RFQ Installation Status 10/27/2015 October 27, 2015 Jim Steimel & Curtis Baffes.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
3.9GHz Coupler Cold End Robustness Study Will Couplers survive on-site and overseas shipping? D. Olis, G. Galasso, M. McGee.
324MHz FETS RFQ RF measurement and components By Aaron Cheng 18 December 2006.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Alain FRANCE for the ESS RFQ Team at CEA Saclay
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
1.3GHz Input Coupler for ILC
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
Cavity Measurements By Aaron Cheng 4 May Overview RF measurements Waveguide-coax transition.
Manufacturing process, validation and factory test
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
ORNL is managed by UT-Battelle for the US Department of Energy Fundamental Power Couplers Overview, Performance, and Plans at the Spallation Neutron Source.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
Accelerator RFQ system Anne-Catherine CHAUVEAU for the ESS RFQ Team at CEA Saclay April, 2016.
ESS RFQ INTERFACES | Didier CHIRPAZ-CERBAT CEA-ESS INTERFACES.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
RFQ Installation Plan PIP-II Meeting, 14-July-2015 C. Baffes for R. Andrews, A. Chen, Y. Czajkowski, S. Kazakov, R. Pasquinelli, D. Peterson, O. Pronitchev,
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Overview of Project X Frond-End R&D at LBNL Derun Li Project X Collaboration Meeting.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
PXIE RFQ Status RFQ Fabrication Summary Module 2 bead pull test complete (Timer will give a talk next). Vane machining continues. We are.
AD ops. - NUMI July 7, 2006 Jim Hylen/FNAL Page 1 Had been having problem with water collecting in tank under horn 1, instead of coming back to surge tank,
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Completion of the MICE-US construction project
Results of the Risk Analysis
Power coupler at DESY & for XFEL
Complementary ISTC Projects #3888, 3889p
SPS TWC 200 MHz Super Proton Synchrotron Travelling Wave Cavities 200 MHz 4 x 1.0 MW cw 25 years of experience.
12 GHz High Power RF components requirements for CEA activities
Manufacturing of the IFMIF series power couplers
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
SNS Fundamental Power Coupler History
IFMIF-EVEDA RF POWER SYSTEM
Main Coupler R&D at DESY
System tests at CEA O. Piquet 19/03/2019
V. Veshcherevich Cornell University
Presentation transcript:

RFQ Installation Status 10/27/2015 October 27, 2015 Jim Steimel & Curtis Baffes

Pictures – RFQ in place Alignment crew surveyed RFQ into place and RFQ is now connected to LEBT. RFQ has been pumped down to specified vacuum pressure. RFQ within about 1” of final location downstream of MEBT.

RFQ Water Cooling System All RFQ wall mount water cooling hardware installed. Copper manifold and instrumentation in place with hoses to follow shortly.

RFQ Input Coupler RFQ supports for input couplers complete. Left input coupler non-vacuum hardware in place, so water hoses for RFQ can be installed without interfering.

Other Milestones Hardware design of resonant control system complete. All hardware is on hand and most is already installed. Work continues on software control algorithm and interfaces. RF fanback design complete and all hardware components are on hand. Still need to order final two pieces of 6” coaxial transmission line.

Installation Order Install non-vacuum components of left coupler (done). Install hoses for RFQ cooling (copper manifold to module manifold). Install power distribution for RFQ water skids pumps and valves. Flush out vane and wall systems through water filter with module bypass hoses. Install RF pickup loop fanback switches and cables. Install working platform and cable tray. Pull instrumentation wiring. Install RF power distribution, 6” coaxial transmission lines.

M EGA INDUSTRIES, LLC RF Solutions RFQ Couplers (162.5 MHz) Status: All components minus vacuum end assemblies shipped. First end assy is brazed and leak tight. Some contamination on alumina window resulted from last braze cycle. Cleaning solutions ineffective. Sandblasting with SiO 2 with dry nitrogen should work, but trying on other alumina samples first. Should complete cleaning by Nov. 4. TiN coating completed by Nov. 12. Final forming and Vacuum tests by Nov. 17 th.

M EGA INDUSTRIES, LLC RF Solutions RFQ Couplers Second vacuum end assy is being assembled for brazing. Should complete brazing by Nov. 11. TiN coating completed Nov. 18. Final forming and vacuum tests by. Nov. 22. Last two vacuum assemblies to be completed by Dec. 15 th.

RFQ Coupler Follow-up We have requested that they focus on trying to get a clean braze on the second coupler instead of trying to clean the first coupler. If braze is successful, third coupler will follow quickly. Process for cleaning first coupler can be developed after two couplers are delivered. Mega will test extra ceramic window in braze oven with outer conductor and braze material to insure no contamination to final antenna. Mega will also hi-pot antenna between 6-10kV.

RFQ Power Amplifier Catastrophic failure of an amplifier slice during CW operation. Believed to be due to high, internal reflected power. Slice sent to vendor (under warranty) for investigation and repairs. Only left amplifier is operational, and we have no more working spares. Left amplifier was tested over the weekend at 50kW output, 20 Hz, 10% duty cycle without failure. May not be able to condition RFQ in CW mode until problem is resolved.