Faculty of Applied Engineering and Urban Planning Civil Engineering Department Engineering Economy Lecture 1 Week 1 2 nd Semester 20015/2016 Chapter 2.

Slides:



Advertisements
Similar presentations
Copyright Oxford University Press 2011 Chapter 2 Engineering Costs and Cost Estimating.
Advertisements

System Engineering & Economy Analysis Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
26-1 C APITAL B UDGETING LONG-RANGE PLANNING CHAPTER 26.
McGraw-Hill/Irwin Slide 1 McGraw-Hill/Irwin Slide 1 Capital budgeting: Analyzing alternative long- term investments and deciding which assets to acquire.
Basic Management Accounting Concepts Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western, a division of Thomson.
COST CONCEPTS AND DESIGN ECONOMICS
Engineering Economic Analysis - Ninth Edition Newna/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis 9th.
Cost Terminology and Concepts. Basic Cost Terminology Cost – resource sacrificed to achieve a specific objective Actual cost – a cost that has occurred.
(c) 2002 Contemporary Engineering Economics 1 Chapter 3 Cost Concepts and Behaviors General Cost Terms Classifying Costs for Financial Statements Cost.
1. Cost Concepts & Design Economics
Advanced Engineering Economy Contemporary Engineering Economics, 5th edition, © 2010.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 4 How Businesses Work.
1 Engineering Economics Engineering Costs and Cost Estimating William Loendorf, P.E.
Chapter 6 Cost of Production.
1 Management Decision Making. 2 Lecture Outline Cost Volume Profit Analysis Equation Method Assessment of Risk Assumptions Contribution Margin Method.
CHAPTER TWO The Nature of Costs. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 2-2 Outline of Chapter 2 The Nature of.
Chapter 4 How Businesses Work McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Binghamton University Thomas J. Watson School of Engineering and Applied Science State University of New York.
ENGR 112 Economic Analysis. Engineering Economic Analysis Evaluates the monetary aspects of the products, projects, and processes that engineers design.
Engineering Economy Practice Problems for Exam 5 By Douglas Rittmann, Ph.D., P.E.
CTC 475 Review  Course Requirements  Applications  Multiple Decision Criteria  Selling The Project  PSP.
1 CHAPTER M6 Making Decisions Using Relevant Information © 2007 Pearson Custom Publishing.
CAPITAL BUDGETING (REVIEW)
1 EGGC4214 Systems Engineering & Economy Lecture 2 Cost Concepts and Economic Environment.
Chapter 7 Fundamentals of Capital Budgeting. 7-2 Chapter Outline 7.1 Forecasting Earnings 7.2 Determining Free Cash Flow and NPV 7.3 Analyzing the Project.
Chapter 2 Basic Managerial Accounting Concepts
Module 8 Introduction to Cost Accounting
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Obtaining and Estimating
1 ECGD3110 Systems Engineering & Economy Lecture 3 Interest and Equivalence.
1 ECGD3110 Systems Engineering & Economy Lecture 3 Cost Estimation.
IE 475 Advanced Manufacturing Costing Techniques
Engineering Economic Analysis Canadian Edition
NPV and the Time Value of Money
System Engineering & Economy Analysis
1 ECGD4214 Systems Engineering & Economy. 2 Lecture 1 Part 1 Introduction to Engineering Economics.
Capital Budgeting MF 807 Corporate Finance Professor Thomas Chemmanur.
Engineering Costs and Cost Estimating. Manufacturing Cost Structure Direct Materials Direct Labor Direct Labor: Cost of all “hands-on” effort required.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Break Even Point and Payback Period Course Outline 11.
Lecture 7 and 8 Rules of Capital Budgeting Corporate Finance FINA 4332 Ronald F. Singer Fall, 2010.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Cost Terminology and Concepts. Basic Cost Terminology Cost – resource sacrificed to achieve a specific objective Actual cost – a cost that has occurred.
Contemporary Engineering Economics Contemporary Engineering Economics, 5 th edition, © 2010.
MTH108 Business Math I Lecture 11. Chapter 5 Linear Functions: Applications.
The Nature of Costs Chapter Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
1/26/2016rdcw2a-1 Engineering Economic Analysis Chapter 2  Engineering Costs and Cost Estimating.
Engineering Economic Analysis Canadian Edition
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Chapter 9 Project cash flow analysis 1.Understanding project cost elements 2.Why use cash flow in economic analysis 3.Income-tax rate to use in economic.
Chapter 36 Financing the Business Section 36.1 Preparing Financial Documents Section 36.2 Financial Aspect of a Business Plan Section 36.1 Preparing Financial.
1 Engineering Economics Engineering Economy It deals with the concepts and techniques of analysis useful in evaluating the worth of systems,
Cost Analysis By Rahul Jain. Topics for discussion Total Revenue and Total Cost Opportunity Cost Total and Average Fixed Costs Total and Average Variable.
LECTURE 4 types of costs.
Chapter 3: Cost Estimation Techniques
Inflation and Its Effects on Project Cash Flows
Chapter 3: Cost Estimation Techniques
Lecture 7 Capital Budgeting Complications
By Muhammad Shahid Iqbal
Engineering Economics Engineering Costs and Cost Estimating
Cost Concepts and Design Economics
Meaning and Measure of Inflation
Chapter 3: Cost Estimation Techniques
Chapter 3: Cost Estimation Techniques
Chapter 2 FUNDAMENTAL COST CONCEPTS
CTC 475 Review Inflation Inflation rate f is the rate of change in the value of currency (inflation/deflation) Inflation-free rate i represents a gain.
Managerial Accounting 2002e
CTC 475 Review Course Requirements Applications
Economics and Project Management
Chapter 3: Cost Estimation Techniques
Presentation transcript:

Faculty of Applied Engineering and Urban Planning Civil Engineering Department Engineering Economy Lecture 1 Week 1 2 nd Semester 20015/2016 Chapter 2 Engineering Costs and Cost Estimating

Engineering Costs and Cost Estimating  Cost Types: Fixed and Variable Direct and Indirect Marginal and Average Sunk and Opportunity Recurring and Non- Recurring Incremental Cash and Book Life-Cycle

Engineering Costs and Cost Estimating  Estimating Costs: Per-Unit Model WBS Model Cost Indices  Estimating Benefits  Cash Flow Diagrams

Cost Types

Engineering Costs and Cost Estimating Engineering Costs: Value of the economic resources used in the production of goods and services. Examples:Land, labor, capital or initial investment, wages and salaries, material purchases, utilities Cost estimating: Approximating the cost of resources or activities Cost estimating is necessary for any economic analysis Key Question: Where do the numbers we use in an engineering economic analysis come from? When working in industry, you may need to consult with professional accountants to obtain such information

Classification of Costs Fixed Costs: Costs that do not vary (i.e., constant and unchanging regardless of the level of the activity. Variable Costs: Costs that vary in total with the quantity of output or other measures of activity level.  Total Cost is the sum of Fixed Cost and Variable Cost. Direct Costs: Cost that can be reasonably measured and allocated to a specific output or work activity. Indirect/Overhead Cost: Cost that it is difficult to attribute or allocate to a specific output or work activity.

Example 2-1 Amin plans to charter a bus to take people to see some event s how in the city. He categorized his costs at shown below: Which of the costs are fixed and which are variable costs? How do we compute Amin’s total cost if he takes n people to City? Total Cost = Fixed cost + Variable cost = $225 + $20 n

Average and Marginal Costs Average Cost: Computed as total cost divided by the number of units produced. Marginal Cost: The change in total cost that arises when the quantity produced changes by one unit; i.e. the cost to produce one more unit. Avg. Cost = TC/n = ($225+$20n)/n For n = 33, TC = $885 Avg. Cost = $885/30 = $29.50 Total cost cannot be calculated from an average cost valueFor n =35: ¨ TC ¹ 35*($29.50) = $ 1,032.50

Example 2-2 Do we have enough information yet to decide how much money Amin will make on his venture? What else must we know? Amin needs to know his total revenue Amin knows that similar ventures in the past have charged $35 per person, so that is what he decides to charge Total Revenue = 35n (for n people) Total profit = Total Revenue – Total Cost 35n – ( n) = 15n – 225 Question: How many people does Amin need to break even? (not lose money on his venture) Solve:15 n – 225 = 0 => n=15 more than 15, he makes money

Breakeven Analysis Where is the Loss Region? Where is the Profit Region? Where is the Breakeven Point? It is the point where total revenue received equals total costs associated with the sale of the product

Profit and Loss Terms (non-linear cost and revenue) Total revenue = Unit price x units sold Breakeven: total revenue = total costs  Just getting by Profit region: total revenue > total costs  Putting money in the bank Loss region: total revenue < total costs  Going into debt

Sunk (Past) Costs A sunk cost is money already spent due to a past decision.  As engineering economists we deal with present and future opportunities  We must be careful not to be influenced by the past  Disregard sunk costs in engineering economic analysis Example: Suppose that three years ago you bought a laptop PC for $2,000.  How likely is it that you can sell it today for what it cost?  Suppose you can sell the laptop today for $400. Does the $2000 purchase cost have any effect on the selling price today? The $2,000 is a sunk cost. It has no influence on the present opportunity to sell the laptop for $400.

Opportunity (Future) Cost An opportunity cost is a benefit that is foregone by engaging a business resource in a chosen activity instead of engaging that same resource in the foregone activity. Example: Suppose your wealthy uncle gives you $75,000 when you graduate from high school. It is enough to put you through college (5 years at $15,000 per year). It is also enough for you to open a business making web pages for small companies instead of going to college.You estimate you would make $20,000 per year with this business. If you decide to go to college you give up the opportunity to make $20,000 per year  Your opportunity cost is $20,000  Your total cost per year is $35,000

Recurring and Non-Recurring Costs Recurring costs are those expenses that are known, anticipated, and occur at regular intervals.  These costs can be modeled as cash flows. Non-recurring costs are one-of-a-kind (one-time) event that occurs at irregular intervals.  They are difficult to plan for or anticipate. Example: A company decided to landscape a lot of ground and then care for it. Which are recurring and which are non-recurring costs the company incur?  Remove existing trees, vegetation  Have land graded with bulldozer  Have yard planted with grass  Plant shrubs, trees  Mow grass  Fertilize grass, shrubs  Water grass, shrubs

Incremental Cost Incremental Cost is the additional cost that results from selecting one alternative over another. It is the difference in cost between two alternative investments or activities.

Example

Solution Let's look more closely at each of the data items. Distributor's purchase price 3 years ago: This is a sunk cost that should not be considered in setting the price today. Distributor's storage costs to date: The storage costs for keeping the pumps in inventory are sunk costs; that is, they have been paid. Hence they should not influence the pricing decision.

Solution Distributor's list price 3 years ago: If there have been no willing buyers in the past 3 years at this price, it is unlikely that a buyer will emerge in the future. This past list price should have no influence on the current pricing decision. Current list price of newer pumps: Newer pumps now include technology and features that have made the older pumps less valuable. Directly comparing the older pumps to those with new technology is misleading. However, the price of the new pumps and the value of the new features help determine the market value of the old pumps.

Solution Amount offered from a buyer 2 years ago: This is a forgone opportunity. At the time of the offer, the company chose to keep the lot and thus the $5000 offered became an opportunity cost for keeping the pumps. This amount should not influence the current pricing decision. Current price the lot could bring: The price a willing buyer in the marketplace offers is called the asset's market value. The lot of old pumps in question is believed to have a current market value of $3000.

Cash Costs vs. Book Costs Cash Costs: require the cash transaction of dollars out of one person’s pocket into the pocket of someone else. Book Costs: cost of a past transaction that is recorded in a book (accounting book) of a firm.  Do not represent cash flows  Not included in engineering economic analysis  One exception is for asset depreciation (used for tax purposes) Example: You got offers to sell your car for $6,000 (i.e., the book value of your car is $6,000). The book value can be thought of as the book cost. If you actually sell the car to a friend for $5,500, then the cash cost to your friend is $5,500.

Life-Cycle Costs Life-cycle Costs are the summation of all costs, both recurring and nonrecurring, related to a product, structure, system, or service during its lifetime. Products go through a life cycle in phases: 1. Assessment & Justification 2. Conceptual or Preliminary Design 3. Detailed Design 4. Production or Construction 5. Operational Use 6. Decline and Retirement Engineers should consider all life-cycle costs when designing products and the systems that produce them. About 70-90% of all costs are set during the design phases when only 10-30% of cumulative life-cycle costs have been spent.

Cost Estimation

Cost Estimating Engineering economic analysis is future based. Future consequences (costs and benefits) of current decisions and require estimating. Estimated costs and benefits are not known with certainty.  The more accurate the estimate, the more reliable the decision.  Difficulties arise due to an uncertain future. Types of estimates:  Rough: gut level; Inaccurate; -30% to +60%.  Semi-detailed: based on historical records; Reasonably sophisticated and accurate; -15% to +20%.  Detailed: based on specifications and cost models; Very accurate; -3% to +5%.  One-of-a-kind or first time projects: Few such projects in engineering economic analysis. Estimator experience and knowledge è better quality (and more reliable) estimates.

Estimating Cost Using Per-Unit Cost Uses ―per unit factor to develop estimate Very simple yet useful technique for rough estimates Commonly used in construction industry Examples:  Service cost per costumer  Safety per employee  Gasoline cost per mile  Maintenance cost per window  Mileage cost per vehicle  Utility cost per square foot of floor space Example: A contractor gave you a quote to build you a house for $250 per square meter. What’s your cost to build a 200 sq. meter- house? Ans. Cost = 250 x 200 = $50,000

(Estimating Cost Using WBS Cost (Segmenting Model Work Breakdown Structure (WBS) is a graphical tool widely used in the project planning process. It organizes all of the project work by placing elements of work into logical groupings; thus, providing a convenient and logical structure for estimating the cost of each activity.

Cost Estimating Using Cost Indices Governments usually publish cost index data for labor, construction, and materials. The best-known example is the consumer price index (CPI), a measure of inflation.  The measure is scaled, so it is only the relative values of any two measures that are meaningful.  For example, in 1920, the measure was about 20; in 1997 it was about 160. The conclusion is that one would have to spend 160/20, or 8 times as much in 1997 as in 1920 for the same consumables. Cost indices work in the same way as price indices. Cost indices are dimensionless.

Cost Estimating Using Cost Indices Example 2-7:Miriam needs to estimate annual labor cost for a new plant. For a similar facility built 3 yrs ago, annual labor cost was $2,455,000. CPI was at yrs ago but it is 715 today.

Estimating Benefits For the most part, we can use exactly the same app roach to estimate benefits as to estimate costs:  Fixed and variable benefits  Recurring and non-recurring benefits  Incremental benefits  Life-cycle benefits  Rough, semi-detailed, and detailed benefit estimates  Difficulties in estimation  Segmentation and index models Major differences between benefit and cost estimation:  Costs are more likely to be underestimated  Benefits are most likely to be overestimated  Benefits tend to occur further in the future than costs

Cash Flow Diagram

Cash Flow Diagrams A Cash Flow Diagram (CFD) summarizes the costs and benefits of a project  It illustrates the size, sign, and timing of individual cash flows The time line is a horizontal line divided into equal periods such as days, months, or years.  The end of one period is the beginning of the next one. Each cash flow, such as a payment or receipt, is plotted along this line at the beginning or end of the period in which it occurs. Arrows: usual interpretation is positive (upward) for cash inflows (revenues) and negative (Downward) for cash outflows (expenses).  Length of the arrow represents the magnitude ($) of the cash flow. It is essential to use only one perspective in any CFD.  One person’s payment (cash outflow with – sign) is another person’s receipt (cash inflow with + sign)

CFD Example

Categories of Cash Flows 1. First cost ≡ construction, purchase, or installation expense. 2. Operations and maintenance ≡ annual expense. 3. Salvage value ≡ receipt at project termination. 4. Revenues ≡ annual receipts due to sale of products. 5. Overhaul ≡ major capital expenditure occurring during life of asset.

A concrete aggregate mix is required to contain at least 31% sand by volume for proper batching. One source of material, which has 25% sand and 75% coarse aggregate, sells for $3 per cubic meter (m3). Another source, which has 40% sand and 60% coarse aggregate, sells for $4.4/m3. Determine the least cost per cubic meter of blended aggregates. Example:

The least cost of blended aggregates will result from maximum use of the lower-cost material. The higher-cost material will be used to increase the proportion of sand up to the minimum level (31%) specified... Let x = Portion of blended aggregates from $3.00/m3 source 1 - x =Portion of blended aggregates from $4.40/m3 source Sand Balance x(0.25) + (1 -x) (0.40) = x x =0.31 =0.60 Thus the blended aggregates will contain 60% of $3.00/m3 material 40% of $4.40/m3 material Solution

The least cost per cubic meter of blended.aggregates.is 0.60($3.00) ($4.40) = =$3.56/m3 Solution

A machine part is manufactured at a unit cost of 0.4$ for material and 0.15$ for direct labor. An investment of $500,000 in tooling is required. The order calls for 3 million pieces. Halfway through the order, a new method of manufacture can be put into effect that wi11 reduce the unit costs to 0.34$ for material and 0.1$ for direct labor but it will require 100,000$ for additional tooling. This tooling will not be useful for future orders. Other costs are allocated at 2.5 times the direct labor cost. What if anything, should be done? Example:

Since there is only one way to handle first 1.5 million pieces, our problem concerns only the second half of the order. Alternative A: Continue with Present Method Cost for remaining 1,500,000 pieces = $1,387,500 Solution Material cost1,500,000pieces x 0.4= $600,000 Direct labor cost1,500,000pieces x 0.15= $225,000 Other costs2.50 x direct labor cost = $562,500

Alternative B: Change the Manufacturing Method Cost for remaining 1,500,000 pieces = $1,135,000 Before making a final decision, one should closely examine the Other costs to see that they do, in fact, vary as the Direct labor cost varies. Assuming they do, the decision would be to change the manufacturing method. Solution Additional tooling cost $100,000 Material cost1,500,000pieces x 0.34= $510,000 Direct labor cost1,500,000pieces x 0.1= $150,000 Other costs2.50 x direct labor cost = $375,000

Next Class Read Chapter 2 of textbook Try to do some of the problems at end of Chapter 2 Next time we’ll start the mathematical part!