ESSnuSB Open Meeting 26-27 May 2014 CERN E. Wildner J. Jonnerby, M. Martini, H. Schönauer 13/03/14EUROnuSB Lund, E. Wildner 2 W. Bartmann, E. Bouquerel,

Slides:



Advertisements
Similar presentations
RAL 27 April 2006The beta-beam task, EURISOL1 Status of the beta-beam study Mats Lindroos on behalf of the EURISOL beta-beam task.
Advertisements

ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
ISIS Accelerator Division
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Ion Accelerator Complex for MEIC January 28, 2010.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
ALPHA Storage Ring Indiana University Xiaoying Pang.
Linac4 Beam Commissioning Committee PSB Beam Optics and Painting Schemes 9 th December 2010 Beam Optics and Painting Schemes C. Bracco, C. Carli, B. Goddard,
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Options for a 50Hz, 10 MW, Short Pulse Spallation Neutron Source G H Rees, ASTeC, CCLRC, RAL, UK.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
100 MeV- 1 GeV Proton Synchrotron for Indian Spallation Neutron Source Gurnam Singh Beam Dynamics Section CAT, Indore CAT-KEK-Sokendai School on Spallation.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Proton Driver Status ISIS Accelerator Division John Thomason.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Simultaneous Delivery of Parallel Proton Beams with the EURISOL Driver
ESSnuSB Project for Leptonic CP Violation Discovery based on the European Spallation Source Linac NOW 2014, 10/9E. Wildner, CERN 2 Elena WILDNER CERN for.
PS Booster Studies with High Intensity Beams Magdalena Kowalska supervised by Elena Benedetto Space Charge Collaboration Meeting May 2014.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
NUFACT August 2014 E. Wildner, CERN 13/03/14Nufact14, Glasgow, E. Wildner 2 Accumulator Ring for the ESS Neutrino Super Beam.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
“Beam Losses” Christian Carli PSB H - Injection Review, 9 th November 2011 Several topics more or less related to beam losses, a study still somewhat at.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
FFAG Studies at RAL G H Rees. FFAG Designs at RAL Hz, 4 MW, 3-10 GeV, Proton Driver (NFFAGI) Hz,1 MW, GeV, ISIS Upgrade (NFFAG) 3.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
ESS Linac Modifications for ESSnuSB Dave McGinnis Chief Engineer / Accelerator Division August 27, 2014.
4 MW, 50 Hz, 10 GeV, 1 ns (rms), FFAG Proton Driver Study G H Rees, RAL.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
F D F November 8, 2006Alessandro G. Ruggiero1 of GeV 10-MWatt Proton Driver Target 200-MeV DTL 1.0-GeV FFAG H – Stripping Foil Injection Energy,
From the SPL to the 4-target-horn system: Preliminary design of a beam switching yard WP2: Super Beam 4 th EUROν Annual Meeting, Paris, June 13, 2012 E.
RCS design Valeri Lebedev AAC Meeting November 16-17, 2009.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Optics considerations for PS2 October 4 th, 2007 CARE-HHH-APD BEAM’07 W. Bartmann, M. Benedikt, C. Carli, B. Goddard, S. Hancock, J.M. Jowett, A. Koschik,
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
Layout and Arcs lattice design A. Chancé, B. Dalena, J. Payet, CEA R. Alemany, B. Holzer, D. Schulte CERN.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
Recycler Injection with Carbon Foils Dave Johnson, Alexandr Drozhdin, Leonid Vorobiev September 8, 2010 Project X Collaboration Meeting.
ESSnuSB Accumulator Work Plan
J-PARC main ring lattice An overview
Sara Thorin, MAX IV Laboratory
A.Lachaize CNRS/IN2P3 IPN Orsay
Alternative/complementary Possibilities
Accumulator, NUFACT17 Uppsala, E.Wildner
Status of the beta-beam study
Elena Wildner CERN CA15139 Meeting, Sofia 15/
Injector Chain General and more about p-RCS
Progress towards Pulsed Multi-MW CERN Proton Drivers
SLHC-PP kick-off meeting, CERN 9 April 2008
Joint session – Beta-beams
Kicker and RF systems for Damping Rings
Injection design of CEPC
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
Update on ERL Cooler Design Studies
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

ESSnuSB Open Meeting May 2014 CERN E. Wildner J. Jonnerby, M. Martini, H. Schönauer 13/03/14EUROnuSB Lund, E. Wildner 2 W. Bartmann, E. Bouquerel, M.Dracos, T. Ekelöf, M. Lindroos, D. Mc Ginnis, M.Eshraqi J.-P. Koutchouk, N. Vassioupolus, G. Lanfranco, Y. Papafilippo, R. Ruber and others ESSnuSB Compressor Ring

ESS H- acceleration for neutrinos The ESS Linac will be built for neutron spallation (proton acceleration 14 Hz) Duty factor low (4%); some additional capacity is available Repetition rate can be increased to 28 Hz, to permit an extra acceleration cycle Neutrino option: acceleration of 5 MW H- H- acceleration must not perturb the neutron facility Modifications (upgrades) of the Linac must permit the doubling of power (5 + 5) MW AND requirements for the pulse compression 13/03/14 3 H- ? ? ? ? ESS Technical Design Report, April 23, 2013 ESS-doc EUROnuSB Lund, E. Wildner

ESSnuSB Accumulator 13/03/14EUROnuSB Lund, E. Wildner 4 Neutrino beam ESS linac Neutron spallation target H-H- p Target/horn station Critical bend (Lorentz stripping) Switchyard Accumulator Preliminary ! No civil engineering expert work yet. τ H 1.5 μs τ 0 = 100 μs Horn current

Higher energies and the Layout 13/03/14EUROnuSB Lund, E. Wildner 5 Neutrino beam ESS linac Neutron spallation target H-H- p Preliminary ! Civil engineering to be taken into account! Target/horn station 2 GeV Achromat IF > 2 GeV Accelerating cavities

13/03/14 EUROnuSB Lund, E. Wildner 6 ESS Accumulator for neutrinos Constraints on present neutrino target focusing system – The secondary beam has to be focused – Today’s focusing systems require beam pulses shorter 3 ms (cooling, power supplies etc.) Solution: reduce beam pulse length – Compress the linac pulse in an accumulator – The accumulator size should correspond a pulse length on target < 10  s Accumulator constraints – Reasonably-sized accumulator ring – Multiturn injection of p with high intensities becomes inefficient – Too high intensities in the ring may cause collective effects and beam loss – ESS has interest in an an accumulator as well: Synergies?

13/03/14 EUROnuSB Lund, E. Wildner 7 Mitigate Difficulties with High Intensities Fraction the Linac pulse and stack the shorter pulses 1.In space: 4 accumulators, arXiv: v3 or 2.In time: several pulses pass consecutively one accumulator charge exchange injection to limit multiturn losses: use H - - ions – Needs an extra ion source (space for it!) – Merging into linac at optimal position (after MEBT?) – Intrabeam Stripping and Lorentz stripping need to be evaluated (linac) – Radiation – Etc. H- ? ? ? ?

13/03/14 EUROnuSB Lund, E. Wildner 8 4 Accumulators Technical design from EUROnu (2012) – 1 MW on each target, 4 targets – One accumulator – 2.5  s pulse length ESSnuSB – 1.25 MW on each target, 4 targets – Reasonable accumulator circumference of 430 m =>1.5  s pulse length – p would give SC of (round beam, 2.0 GeV, 100  mm mrad) – In each ring /4 => – In one ring: For protons in machine SC < – 0.2 (acceptable) – Cf SNS, C = 220 m, 200  mm mrad, protons, ….  Q=-0.3, Bf = 0.4 Bf N. Vassilopoulos

13/03/14 EUROnuSB Lund, E. Wildner 9 One accumulator 4 Accelerators for accumulation seem costly and not necessary – One accumulator could pulse 4 times with ¼ of the linac pulse length The injection bumper is too slow – Rise time for the PS Booster bumpers is10 ms (same for the fall time) We propose to make 4 linac pulses of length 2.86/4 ms (same beam power) – They would be injected sequentially into accumulator – Spaced using timing such that bumpers are comfortable – However a price has to be payed… NB: accumulation for ESS neutrons need H- but considerably longer pulses at extraction from accumulator: this is not forgotten but is less straight forward, needs more design work

Linac Pulsing 70 Hz, present baseline 13/03/14EUROnuSB Lund, E. Wildner ms 2.86 ms 28 Hz neutron neutrino 71.4 ms, 14 Hz ms 0.7 ms 71.4 ms, 14 Hz 70 Hz 2.86 ms Four Accumulators One Accumulator (baseline)

70 Hz linac pulsing 13/03/14EUROnuSB Lund, E. Wildner 11 Fill time of the superconducting cavities: For loaded Q, this is about 0.2 ms For two 3 ms beam pulses, this is 6.6% of the beam pulse length This corresponds to an inefficiency of 6.6% 4 pulses at 0.75 ms and one pulse of 3 ms: 5 x 0.2 ms = 1 ms filling time, 16.6% inefficiency (10% extra) Keep in mind: 4 rings are 4 times operation and maintenance cost, not less Can it be technically achieved (evaluation ongoing)? What about research on adapted cavity filling ? Foil heating in accumulator (see later) Communication D. Mc Ginnis

ESSnuSB Accumulator Lattice SNS C=376 m SNS straight section for injection used “as is” for simulations of foil stripping Less bending strength to ease energy upgrade No magnet considerations yet Collective effects not yet completed ESSnuSB Straight Arc C=278 m Circumference376 m Dipole field0.635 T # Dipoles64 # Quads84 Bending radius14.6 m Injection region12.5 m Revolution time1.32 μs J. Jonnerby

Multi-turn injection for hadrons Septum magnet No kicker Bump amplitude decreases and inject a new bunch at each turn Phase-space “painting” Closed orbit bumpers Varying amplitude bump

H- injection foil stripping 24 m Courtesy W. Bartmann

Injection area optics (foil/laser) Contradicting requirements for foil and laser  two different optics settings (however: the layout is the same!) 20/03/14ESSnuSB Uppsala, E. Wildner 15 Foil optics Laser optics Courtesy W. Bartmann

Foil stripping feasibility: first stage approach Simulations of MW accumulator projects have been done with the ACCSIM Code. The results are compared with the ORBIT results (courtesy M. Plum, J. Holmes) for representative SNS beams. Feasibility of Stripping foil injection H. Schönauer, CERN 13/03/14EUROnuSB Lund, E. Wildner 16

TEST CANDIDATE: ESS Linac + Exteded SNS Lattice CERN SPL PDAC Foil CERN SPL PDAC Foils SNS C [m] T [GeV] P beam5 GW / 42 GW 1 GW f rep [Hz]70 / Np 2.8E14 2.3E14 1.5E14 N turns  Norm (95%) 100 / 200  *)150  200   Linac (95%) 1.33  2  1.5  N macro Foil [  g/cm2] x *) 100  too small; better 200  like in SNS Comparison of Foil Heating Simulations for some Project Lattices with the SNS 13/03/14EUROnuSB Lund, E. Wildner 17 H. Schönauer, CERN

13/03/14EUROnuSB Lund, E. Wildner Comparison of Phase space Occupation for 100  vs. 200  normalized Emittance For an emittance of 100  the average Nr of foil hits of the circulating beam approximately doubles - the linac beam remains about the same Space Charge Detuning (approx.): (100  ), (200  ) 18 H. Schönauer, CERN

ESS Foil (Extended SNS Lattice): Peak Temperatures H- Linac H- Linac+ p circulating Maximum Foil Temperatures: 1797 K (H- Linac Beam)) 2050 K (H- + p circulating Beam) 13/03/14EUROnuSB Lund, E. Wildner 19 H. Schönauer, CERN

ESS stripping foil heating considerations I Table 1: ESS beam characteristics at injection 1.To keep constantly the foil temperature below 2500  K the pulse RMS spot size should be about 2 mm (x & y dir.) which needs betatron functions at accumulator ring injection close to 36m. 2.Protons and electrons in H - having the same velocity at foil entrance (same   &  ) the electron energy is then 1.09 MeV and its total stopping power is 1.61 MeV cm2/g. So the H - total stopping power is 4.98 MeV cm2/g. ParameterValue Ion kinetic energy 2 GeV (  = 3.1) H  pulse duration0.715 ms = 2.86 ms/4 H  pulse repetition rate70 Hz, ms H  mean pulse current 62.5 mA RMS normalized emittances and preferred beam size  x,y  0.33  m &  x,y = 2 mm with at injection  x,y  36 m Carbon foil dimensions (x, y, z) Thickness area density 17  62 mm 2  3.9  m (t c [  m]) = 750  g/cm 2 H  total stopping power at 2 GeVS p = 4.98 MeV cm 2 /g M.Martini, CERN

ESS stripping foil heating considerations (2) M.Martini, CERN

ESS stripping foil heating considerations (3) 26/05/2012M. Martini ESSnuSB Meeting 26-27/5 22 Solution of the 3D heat equation with Mathematica for the ESS beam Fig. 1: Time evolution of the maximum carbon foil temperature at the pulse spot center derived from the 3D PDE (cont. line) and the simplified 1D ODE (dotted line). Both plots differ as the 1D model does not contain the heat conduction effect Fig. 2: Time evolution of the carbon foil temperature versus the foil height (y dir.). The temperature decreases quite rapidly along the y axis (as along the x axis) For the beam characteristics of Table 1, both figures show that the foil temperature modulation in the repetitive accumulator filling cycles is quasi stable after the second long cycle, each made of four ms injection pulses (repeated every ms) plus a ms gap (empty injection cycle). Fig. 1 shows that the maximum stripping foil temperature varies between 1032  K and 2072  K M.Martini, CERN

Linac Pulsing, option if current too high ? 13/03/14EUROnuSB Lund, E. Wildner ms 2.86 ms 28 Hz neutron neutrino 71.4 ms, 14 Hz ms (0.7 * 2) ms, and half the intensity, for example (to mitigate high H- intensity) How would this option influence the linac ? 71.4 ms, 14 Hz 70 Hz 2.86 ms Four Accumulators One Accumulator Lower linac peak current

Extraction to 4 targets: Switch-yard 13/03/14EUROnuSB Lund, E. Wildner 24 E. Bouquerel Development for EUROSB ESSnuSB beam energy is lower Extraction timing is different (50 Hz -> 70 Hz) Needs ~ 100 ns gap in Accumulator Regular gaps in linac beam (chopping)

Work (-packages) for Accumulator CDR 13/03/14EUROnuSB Lund, E. Wildner 1.Accumulator design, extraction, collimation and beam dynamics 2.Laser stripping of H-, injection design and laser technology 3.Transfer lines (Lorentz’ stripping considered) and switch-yard update 4.Layout and civil engineering of accumulator and transfer lines a.Should be done with on-site expertise (local rules and guidelines) 5.Design work together with Linac experts to optimize the accumulator design (for example the linac pulsing and the beam current) 6.Estimation of radiation (mitigation) for safety, handling and equipment tolerances 7.Costing & safety (included elsewhere) 25

Summary 13/03/14EUROnuSB Lund, E. Wildner One accumulator: collaboration with ESS linac experts – Linac pulsing (and current changes) ? Lattice design: based on SNS used for simulations Laser stripping : 2025? CERN synergies ? Foil stripping solutions (necessary fallback): possible Need to select subjects out of work-list for the EU call Accumulator should be flexible (ESS neutrinos) 26