Amathole District Municipality GREAT KEI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation TAINTON 350 feasibility and review of housing.

Slides:



Advertisements
Similar presentations
South African Experience of Land Reform - SG Office John Obree: Surveyor-General Cape Town.
Advertisements

Housing Growth in Leicestershire 1 February 2008.
A COMMUNITY LED PLAN FOR BISHOPSTONE? Public Meeting – 18 th October 2012.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.
Helen Bowden Nurses Home “Jewel of Granger Bay” PROVINCIAL REGENERATION PROGRAMME INVESTOR CONFERENCE 26 March 2014.
A Dialogue On Partnerships For Affordable Housing And Infrastructure Development 31 th May 2012 Cape Town.
Neighborhood Preservation and Revitalization Division Board of County Commissioners March 10, Neighborhood Improvement Plan.
DEPARTMENT OF COOPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS PRESENTATION TO THE PORTFOLIO COMMITTEE Municipal Infrastructure Grant (MIG) Projects and.
An agency of the Department of Arts and Culture Presented by: 26 FEBRUARY 2014 SAHRA PRESENTATION TO THE PORTFOLIO COMMITTEE FORMAL PROTECTION OF DISTRICT.
Cape Town BEPP – Addressing the backlogs and future demands for Social Amenities Community Services.
Land Use Plan Pilot Overview Land Use Planning Meeting Bingwi Neyaashi Anishinaabek First Nation August 11, 2011.
PRESENTATION ON THE EASTERN CAPE HOUSING CO-OPERATIVES 1.
Status Report on Standard Specifications and Codes of Practice Department of Transport RPF November 2004.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HOGSBACK 300 feasibility and review of housing.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation Nyanisweni 137 feasibility and review.
Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DORDRECHT 800 feasibility and review of.
1 Hounslow Community Resource Centre Project HCN General Meeting, 12 th June 2013.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DALIWE 900 feasibility and review of housing.
Important Legal Issues for Provincial Planning and Land Use Legislation South African Cities Network/Gemey Abrahams Consulting /Tirana Consulting July.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation EZIBELENI INFORMAL SETTLEMENT 200 feasibility.
The Planning Regions Legend (reduced): urban agglomeration rural area
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HAMBURG 500 feasibility and review of housing.
Feasibility Study GREAT KEI 6000 November 2013 PRELIMINARY DRAFT not for circulation.
Presented by DR NOZIZWE MAKGALEMELE Deputy Director General: Land Planning & Information DEPARTMENT OF LAND AFFAIRS THE LAND REGISTRATION SYSTEM OF SOUTH.
So Surely the Development West of Waterlooville Goes Against Government Policy? Yes it does, but there are reasons for this for the increased housing requirements.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KOMANI PARK CRU feasibility and review of.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation JOE SLOVO 137 feasibility and review.
The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GERMAN VILLAGE 360 feasibility and review of.
Planning for the future of our district Core strategy options Presentation to C4B Associates February 2010.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MSOBOMVU 500 feasibility and review of housing.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KUWAIT 100 feasibility and review of housing plan.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SOMERSET DRIVE 200 feasibility and review of housing.
DEPARTMENT: RURAL DEVELOPMENT & LAND REFORM LAND AUDIT REPORT PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 23 OCTOBER 2013.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SIZAKELE 400 feasibility and review of housing.
Chris Hani District Municipality ENGCOBO LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation NGCOBO MIDDLE INCOME 500 feasibility and review.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MLUNGISI 2500 feasibility and review of housing.
Amathole District Municipality INXUBA YETHEMBA LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MIDDELBURG MIDDLE INCOME 200 feasibility.
Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation LADY FRERE 800 feasibility and review of.
Integrated Strategic Development Framework KNYSNA | STATUS QUO | OCTOBER 2013 Spatial Planning KNYSNA | INTEGRATED STRATEGIC DEVELOPMENT FRAMEWORK | OCTOBER.
Spring Workshop March 10, 2007 PowerPoint Presentation.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GLENMORE 1000 feasibility and review of housing.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MAHLUBINI 348 feasibility and review.
1Your reference The Menu of Indicators and the Core Set from the South African Point of View Moses Mnyaka 13/08/2009.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation TSOMO EXT 3 (250) feasibility and review.
Amathole District Municipality MNQUMA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MNGCWE 500 feasibility and review of housing.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GCINISA 500 feasibility and review of housing.
Planning Commission Study Session: Preferred Plan July 23, 2015.
OVERVIEW OF PLANNING FRAMEWORK IN THE CONTEXT OF LOCAL GOVERNMENT IN SOUTH AFRICA Strategic Planning Learning Exchange ‘fostering learning of the global.
Mandeni Municipality Multi Year Housing Plan To house every resident of Mandeni in a sustainable and affordable way, with the necessary services, in progressive.
12 th April  What is it?  Why now?  Who’s doing it?  What are the benefits?  What will the plan look like?  How is it done?
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation BALFOUR 600 feasibility and review of housing.
PRELIMINARY DRAFT not for circulation
AGENDA The current focus on housing Do we need older people’s housing? The role of planning? National Level Local Level Opportunities to influence Planning.
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
MBABANE INFORMAL SETTLEMENTS UPGRADING PROJECT EXPERIENCE
Mr Ntandazo Vimba and Henri Marais
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Motivation for a Managed Land Settlement Programme
Presentation transcript:

Amathole District Municipality GREAT KEI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation TAINTON 350 feasibility and review of housing plan for TAINTON 350

Feasibility and Review of Housing Plan TAINTON 350 March 2014 by prepared for CNdV africa (Pty) Ltd environmental planning, urban design, landscape architecture 17 New Church Street Cape Town 8000 Tel; Fax: Kantey & Templer PO Box....., East London Tel; IQ Vision 110 Sarel Cillier Street Strand 7140 Tel; EASTERN CAPE DEPARTMENT OF HUMAN SETTLEMENTS Phillip Frame Road Chiselhurst Tel: +27 (0) GREAT KEI LOCAL MUNICIPALITY PO Box 21, Komga, 4950 Tel: (043) Fax: (043)

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 5 CONTENTS 2.1INTRODUCTION 2.1.2Purpose of the Report 2.1.2Background of this Report 2.1.3Terms of Reference 2.1.4Background to Settlement 2.2Status of Housing Project and Waiting List 2.3Land Identification and Ownership 2.4Engineering 2.5Environment 2.6Geo-tech 2.7Distribution of Social Facilities 2.8Current Spatial Development Framework 2.9Approval by Council 2.10Summary and Recommendations LIST OF FIGURES Figure 2.1.1Locality Plan Figure 2.1.2Aerial Photograph Figure 2.1.3Visual Survey Figure 2.2.1Statistical Background Figure 2.3.1Cadastral Layout Figure 2.4.1Engineering Figure 2.5.1Environment Figure 2.6.1Geo-tech Figure 2.7.1Distribution of Social Facilities Figure 2.8.1Current Spatial Development Framework LIST OF ANNEXURES Annexure 1: Ownership

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 6 CONTENTS GLOSSARY Informal Site : A Site occupied by a household or to which a household has customary rights, e.g. Permission to occupy (PTO, no longer formally in use) or community agreement via a meeting of elders including headman or chief. Formal Site : A site occupied by a household or to which a household has a registered right as recorded at the Deeds Registry with a title deed and surveyors diagram and/or registered General Plan In-Situ upgrade project : Formalising of tenure and installation of services on a land on which people are already living. Generally refers to a project larger than one unit. Greenfields project : New project site which there has been no formal or informal settlement, industry, infrastructure to date. Project sites are usually outside of existing urban development. Infill Project : New project site within existing urban development usually on under utilised or open land and which often can help to promote physical integration between spatially isolated parts of the settlement. Rectification projects : Repair or rebuilding of defective existing houses built through one or other government housing program. Erven : The plural of ‘erf’ meaning pieces of land each registered as an ‘erf’ in a deeds registry and forming part of a registered general plan. Plots : The plural of ‘plot’ meaning unregistered pieces of land informally laid out. ACRONYMS ECDHSEastern Cape Department of Human Settlement EIAEnvironmental Impact Assessment GPGeneral Plan LMLocal Municipality MHSPMunicipal Human Settlement Plan SA South Africa SANBISouth African National Biodiversity Institute SDFSpatial Development Framework

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 8 INTRODUCTION PURPOSE OF THE REPORT The purpose of this report is to describe the key elements to be taken into account when assessing the feasibility of TAINTON 350 as a Human Settlement Project and to recommend whether it should be approved or not BACKGROUND TO THIS REPORT This report is one of five Human Settlement Project feasibility reports for ……… Municipality. It is designed so that it can be part of a single document that includes the other five projects TERMS OF REFERENCE (Part C.3 Scope of work Tender No. SCMU11-12/13-A0240) The project terms of reference for the feasibility report are summarised as follows: Ascertain the feasibility of the project within each MHSP. The study shall reveal the developmental opportunities and constraints in relation to: 1.Determination of housing demand and potential beneficiary status 2.Land identification and ownership 3.Availability of bulk services and confirmation of capacity 4.Environmental conditions; 5.Geo-technical conditions 6.Alignment with Municipal Spatial Planning 7.Visual survey (area visits) 8.Future development plans of other sector departments 9.Provision of recommendation and proposals to ECDHS 2.1.4BACKGROUND TO SETTLEMENT

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 9 Locality Plan Figure Change image

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 10 Aerial Photograph Figure Change image

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 11

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 12 STATUS OF HOUSING PROJECTS AND WAITING LISTS 2.2 TAINTON 350 Population (… SDF 20...) Population (2011 Census) Ex. Units (… SDF 20...) No. Households (at 4/hh) Proposed Units (EC DHS) Waiting List (Nxuba LM) Figure 2.2.1Statistical Background

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 13 LAND IDENTIFICATION AND OWNERSHIP 2.3

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 14 Cadastral Layout Figure 2.3.1

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 15 ENGINEERING 2.4 BULK SERVICES Existing Services.... INTERNAL SERVICES Existing Services.... GEOTECHNICAL CONDITIONS.... EXISTING INTERNAL SERVICES ARE ADEQUATE AND REQUIRE NO UPGRADING Await K&T TOP STRUCTURE.... TRAFFIC IMPACT ASSESSMENT... ROADS AND ACCESSIBILITY... THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN SETTLEMENTS.

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 16 Engineering Figure 2.4.1

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 17 ENVIRONMENT 2.5

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 18 Environment Figure Change image

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 19 GEO-TECH 2.6

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 20 Geo-tech Figure 2.6.1

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 21 DISTRIBUTION OF SOCIAL FACILITIES 2.7

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 22 Distribution of Social Facilities Figure Change image

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 23 CURRENT SPATIAL DEVELOPMENT FRAMEWORK 2.8

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 24 Current Spatial Development Framework Figure 2.8.1

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 25 APPROVAL BY COUNCIL 2.9

TAINTON 350 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 June 2016 page 26 SUMMARY AND RECOMMENDATIONS SUMMARY2.10.2RECOMMENDATIONS