Project Name Project raised by: _____________ Picture 2 Picture 4 Picture 5 Picture 3 Picture 1
Insert full screen picture
Basic Information Hog was selected on October 26 th, 2013 at the Klein ISD Multi-Purpose Building Hog will be moved into the show facility on February 5 th, 2014 at 12:00 pm Hog will enter the show ring on February 6 th, 2014 at 11:00 am Tent sale will begin at 8:00 am on February 8 th, 2014 Auction will begin at 11:30 am on February 8 th, 2014 Insert Picture
Insert full screen picture
Weights Hog was weighed once a week on a scale provided by the ( insert school or where project was raised ) and weights are as follows: DateWeight pounds pounds pounds pounds pounds pounds pounds pounds pounds pounds **On average: 9.75 pounds were gained per week**
Insert full screen picture
Feed TypeDate StartedDate StoppedAmount Lindner # ` scoop (2 quarts) Lindner # scoop (2 quarts) MoorMan’s MoorBody ½ scoop (1 quart) MoorMan’s MoorFat ounce Beet Pulp ½ scoop (1 quart) **From to she was fed 2 handfuls of Quaker Oats to reduce diarrhea** **All feed was purchased from Hiedens Feed and Supply on Stuebner Airline Road.**
Snacks DateType Grapes Grapes Carrots Apples Bananas Insert Picture
Expenses: Start up Costs (Materials) DateDescriptionAmountStore Heat Lamp$12.95Hiedens Red Light Bulb$6.95Hiedens Feed Trough$16.95Hiedens Feed Scoop$5.00Hiedens Brush6.95Hiedens De-wormer$10.95Hiedens Rubber Boots (2 pairs)$49.98Academy Lock$9.99Academy Pig Box$29.99Academy Feed Container$14.99Tractor Supply Jolly Ball$17.99Tractor Supply Yellow Tote$11.98Lowes Wooden Stakes$11.98Lowes Step Stool$14.99Lowes Poop Rake, Shovel, and Ring Toy$43.26Tractor Supply Total: $264.90
Expenses: Start up Costs (Animal) DateAmountReasonPaid To $200.00Purchase of hogMs. Philen $10.00Barn card feeMs. Philen $5.00Entry FeeMs. Philen $50.00Pen FeeMs. Philen Total: $265.00
Expenses (Feed) DateDescriptionAmountStore Feed (3 bags of 632)$94.50Hiedens Feed (672)$28.95Hiedens Feed (672), MoorFat, and MoorBody$80.95Hiedens Feed Trough, Feed (672), and MoorBody$99.90Hiedens Total: $304.30
Baths Dates
Thank you in advance for any and all support! Insert Name and Project Name Total Project Cost: $ Insert Picture