Terms of Reference for RCs Training of Trainers Rome, 31 May – 4 June 2010.

Slides:



Advertisements
Similar presentations
UNEP/5 th meeting of the Nairobi Convention Johannesburg, South Africa, 5-8 November UNEP/5 th meeting of the Nairobi Convention Johannesburg, South.
Advertisements

United Nations Environment Programme (UNEP) Secretariat of the Basel Convention (SBC) Enhancing cooperation between the Basel Convention and the Stockholm.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
European Clearing-House Mechanism Portal Toolkit Expert Group Meeting
High level expert meeting to develop the Near East Regional Action Plan to Implement the Global Strategy to improve Agricultural and Rural Statistics.
Progress Toward Impact Overall Performance Study of the GEF Aaron Zazueta GEF Evaluation Office Hanoi, March 10, 2010.
Workshops for implementing the Strategic Plan for Biodiversity through the National Biodiversity Strategies and Action Plans Module 2 The Biodiversity.
A Presentation by UNEP At the UNFCCC Workshop on the Adaptation Fund Fairmont Hotel Macdonald Edmonton, Alberta, Canada 3—5 May 2006.
Training of Trainers Workshop Reference Centres and Regional Partners in the Performance Review and Assessment of Implementation of the Strategy (PRAIS)
Recent developments in the UNFCCC process in relation to global observations 4 th GTOS Steering Committee Paris, 1-2 December 2009 Rocio Lichte Programme.
Training of Trainers Workshop Reference Centres and Regional Partners in the Performance Review and Assessment of Implementation of the Strategy (PRAIS)
EVALUATION IN THE GEF Juha Uitto Director
GEF Expanded Constituency Workshop 5 to 6 November 2012 New Delhi, India Roles and Responsibilities of Council Members and Focal Points.
UNCCD COP10 Decisions on Collaboration with the GEF GEF Expanded Constituency Workshop 8 to10 May 2012 Antigua and Barbuda.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
Introduction to the Training of Trainers Workshop Performance Review and Assessment of Implementation of the Strategy (PRAIS) Project 31 May – 4 June 2010,
Presentation of the UNEP/GEF project “UNCCD PRAIS” Performance Review and Assessment of the Implementation System (PRAIS) - Enabling a paradigm shift on.
Paul V. Desanker Head, LDC and CB & Outreach Units, UNFCCC Secretariat Bonn, Germany Adaptation under the UNFCCC: The National Adaptation Programme of.
Global Action Plan and its implementation in other regions Meeting for Discussion of the draft Plan for the Implementation of the Global Strategy to Improve.
Evaluation in the GEF and Training Module on Terminal Evaluations
Training of Trainers Workshop Reference Centres and Regional Partners in the Performance Review and Assessment of Implementation of the Strategy (PRAIS)
OPPORTUNITIES AND NEW DIRECTIONS THE GLOBAL MECHANISM’S COMPLEMENTARY ROLE WITH GEF: OPPORTUNITIES AND NEW DIRECTIONS Presentation to the GEF Expanded.
Training of Trainers Workshop Reference Centres and Regional Partners in the Performance Review and Assessment of Implementation of the Strategy (PRAIS)
IAOD Evaluation Section, the Development Agenda (DA) and Development Oriented Activities Julia Flores Marfetan, Senior Evaluator.
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points Western and Central Africa Dakar, May 2007.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW Meeting, April – May 2013.
SESSION 3: FROM SETTING PRIORITIES TO PROGRAMMING FOR RESULTS.
Overview of the draft work programme of the CGE First meeting of reconstituted Consultative Group of Experts on National Communications from Parties not.
Aaron Zazueta Chief Evaluation Officer 2013 EVALUATION IN THE GEF.
Introducing the Joint Reporting Component UNEP/GEF FNR_Rio project – 3 rd Project Steering Committee, March 13 th, 2012, Tehran, Iran Peter Herkenrath.
Senior Evaluation Officer GEF Independent Evaluation Office Minsk, Belarus September 2015 Evaluation in the GEF and Training Module on Terminal Evaluations.
Paul Desanker Financial and Technical Support UNFCCC secretariat Framework for Capacity- building in Developing Countries Expert Workshop.
Introduction to the UNCCD Strategy, new monitoring and assessment system and relevant COP decisions Training of Trainers Rome, 31 May – 4 June 2010.
“Enabling a Paradigm Shift towards Monitoring and Assessment with UNCCD” Official Launch of the Project and 2 nd PSC meeting Rome, Italy 31May 2010 Introduction.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS presented by Ermath Harrington GEF Regional Focal Point.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
U N C C D The new monitoring and reporting system of the UNCCD, looking for synergy options in reporting Cambridge, 10 February 2010.
1 Stockholm Convention on Persistent Organic Pollutants Clearing-house Mechanism for Information on POPs. Role of Regional Centres.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Transfer of Technology Consultative Process Wanna Tanunchaiwatana Manager, Technology Climate Change Secretariat (UNFCCC) Asia and the Pacific Regional.
Synergy and Consistency Between Activities of the UNFCCC and Other Relevant Organizations in Supporting Enabling Environments for Technology Transfer.
UNCCD reporting and review United Nations Convention to Combat Desertification Joint Task Force on Environmental Indicators Third session July 2011,
Progress made in the implementation of the Nairobi work programme Kishan Kumarsingh Chair of the SBSTA Twenty-seventh session of the Subsidiary Body for.
Developing a Monitoring & Evaluation Plan MEASURE Evaluation.
Module 2 National IEA Process Design and Organization Stakeholder’s consultative workshop/ Training on Integrated assessments methodology ECONOMIC VALUATION.
INTRODUCING INTEGRATED WATER RESOURCE MANAGEMENT IN THE ANDEAN STATES
Peer Group Synthesis 24 November 2006
UNEP/Global Mechanism support for UNCCD reporting
GEF Familiarization Seminar
Introduction to the UNCCD Strategy, new monitoring and assessment system and relevant COP decisions Training of Trainers Rome, 31 May – 4 June 2010.
Implementation Subprogramme
UNCCD COP10 Decisions on Collaboration with the GEF
Auditing Sustainable Development Goals
UNCCD COP10 Decisions on Collaboration with the GEF
Capacity-building Initiative for Transparency
44th Meeting of the Standing Committee Bonn, Germany, October 2015 Report on activities of the Strategic Plan Working Group Ines Verleye,
UNCCD COP10 Decisions on Collaboration with the GEF
UNCCD COP10 Decisions on Collaboration with the GEF
Roadmap to Enhanced Technical Regulations of WMO
UNCCD COP10 Decisions on Collaboration with the GEF
Evaluation in the GEF and Training Module on Terminal Evaluations
Earth Information Needs of UNCCD
Roles and Responsibilities of Council Members and Focal Points
UNCCD COP10 Decisions on Collaboration with the GEF
Presentation transcript:

Terms of Reference for RCs Training of Trainers Rome, 31 May – 4 June 2010

Outline Performance Review & Assessment of Implementation System What is expected from RCs (objectives, scope of work) How will they be assisted by the secretariat and GM staff (methodology) Deliverables and Timetable

Objectives of the PRAIS project and scope of work for RCs Performance Review & Assessment of Implementation System Need for effectively implementing capacity building at sub- regional regional level (ca. 140 affected country Parties and roughly 40 developed country Parties) Time constraints – long term technical back-up that facilitates and supports a scientifically rigorous monitoring exercise Starting point for more closer engagement of RCs in the UNCCD process

The scope of work performance review & assessment of implementation system Serve as implementing partners for the execution of activities of the UNCCD PRAIS project at regional/sub-regional level; Participate to a ToT and subsequently deliver training to NFPs Provide, in coordination with the secretariat and the GM staff at regional level, on-going technical support to country Parties (assistance in the successful completion of the reporting process) Participate in follow-up activities related to collection of lessons learned and feedback system Contribute and comment on SRAP/RAP synthesis

The Strategy’s new monitoring and reporting system adopted by COP 9 performance review & assessment of implementation system performance review: review of Convention’s institutions and subsidiary bodies that are reporting along a results based framework assessment of implementation: review of the Convention and The Strategy (based on indicators, best practices, financial annex and programme and project sheet). Reporting entities for the assessment of implementation are Parties (aff. And dev., UN agencies and IGOs, the GEF, SRAPs and RAPs)‏ GM and CSOs are also partially included in the assessment of implementation

PRAIS relevant decisions Decision 3/COP.8 contains The Strategy and identifies the relevant roles and responsibilities of Convention's institutions and subsidiary bodies. Decision 10/COP.9 welcomes the joint initiative of UNEP, GEF and UNCCD Secretariat to engage in long-term capacity building initiative relating to monitoring and implementation of The Strategy Decision 11/COP.9contains the Terms of Reference (ToR) of the CRIC, including the definition of what PRAIS stands for Decision 12/COP.9 stipulates that the CST is to assist the CRIC in the review of impact indicators Decision 13/COP. 9 contains the reporting requirements (indicators, targets, reporting responsibilities of UNCCD stakeholders performance review & assessment of implementation system

Performance indicators The UNCCD Secretariat and the GM assisted country Parties in fine-tuning performance indicators since 2008  Performance indicators were integrated into The Strategy but not adopted  CRIC 7 reviewed harmonised performance indicators, using input received from Parties  CRIC 8/COP 9 considered final drafts of performance indicators, including their targets and provisionally adopted them performance review & assessment of implementation system

Performance indicators: methodological aspects Draft indicators presented to CRIC 8 followed the e- SMART criteria (e economical, S specific M monitorable a r relevant t timebound)  Were drafted with the understanding that they need to correspond to the outcome areas identified by The Strategy  COP 9 provisionally adopted performance indicators but asked for an iterative process through which amendments can be incorporated into the list performance review & assessment of implementation system

Iterative process 1.In built into the reporting process through the additional information section in the report 2.Will require some work from Focal Points using the same e- SMART criteria 3.Information from the reports will be collected and synthesized for CRIC 9 together with information collected from RCs 4.CRIC 9 will review documentation prepared on the iterative process and provide recommendations 5.The UNCCD secretariat and the GM will be working until CRIC 10 on substantive changes where necessary on the performance indicators 6.PRAIS project will identify the means through which it will support this task performance review & assessment of implementation system