Date of download: 6/6/2016 Copyright © 2016 SPIE. All rights reserved. Sample data showing the importance of including a leading multiplier in the cost model. Figure Legend: From: Commentary on multivariable parametric cost model for ground optical telescope assembly Opt. Eng. 2012;51(5): doi: /1.OE
Date of download: 6/6/2016 Copyright © 2016 SPIE. All rights reserved. 73% learning curve for the VLT and Gemini mirrors. Figure Legend: From: Commentary on multivariable parametric cost model for ground optical telescope assembly Opt. Eng. 2012;51(5): doi: /1.OE
Date of download: 6/6/2016 Copyright © 2016 SPIE. All rights reserved. 84% learning curve for the James Webb Space Telescope mirrors. Figure Legend: From: Commentary on multivariable parametric cost model for ground optical telescope assembly Opt. Eng. 2012;51(5): doi: /1.OE
Date of download: 6/6/2016 Copyright © 2016 SPIE. All rights reserved. Positioning of prescriptions A, B, and C on the James Webb Space Telescope. Figure Legend: From: Commentary on multivariable parametric cost model for ground optical telescope assembly Opt. Eng. 2012;51(5): doi: /1.OE