Health Program Bill McArthur, PhD, CIH Director, Office of Worker Safety and Health Policy Office of Health and Safety.
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
APPROACH TO A FULLY INTEGRATED PERFORMANCE ASSURANCE SYSTEM Integrated Safety Management Summit Knoxville, TN August 24-27, 2009 Presented by: Gary Grant.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
EFCOG Safety Working Group (SWG) Status June 7, 2016 EFCOG Working Group Coordination Meeting Washington, DC John McDonald, SWG Chair.
Safety in the Context of OSHA and DOE Expectations Betsy Dunn Manager, Worker Safety and Health April 23, 2015.
Fermilab Environmental Management System (EMS) Senior Management Training Module FN000378/CR/01.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Pete Davis EW Safety Team Manager
Program Review June 2004 Good Morning
Environmental Health and Safety (EH&S) Supplier Awareness Training
New Employee Orientation
The Federal Oversight and Contractor Assurance System Directives Safety Culture Improvement Panel Meeting September 7, 2016 Patricia.
Contractor Assurance Systems (CAS) Summit August 23, 2016
IAEA General Conference Regulatory Cooperation Forum Regulatory Approach Prescriptive vs Performance Based David Senior Executive Director -
Regulatory Oversight of HOF in Finland
2018 EFCOG Safeguards & Security Working Group Annual Meeting
Presentation transcript:

“Then, Now and Next” June 24, 2015 HEP Division ISM Seminar Roby Enge Director, ESQ Division

Then  Changes in safety policy, law and procedures within DOE closely paralleled changes taking place in the nuclear safety and radiological controls areas.  March 28, 1979 – Three Mile Island sends a shudder throughout the nuclear power plants in the United States. –NRC ramps up its rigor. Aspects of Admiral Rickover’s nuclear propulsion program are adopted. “Rigor in Operations” and “verbatim compliance” are evident. –DOE, up to this point, remained unscathed with defense nuclear activities remaining, for the moment, somewhat protected due to the classified nature of many activities. 2

Then (cont’d) Chernobyl: April 26, 1986  Shook the world  29 deaths (firefighters)  Thousands exposed to elevated radiation levels  Need for information and assurance that such events wouldn’t happen here  DOE did not escape review this time 3

Then (cont’d) Tiger Teams   Admiral James D. Watkins – Secretary of Energy (Rickover protége)  Reviewed “rigor” of safety and operations across DOE  Found “expert based” systems in place rather than “process based” systems 4

Then (cont’d)  Lack of rigor: Improvement needed – now! –Formality of operations –Assessment driven –Leadership involvement in all phases –Quality assurance programs –Corrective action programs  Results: Regulations issued by DOE –10CFR830 – Nuclear Safety –10CFR835 – Radiation Protection –10CFR708 – Whistle Blower –10CFR851 – Worker Safety & Health –10CFR824 – Security –DEAR Clause (ISM) 5

Impact on National Labs  Public awareness and scrutiny  Defense Nuclear Facilities Safety Review Board  Freedom of Information Act  DOE no longer “behind the curtain” 6

Impact on National Labs  1994: PNNL receives a letter from DOE – Improve Ops.!  : Brookhaven loses contract  : Los Alamos Security and Safety events stop many operations  2000: Incumbent contractor at Oak Ridge loses to Battelle  2003: SLAC electrical shock accident – shuts down LINAC for months  2007: Nuclear Facility Footprint Reduction at Argonne following Bldg. 205 review  2013: Bldg. 205 work paused for ~8 months 7

Integrated Safety Management (ISM)  In mid 1990’s the ISM concept was prepared and accepted by DOE  Labs implemented ISM in late 1990’s and early 2000’s (DEAR Clause in M&O Contracts)  Roots in Quality management – Plan, Do, Check, Act  Process over Expert Based System  Safety Performance improved fairly uniformly across DOE  Focus –Understand scope of work –Hazard analysis –Controls –Perform work within controls –Feedback and Improvement  Wrap the right safety envelope around the work in a formal way using a formal process

Now  We have implemented ISM  Work Planning & Control (WPC) is in the primary ISM tool  Rely on line management to drive effective use of the tool (ISM Guiding Principle #1 – Line Management is Responsible for Safety) Issues:  Skill of the worker/researcher  Use of WPC (e.g. Lift table) – Is WPC a “momentum killer” for R&D innovation?  Comparison to Industrial R&D (DOW & Dupont) –Many years of safety culture – driven by significant past safety events –“Safety is NOT Negotiable” –“Safety is a condition of employment” –“If you are not convinced it can be done safely, don’t do it” –“Spend the first dollar on Safety” –Safety has to be integrated, part of the way we do research, not bolted on –Line managers are accountable for safety, ESH is primarily a resource provider (systems, processes, tools and services) 9

Next: ISM → IM or Integrated RISK Management 10 Risk Management SafetyFinanceSecurityReputationMission Regional Politics

11 Proposal Stage Mission Reputation Safety Security Politics Waste Forecast Plan/Perform Work (WPC) Safety Envelope Security Financial Schedule Project Close Out Orphan Chemicals Orphan Equipment Residual Material/Hold-up Waste Disposal Safety Security Reputation Project Life Cycle PROJECT LIFE CYCLE

Where are we? We can demonstrate rigor in safety with WPC at the plan/perform work stage Likely have schedule, security and finance covered at this stage as well 12 PROJECT LIFE CYCLE

Competition: When??  DOE selects contractor – they own the site  Science and operations excellence (PEMP Reviews) (Innovative Lab Management)  Violations, HSS findings  Third party validations (e.g. the ISO standards) are noted – especially if absent!  Lab management systems rigor/Integrated Management  Events/ORPS/NTS reports  Safety Performance  Financial Performance  Security Performance  HR Performance  Facilities Construction/Management  One Argonne (Consistency counts)  Reputation as R&D Site Operator 13

Questions? 14

Thank you for your time! Please – always feel free to call, write, stop by, or ask me over to talk about your ideas, concerns, or requests. Roby Enge Building 201, Room