DWG Wind Profile Review November 11, 2014 Dan Beckstead Associate Staff Engineer.

Slides:



Advertisements
Similar presentations
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Advertisements

Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
WECC Glossary Rachel Sherrard RPIC Meeting April 28, 2009.
Loads and Resources Subcommittee Report Wally Gibson, NWPCC PCC Meeting June 10-11, 2010.
WGA West-wide Renewable Energy Zone (WREZ) Project.
Database & Lessons Learned WECC - TEPPC Technical Advisory Subcommittee Meeting San Francisco, CA November 28, 2007 Jamie Austin PacifiCorp.
Keegan Moyer Manager, Transmission Expansion Planning TEPPC Update July 16, 2014 WECC - Salt Lake City, UT.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Debra Lew NREL WestConnect Planning Meeting Western Wind and Solar Integration Study Update.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
1 Bradley Nickell Director of Transmission Planning Incorporation of Water in Transmission Planning April 2, 2013.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
Update on System Adequacy Planning (SAP) Activities May 5 th -6 th 2015 SPSG Meeting Ben Brownlee, P.E.., Dan Beckstead, Stan Holland, Vijay Satyal PhD.
WECC Response to DOE Funding Opportunity on Regional Planning Northwest Wind Integration Forum Steering Committee January 6, 2010 Tom Schneider Managing.
Use of EDWG Data by the LTPT WECC Staff October 9, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Western Renewable Energy Zone Project October 29, 2009 John Savage Oregon Public Utility Commission.
Historical Year for 2026 Common Case Load/Hydro/Wind/Solar Shapes TAS November 2015 Meeting Tom Miller- TAS Vice Chair W ESTERN E LECTRICITY C OORDINATING.
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
Modeling Working Group Progress Report to TAS TEPPC Quarterly Meeting November 2-5, 2015 Tom Miller- MWG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TAS Steering Group Meeting DWG Update July 16, 2015 Jamie Austin, PacifiCorp DWG - Chair.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
BC Coordinated Planning Group Development of BCCPG Charter Steering Committee Meeting – Conference Call Friday, May 27, – 2:30pm.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Jan Strack San Diego Gas and Electric TEPPC Overview TEPPC Review Task Force January 11, 2016 Salt Lake City, UT.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
Greg Brinkman Debbie Lew National Renewable Energy Laboratory Golden, Colorado USA Western Wind and Solar Integration Study: February TRC meeting – Transmission.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Use of EDWG Data by the LTPT WECC Staff January 15, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Dan Beckstead Associate Staff Engineer TEPPC 2026 Common Case Load.
Technical Advisory Subcommittee Quarterly Meeting August 15-16, 2016
TAS Follow-up Webinar Historical Year Energy Shape Compromise for 2026 Common Case December 14, 2015 Jim Filippi- TAS Chair Tom Miller- TAS Vice Chair.
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
Nader Samaan Xinda Ke Pacific Northwest National Laboratory (PNNL)
TEPPC Review Task Force Meeting February 4-5, 2016
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Reliability Assessment Committee Proposal TSS Meeting
Nick Hatton Associate Engineer March 9, 2017
Reliability Assessment Committee
Technical Advisory Subcommittee Process Improvement Discussion
Reliability Assessment Committee Reliability Workshop Priorities
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
RES in the North-Western EU
Western Electricity Coordinating Council
WECC 2017 SAP Work Plan Update
Context: Scenario Studies
Long Term Grid Assessment – Preparing for 2018 Studies
2018 WECC Loads and Resources Data Request Part 2
Context: Scenario Studies
Reliability Assessment Committee Reliability Workshop Priorities
ADS 2028 Phase 1 V2.2 NW Transmission Wheeling Rates
Use of EDWG Data by the LTPT
Regional Expansion NRDC Perspectives
Nader Samaan Xinda Ke Pacific Northwest National Laboratory (PNNL)
Dan Beckstead Associate Staff Engineer
WECC 2019 EWCC Update Michael Bailey, PE
Variable Generation Subcommittee Update to PCC
Jon Jensen Associate Staff Engineer
WECC 2017 SAP Work Plan Update
Western Electricity Coordinating Council
Tyler Butikofer Associate Engineer II
Managing Data Corrections Between SDWG & PDWG
Types of Energy Chemical Solar.
Presentation transcript:

DWG Wind Profile Review November 11, 2014 Dan Beckstead Associate Staff Engineer

2 Stakeholder initiated review of TEPPC’s process of selecting solar and wind profiles Ensure that TEPPC assumptions for these resources would capture the expected performance as seen by historical data To identify possible areas of discrepancy between the CFs used in TEPPC studies and expected performance Goal of Performance Review

RESULTS 13 January 2012PowerPoint Sample 3 Note: Size of zone proportional to total zone potential, not just wind

4 In the 2005 NREL wind dataset there is sufficient NREL profiles to meet historical capacity factor goals for most areas without sacrificing locational diversity Future wind sites will use the same 2005 dataset and NREL provided CF targets to meet expected wind performance throughout WECC Common Case Profiles

5

6 Duke Energy, NREL and WECC staff will work together to investigate the possibility of creating new NREL profiles for use in the TEPPC 2014 study program. o Needs buyoff from NREL o Approval from TAS o Capital cost could be an issue DWG Recommendation

Questions? Dan Beckstead Associate Staff Engineers Western Electricity Coordinating Council